







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterGarage Conversion ADU in Hialeah, FL
A garage conversion ADU in Hialeah is a way to turn an attached or detached garage into a legal, rentable, or family-ready living space without adding new footprint to your lot. You keep your existing roof line, slab, and walls, and convert the interior into a studio, one-bedroom, or in-law suite with its own kitchen, bathroom, and entry. Most garage conversions here run $55,000 to $110,000 depending on whether you’re finishing a simple studio or building a full one-bedroom with a real kitchen, and most take 8 to 14 weeks from permit to final inspection.
People in Hialeah call us about this because their garage has become a storage unit on a lot that’s already maxed out. They bought a 1960s ranch in Hialeah Gardens or a concrete-block home off Palm Avenue, the kids are grown or the in-laws are moving in, and the only legal path to more living space is to convert what’s already there. We handle that conversion from first drawing to final walkthrough through our Home Additions & ADU in Hialeah division. Call (888) 418-7102 and a live person picks up, day or night.
What makes us a fit for this work in Hialeah specifically: the lots are tight, the code office is strict, and the difference between a permitted ADU and an unpermitted headache is everything. Our technicians have up to 12 years of experience on conversions and additions, and every project is backed by our 730-Day Done Right Promise. If it’s not done right, we make it right.
Key Takeaways
- Garage conversion ADUs in Hialeah typically run $55,000-$110,000 depending on scope and whether a full kitchen and bathroom go in.
- You need a building permit through the City of Hialeah, and the garage door has to be replaced with a code-compliant wall and a real entry door.
- Most conversions take 8-14 weeks; detached garage conversions can run slightly longer because of utility runs.
- Upfront pricing means the number we quote is the number you pay. No change-order games.
- Calls answered by a live person 24/7. Free project estimate and design consult available.

When You Need Garage Conversion ADU
These are the situations we see most often in Hialeah. If any of them sounds familiar, a garage conversion is probably worth pricing out.
- The in-laws are moving in and nobody’s sharing a bathroom. A 1,200-square-foot Hialeah ranch with one bathroom and three bedrooms can’t absorb an extended family without friction. A garage conversion with its own bath and entry gives privacy on both sides of the wall.
- You want rental income but the lot won’t take a new structure. Most Hialeah lots are built out to the setbacks already. A new freestanding ADU would need variances you may not get. Converting the existing garage sidesteps the setback problem entirely because the structure is already legal and in place.
- The garage floods every rainy season and instead of fixing drainage you want a slab-to-ceiling rebuild anyway. East Hialeah and areas near the canal dip closer to the water table. If you’re already dealing with repeated moisture intrusion and the garage is getting used less and less, rebuilding the interior with proper vapor barriers and a raised finish floor is smarter than fighting the same battle every June.
- You converted it yourself years ago and now you’re selling. Unpermitted garage conversions show up in the county records when a buyer’s lender pulls the file. Buyers walk, or they demand a big credit. We bring a self-converted garage to code, pull the permits, and get the final inspection signed off so the square footage is legal on paper.
- An adult child is moving home after college or a divorce and needs a real living space. A converted garage with its own entry door off the driveway gives them independence without a commute and without a second mortgage elsewhere.
- You’re caring for an aging parent and want them close but not in the same hallway. A garage conversion can be built with grab bars, a curbless shower, wider doorways, and a zero-step entry if we plan for it from the start. Retrofitting accessibility later is far more expensive.
Our Garage Conversion ADU Process
Here’s what the job actually looks like from your side of the table. No guesswork, no mystery invoices.
- On-site consult and feasibility check. We walk the garage with you. We check the slab condition, the ceiling height (you want at least 8 feet clear if possible), the wall construction, and whether the existing garage shares a wall with the house. We look at where the new plumbing will run for the bathroom and kitchen, and whether the panel has room for the additional load. In Hialeah, older homes often have 100-amp service. If yours does, that’s a real line item and we tell you upfront rather than springing it later.
- Design and permit set. We produce the drawings the City of Hialeah needs: floor plan, electrical, plumbing, and the thermal and ventilation details required when an unconditioned garage becomes a living space. Miami-Dade County has specific requirements for converting unconditioned space, and the garage door has to come out and be replaced with an insulated framed wall and a code-approved entry door. We handle the permit submission.
- Upfront price, then a signed scope. Before any work starts, you get a written scope and a fixed price. The number you see is the number you pay. If we find something behind a wall we couldn’t see on day one, we bring it to you in writing with a cost, and you decide. No surprises on the final invoice.
- Build-out. Demolition of the garage door and any interior partitions, new framing for the new wall and any interior rooms, rough plumbing and electrical, insulation, drywall, and finish work. We install a real kitchen if the plan calls for one (we like Moen fixtures and Blanco sinks for a rental-grade kitchen that holds up) and a full bathroom. Every technician on the job is background-checked and in uniform. Floor protection goes down on day one.
- Inspections and final walkthrough. The city inspects at rough-in and final. We schedule, we’re on-site for the inspection, and we correct anything the inspector flags before the final sign-off. You get the permit records confirming legal square footage. Then we walk the finished space with you and everything on the punch list gets closed before we call it done.
- 730-Day Done Right Promise. The workmanship is covered for 730 days from the day we hand you the keys. If something we built isn’t right, we make it right. Built to last, backed in writing.

Garage Conversion ADU Pricing in Hialeah
A garage conversion ADU in Hialeah runs $55,000 to $110,000 for most projects, and a simple studio can land closer to $45,000 if it’s a basic bedroom-bath setup with no kitchen. What you actually pay comes down to square footage, whether a full kitchen goes in, how much the existing structure needs, and the electrical upgrade if your panel is undersized.
Here’s a line-item breakdown to give you a realistic picture. Final pricing depends on what we find during the site walk.
| Line Item | Typical Range | Notes |
|---|---|---|
| Design and permit set | $3,500 – $7,000 | Depends on complexity; City of Hialeah permitting included |
| Demo and garage door removal | $2,500 – $5,000 | Includes disposal and replacing the door with a framed wall |
| Framing, insulation, drywall | $8,000 – $16,000 | Varies with interior partition count and ceiling height |
| Electrical (panel upgrade if needed) | $3,500 – $9,000 | A 100-amp to 150- or 200-amp service upgrade adds to this |
| Plumbing (bath + optional kitchen) | $6,000 – $14,000 | Rough-in plus fixtures; the deeper the trench, the higher the cost |
| Bathroom finishes | $5,000 – $12,000 | Tile, vanity, toilet, shower; American Standard and Delta options in the entry range |
| Kitchen (if included) | $8,000 – $20,000 | Cabinets, counters, appliances, hookups |
| Flooring | $2,500 – $6,000 | Luxury vinyl plank handles humidity better than hardwood here |
| HVAC (minisplit or extension) | $3,000 – $7,500 | Minisplits are common for a single-room conversion |
| Final finishes and paint | $2,000 – $5,000 | Interior paint, trim, hardware |
We offer 0% financing for 18 months and $1,000 off projects over $10,000. The free project estimate and design consult costs you nothing and gets you a real number instead of a range. Call (888) 418-7102 to schedule.
What affects the price most
- Kitchen or no kitchen. A full kitchen adds $8,000 to $20,000. A kitchenette or wet bar cuts that substantially and is often enough for a rental studio.
- Panel capacity. If the house is running on 100 amps and the garage conversion adds a full kitchen, an electric range, and central air, the panel needs to grow. This is the single most common surprise on older Hialeah homes.
- Slab condition and moisture. South Florida garages sit near the water table. If the slab has cracks or the lot grades back toward the garage, we address it before the finish floor goes down. Fixing it now is cheaper than replacing buckled flooring in year three.
- Detached vs. attached. A detached garage conversion means trenching utilities out and back. Attached garage conversions save on those runs and usually finish a week or two faster.
FAQs – Garage Conversion ADU
How much does a garage conversion ADU cost in Hialeah?
A garage conversion ADU in Hialeah typically costs $55,000 to $110,000 and can run as low as $45,000 for a basic studio with a bathroom and no kitchen. The biggest cost drivers are whether a full kitchen goes in, whether the electrical panel needs upgrading, and the condition of the slab and existing walls. Call (888) 418-7102 for an exact quote. The estimate is free.
Do I need a permit to convert my garage into an ADU in Hialeah?
Yes. Converting a garage into living space in Hialeah requires a building permit through the City of Hialeah, and the work has to meet Miami-Dade County requirements for converting unconditioned space. The garage door gets removed and replaced with an insulated framed wall and a code-compliant entry door, and the electrical, plumbing, and HVAC work all need inspection. Doing this without permits creates a title and lending problem when you sell. We handle the whole permit process for you. Call (888) 418-7102 to talk through your specific property.
How long does a garage conversion ADU take in Hialeah?
Most garage conversion ADUs in Hialeah take 8 to 14 weeks from permit approval to final inspection. Attached garage conversions usually finish on the shorter end because the utility runs are shorter. Detached garage conversions can take two weeks longer for trenching and utility work. The permit timeline at the city is separate from the build timeline; we can give you a realistic picture on the first call. Call (888) 418-7102 to get a schedule for your project.
Is it cheaper to convert my garage or build a new ADU?
Converting an existing garage is almost always cheaper than building a new freestanding ADU, because the foundation, walls, and roof already exist. A new detached ADU typically starts around $120,000 to $180,000 in Hialeah and requires setback compliance that many older lots can’t meet. A garage conversion typically runs $55,000 to $110,000 and reuses the structure you already own. Call (888) 418-7102 to get a side-by-side estimate for your property.
Can I rent out a garage conversion ADU in Hialeah?
Yes, if the ADU is permitted and built to code, though short-term rental rules in Miami-Dade and the City of Hialeah have specific requirements you should confirm before you list the space. A permitted, code-compliant conversion gives you the legal footing. An unpermitted one creates problems with insurance, lending, and tenant disputes. Call (888) 418-7102 and we’ll walk you through what a rental-grade build looks like.
What’s included in your 730-Day Done Right Promise?
The 730-Day Done Right Promise means if the workmanship we provided isn’t right, we make it right, for 730 days from the completion of your project. It’s one of the longest workmanship guarantees in the residential construction space. Call (888) 418-7102 to review the full terms on your specific project.
Ready to Price Your Garage Conversion ADU in Hialeah?
We do this work every week in Hialeah. We know the lots, we know the city permit office, and we know what a garage conversion actually costs before a single nail goes in. You get a signed scope, a fixed price, a background-checked and uniformed crew, and a 730-Day Done Right Promise behind everything we build.
Call (888) 418-7102 to schedule your free project estimate and design consult. A live person answers 24 hours a day, 7 days a week. We’ll walk your garage, tell you what’s realistic, and put a real number on paper. No voicemail. No surprises. From foundation to finish line.
Written by the team at Groundwork Construction Co. of Hialeah, serving Hialeah.


