A Groundwork company - serving Hialeah, FL
A new rear addition with a vaulted beamed ceiling and tall windows

New Detached ADU in Hialeah, FL

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Hialeah
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
A remodeled hall bathroom with subway tile and a floating vanity
New architectural shingles with a clean valley
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

New Detached ADU in Hialeah, FL

A new detached ADU in Hialeah typically costs between $180,000 and $340,000 for a full turnkey build, including foundation, framing, utilities, finishes, and permits. It’s a separate, self-contained home on your lot, and it takes roughly 8 to 14 months from the first site visit to the final inspection, depending on lot constraints and how quickly Hialeah’s building department moves on your permits. If you’re weighing options, our Home Additions & ADU in Hialeah page covers attached units, conversions, and permitted layouts side by side.

Detached ADUs come up a lot in Hialeah because so many lots here are either tight or already hold a main house with mature mango, avocado, and palmetto trees crowding the buildable area. It’s not always a simple yes. We’ve seen plenty of half-acres in Hialeah that will not fit a 700-square-foot unit without moving a fence line, and plenty of 50-foot lots where the setbacks work out cleanly. We walk the site before we quote, and we say so when the numbers don’t make sense. Call us at (888) 418-7102 and we’ll look at your lot.

Groundwork Construction Co. of Hialeah is a full-scope construction partner for the whole build. Foundation, framing, roofing under GAF or CertainTeed, windows under Andersen or Pella, plumbing fixtures from Moen and Delta, finishes, final inspection: one team, one contract, one number that doesn’t move. Our technicians have up to 12 years of experience, and every project carries the 730-Day Done Right Promise. If it’s not done right, we make it right. Built to last, backed in writing.

A remodeled family room with new windows and a window seat

When You Need New Detached ADU

Most of our Hialeah ADU calls start with a family trying to solve a real space problem, not a real estate investment. These are the situations where a detached unit makes sense:

  • Aging parents moving onto the property. A separate structure lets them stay close without sharing a kitchen, a hallway, or a bathroom door. It also avoids the friction of a converted garage, which was never designed for sleeping heat loads or plumbing runs.
  • Adult children back home after college or a job change. Hialeah’s rental market is tight, and a 500-square-foot unit with its own entrance, kitchenette, and laundry keeps everyone’s dignity intact.
  • You want rental income. Detached ADUs are the strongest rental format because there’s no shared wall, no shared entry, and no shared HVAC system to argue about. Tenants pay for the whole unit and you keep your house separate.
  • Your lot has a garage or shed that’s structurally dead. Teardowns happen here more than you’d think. A 1950s concrete-block garage that’s cracked and sinking is often easier to demolish and rebuild as a permitted ADU than to rehab.
  • You need full independent living space, not a bonus room. If the space will ever be a legal rental or house a relative long-term, a full kitchen, a full bath, and a separate utility meter matter. Detached units do all three without a variance on attached square footage.
  • You have a flood-zone lot and the main house is at grade. A detached unit can be built on a raised slab or stem wall to get the finished floor above the base flood elevation, which is often harder to achieve when adding attached square footage. This is a real advantage in parts of Hialeah near the canals.

Our New Detached ADU Process

Here’s what the build actually looks like, from your first call to the day you get the certificate of occupancy. No surprises, no phantom line items, and no gaps in the sequence.

  1. Site walk and feasibility check. We measure your lot, check setbacks, look at where the utilities run, and figure out where the unit can actually sit without taking out the driveway or the only shade tree. We flag the lot-line, drainage, and flood-zone issues that will drive the price before you commit to anything.
  2. Design and permit set. We put together drawings for a unit that fits your lot and budget, then handle the permit submittal to the City of Hialeah building department. Permit timelines here run longer than most people expect, so we build the realistic schedule around that.
  3. Foundation and shell. Depending on the unit’s footprint and your site grade, we’ll go with a poured slab, a raised stem wall, or a pier-and-beam setup. Framing, roof, windows, and the exterior envelope follow in one continuous push so your lot isn’t sitting in a half-built state for weeks.
  4. Utilities and rough-in. Water, sewer, and electrical are run from the main house or the street to the new unit, and we install the sub-meter so your tenant’s usage stays separate. Rough plumbing fixtures here come from Moen and Delta, which hold up well to Hialeah’s mineral-heavy water.
  5. Interior buildout. Kitchen, bath, flooring, paint, HVAC, and finish work. This is where a lot of ADU builds go sideways because the contractor is running six jobs at once. We staff it as one job with one project lead who reports back on progress and what’s next.
  6. Final inspections and walkthrough. We walk the finished unit with you, punch-list any open items, and stay with you through the final city inspections to the certificate of occupancy. The 730-Day Done Right Promise kicks in here and stays in force long after you’ve moved a tenant in.

We handle the whole build from foundation to finish line, and we don’t hand off to a subcontractor you’ve never met. Every technician on site is background-checked and arrives in uniform, and calls get answered by a live person 24/7 if something comes up after hours.

A framer checking new wall framing on a home addition

New Detached ADU Pricing in Hialeah

New detached ADU pricing in Hialeah falls in the $180,000 to $340,000 range for a complete build, with the middle of that band sitting around $220,000 to $260,000 for a 550 to 700-square-foot one-bedroom unit on a typical Hialeah lot. Below that range is almost always a sign that something isn’t included, usually site work, utility connections, or the permit and impact fees the city charges. We quote the whole job upfront, and the number you see is the number you pay.

Here’s a line-item breakdown so you can see where the money actually goes:

Line Item Typical Range
Site prep, demolition, and grading $8,000 – $22,000
Foundation (slab, stem wall, or pier-and-beam) $15,000 – $35,000
Framing, roof, and exterior walls $40,000 – $75,000
Windows, exterior doors, siding, and stucco $12,000 – $28,000
Plumbing rough-in, fixtures, and sub-meter $14,000 – $30,000
Electrical rough-in, panel, and fixtures $10,000 – $22,000
HVAC (mini-split or ducted) $8,000 – $18,000
Kitchen and bath finishes (cabinets, counters, tile) $22,000 – $48,000
Flooring, drywall, paint, and trim $12,000 – $26,000
Permits, plan review, and impact fees $10,000 – $28,000
Design, drawings, and project management $6,000 – $15,000

What moves you up or down that band: unit size, whether the lot needs fill or a retaining wall, how far the unit sits from the main house’s water and electrical service, and whether you’re running a raised foundation for flood compliance. A 400-square-foot studio with a mini-split and no dishwasher sits closer to the bottom; a 900-square-foot two-bedroom with a full kitchen and ducted HVAC sits at the top or beyond it. Existing city fees and the type of sewer connection (gravity to the street versus a lift station) are the two biggest single swings in the budget, and we nail both down during the site walk.

Every estimate we put together is a no-hassle upfront price, and we back it with 0% financing for 18 months plus $1,000 off any project over $10,000. If your lot can only hold a smaller unit or the numbers don’t work for your goals, we’ll tell you before you spend a dollar on drawings.

What Hialeah-Specific Site and Code Issues Come Up on ADU Builds?

The two most common site issues on a Hialeah ADU are water table and lot drainage. Much of Hialeah sits at or below four feet above sea level, and the flat grade means a large portion of the property floods during a summer rain event. A new detached unit needs its finished floor set above the local base flood elevation, its slab built to drain away from the unit, and its swale or French drain designed to actually carry water off the lot rather than into the neighbor’s yard. We account for this during the feasibility walk, before the slab is poured. If your lot is prone to standing water after a tropical downpour, that stays in the plan.

The other issue is the Hialeah building department’s review of accessory structures on lots with nonconforming setbacks. If your main house was built before the current zoning code and sits inside today’s side-yard setback, the ADU still has to meet the current code setbacks from the lot line, which can dramatically shrink the buildable footprint. A 30-foot side yard becomes a 10-foot buildable pad fast. We check the platted lot lines and the underlying zoning before we put a footprint on paper.

How Long Does a Detached ADU Take in Hialeah?

Plan on 8 to 14 months total from the first site visit to certificate of occupancy, with roughly 3 to 5 of those months in permitting and design. The construction itself usually runs 5 to 9 months on a unit under 800 square feet, longer if the site work is complicated. Most delays in Hialeah happen in two places: the permit round-trip, and the utility connection to the city’s water and sewer system, which can add a couple of weeks depending on the backlog. We build the schedule around these windows instead of pretending they don’t exist, so what we tell you in month one is what actually happens.

What’s the Difference Between a Detached ADU and an Attached ADU?

A detached ADU is a freestanding structure on your property with its own foundation, roof, and often its own utility sub-meter. An attached ADU shares at least one wall with the main house, or sits above the garage, or occupies a converted interior space. Detached units cost more per square foot but give you a cleaner separation, more privacy, and a more straightforward rental setup. Attached units cost less but tie into the main house’s systems. If your lot is tight, or if the budget leans low, an attached unit may be the better fit, and we cover that option on our Hialeah Home Additions & ADU page. We’ll walk you through both during the estimate.

Do I Need a Permit for a Detached ADU in Hialeah?

Yes. A detached ADU in Hialeah requires a full building permit, a zoning review, and a separate utility connection permit. The unit can’t be legally occupied or rented without a certificate of occupancy, and unpermitted units create real problems when you sell the property or refinance. We pull the permits for you, schedule the inspections, and stay on the job through final sign-off. We don’t hand you a set of drawings and tell you to submit them yourself.

What Finishes and Materials Do You Use on a New Detached ADU?

We spec finishes for durability and resale, not the cheapest option that passes inspection. Roofing comes from GAF or CertainTeed, windows from Andersen or Pella, and kitchen and bath plumbing fixtures from Moen or Delta. Those are brands we’ve installed hundreds of times on our projects, and we know which models hold up to Hialeah’s mineral-heavy water and summer humidity. Exterior siding in this climate is stucco or James Hardie, both of which handle the rain and the sun without the paint peeling off in two years. You choose from a curated set of finishes during the design phase. The whole scope runs under one contract with the 730-Day Done Right Promise, so if a fixture or an outlet fails, a single call gets it fixed.

FAQs – New Detached ADU

How much does a new detached ADU cost in Hialeah?

A new detached ADU in Hialeah typically costs $180,000 to $340,000 for a complete turnkey build, with a 550 to 700-square-foot one-bedroom unit landing around $220,000 to $260,000. Site work, flood-zone foundation requirements, sewer connection distance, and unit size are the biggest cost drivers. Call (888) 418-7102 for an exact quote. Estimates are free and the number we give is the number you pay.

Can I rent out a detached ADU in Hialeah?

Yes, if it’s built to code and permitted. A permitted detached ADU with its own certificate of occupancy, kitchen, and full bath can be rented as a separate dwelling unit. Hialeah’s zoning rules on short-term rentals versus long-term leases differ, so we recommend confirming your specific plan with the city’s planning department before design, and we can point you to the right office during the estimate.

How big can a detached ADU be in Hialeah?

Most Hialeah detached ADUs run 400 to 900 square feet, but the limit is dictated by your lot’s zoning and setbacks, not a single citywide cap. On a typical 7,500-square-foot lot, a 600-square-foot one-bedroom unit fits comfortably. On tight or nonconforming lots, expect a smaller footprint or a different location on the property. We map your actual lot during the site walk so you know the real number before you commit.

Is it cheaper to repair or replace a detached garage into an ADU versus build new?

Sometimes. A structurally sound concrete-block garage with good footing can be cheaper to convert than to tear down and build new, often by $40,000 to $80,000. But if the existing structure has foundation cracks, a sinking slab, or roof framing not built for a full dwelling load, conversion costs climb past a clean build. We check the structure on the first visit and give you both numbers. Call (888) 418-7102 to schedule a walkthrough and get a free estimate.

Can you start my ADU this year?

It depends on your permit timeline and the schedule at the time you call. We answer the phone 24/7 with a live person, so call us and we’ll tell you honestly where we stand. We don’t promise a start date we can’t hold, and we don’t start a job we can’t finish. That’s part of why the 730-Day Done Right Promise holds up.

Get a Free Estimate on Your Hialeah Detached ADU

If you’re ready to look seriously at a detached ADU on your Hialeah lot, the next step is a site walk. We’ll measure, check setbacks and flood zone, and give you a firm upfront estimate for the whole build, plus the schedule we can actually hold. Call (888) 418-7102 for a free estimate and design consult. A live person picks up every time, and if you’re calling after hours, we’re still here.

Written by the team at Groundwork Construction Co. of Hialeah, serving Hialeah.

Getting started with Groundwork in Hialeah

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Hialeah team

A local vetted partner works across Hialeah and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Hialeah? Licensed & insured · free written estimates
Call (888) 418-7102
Local Service Coverage

Request a Free Estimate in Hialeah

Tell us what you need - Groundwork Construction Co. of Hialeah responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch