







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Country Club, FL: What to Expect
Cabinets & countertops in Country Club, FL typically run $14,000 to $45,000 for a full run of new cabinetry with stone tops, and most jobs finish in two to three weeks once material lands. Cabinet installation alone sits at $4,000 to $13,000; countertops run $2,000 to $6,500. Call (888) 418-7102 to schedule a free on-site estimate and get a written, line-item price before anything gets ordered.
How the Work Actually Moves, Stage by Stage

Cabinet and countertop replacement is a sequencing job. Get the order wrong and you’re tearing out a finished backsplash to fix a scribe line. Here’s how we run it in Country Club so the whole thing lands in one pass.
Stage 1: Measure and field-verify (day 1, about 2 hours)
We don’t quote off a photo. We measure the room, check wall plumb and floor level, and confirm where the water and gas stub-outs actually sit behind the old cabinets. In Country Club’s 1970s and ’80s CBS block homes, we regularly find walls out of square by a half inch or more. That gets planned for now, not discovered on install day. You’ll decide cabinet layout and door style this week so the cabinet order can go in.
Stage 2: Demo and prep (days 2 – 3)
Old cabinets, countertop and backsplash come out. We cap or shut off the plumbing and pull any surface wiring back into a box. Cabinet boxes and any soft spots in the drywall behind them get repaired and primed before new material goes in. Expect dust and a kitchen you can’t cook in for these two days.
Stage 3: Cabinet install (days 4 – 6)
Base cabinets set first, shimmed level, screwed to studs. Uppers follow, then fillers and crown. Doors and drawers go on last so they don’t take hits during the set. If you’re adding a kitchen island, that’s set and anchored in this window. This is where the layout you approved in stage 1 either fits or doesn’t, and it’s why we measured the way we did.
Stage 4: Template and countertop fabrication (days 7 – 12, mostly waiting)
Stone gets templated only after the cabinets are locked in, never before. Quartz and granite are cut to that template at the fabricator, which is the single longest gap in the schedule. You’ll pick the slab, edge profile and sink cutout during this window. Laminate or butcher block can skip the wait and go in sooner.
Stage 5: Countertop set, sink and finish (days 13 – 15)
Slab goes down, seams get epoxied and polished, sink and faucet connect, and the dishwasher gets reconnected. We run water, check for drips, adjust doors and drawers, and walk the finished job with you. Most Country Club cabinet and countertop jobs finish inside 15 working days, faster if the fabricator isn’t backed up.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Actually Choose Between
Every one of these has a trade-off, and the “best” pick depends on how long you plan to stay and how hard the kitchen gets used.
- Stock versus semi-custom cabinets. Stock is fastest and cheapest; it comes in fixed sizes, so gaps get closed with filler strips. Semi-custom comes in quarter-inch increments and lets you fix the wall-out-of-square problem cleanly. In a Country Club block-wall kitchen, semi-custom usually looks better. KraftMaid is one of the lines we work with regularly.
- Plywood versus particleboard boxes. Plywood holds up better against South Florida humidity and a sink leak you don’t catch for a week. Particleboard is cheaper and fine in a dry, well-ventilated kitchen. In a home that’s occasionally closed up through the summer, spend on the plywood.
- Quartz versus granite. Quartz is non-porous, needs no sealing, and handles the countertop-splash reality of a busy kitchen. Granite is natural, each slab is unique, and it needs resealing about once a year. Cambria quartz is a common pick for its consistent pattern.
- Laminate versus stone. Laminate lands at the bottom of the $2,000 to $6,500 range, stone at the top. Laminate will show a hot pan and a knife scar. Stone won’t. If the kitchen is a rental or a flip, laminate is honest money.
- Sink and faucet configuration. Undermount sinks pair with stone and look cleaner; drop-in sinks work with laminate and cost less to install. Single-bowl versus double-bowl changes how much countertop you keep.
- Full overlay versus inset doors. Full overlay is standard, hides the frame, and costs less. Inset doors sit flush inside the frame and read as furniture-grade – they also cost meaningfully more and demand a builder who can hold a tight reveal.
What Cabinets & Countertops Costs in Country Club, FL

For a Country Club kitchen with new cabinets and countertops, budget $14,000 to $45,000 for the full project. The wide spread comes down to five things, and knowing which lever you’re pulling is how the number stays predictable.
| Line item | Typical range |
|---|---|
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Kitchen island | $3,000 – $10,000 |
| Full cabinets & countertops project | $14,000 – $45,000 |
The variables that push you high or low:
- Linear footage and layout. A galley half the size of a full run costs half as much in material. A large L-shape with a peninsula or island pushes toward the top.
- Material grade. Stock cabinets and laminate land low; semi-custom cabinets and quartz land high.
- Condition behind the cabinets. Hidden water damage, mold, or a wall that needs reframing adds cost. We photograph what we find and price it in writing before we touch it.
- Relocating plumbing or gas. Moving the sink or range more than a few feet means opening the wall and pulling a permit. It’s real money and it’s sometimes worth it.
- Permit scope. A like-for-like swap may not need one. Relocating plumbing, gas or electrical does. We pull the permits and pass the inspections.
Every written estimate is broken out line by line. What’s included: labor, cabinet and countertop material, removal and haul-away, install, and cleanup. What’s usually not: appliance replacement, sink and faucet unless specified, and structural or plumbing relocation. You’ll see every one of those called out before work starts, with 0% financing for 18 months and $1,000 off projects over $10,000 available. Upfront pricing, no surprises.
See the difference
Before
After
Before
After
Before
AfterWhat Country Club Homes Specifically Do to This Job
Country Club is a built-out Miami-Dade planned community, which means nearly every cabinet job here is a rebuild inside a 1970s to 1990s CBS block and stucco home, not ground-up work. That changes the job in specific ways. Block walls are stable but rarely plumb, so cabinet runs get shimmed and scribed in ways a newer wood-frame home never demands. Original plumbing from that era may be galvanized or aging PVC, and when we open the wall behind a sink we sometimes find it’s on borrowed time. That’s the moment to decide whether to address it now or later.
The other constant is Miami-Dade’s product-approval reality. Any product that touches the building envelope or the electrical work has to meet county standards that are stricter than most of Florida, and cabinet and countertop jobs that touch gas, plumbing or electrical get inspected. Country Club also has HOA rules that vary block to block, so check exterior venting and any change to a window or door opening before order day, not after. We’ve seen the same failure pattern for years: 1990s cabinets with failing particleboard around the sink base, and laminate countertops that have delaminated from steam and standing water. Both are fixable; both are cheaper to spot before install.
If the cabinet job is part of a wider scope, we handle it as Kitchen Remodeling in Country Club so the plumbing, flooring and lighting get sequenced together. Our Kitchen Remodeling service covers the broader project when you go past cabinets and countertops, and we cover the whole of Country Club from one crew. Homeowners often pair this with a Garage Conversion ADU in Country Club when they’re expanding the property, or a New Detached ADU in Country Club when a separate structure makes more sense.
Serving Country Club, FL – Our Local Coverage Area
We serve Country Club and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Cabinets & Countertops in Country Club

Most Country Club jobs finish in 2 to 3 weeks, with roughly 14 to 15 working days on site. The long gap is stone fabrication, which you can’t compress by working harder. Call (888) 418-7102 for a schedule built around your specific kitchen.
Not for a like-for-like swap with no plumbing, gas or electrical changes. You do need one if the sink or range moves, if gas lines are rerouted, or if new circuits go in. We pull the permits and pass the inspections, and we’ll tell you up front which category your job falls in – that’s a conversation, not a surprise.
Yes, and most Country Club jobs stay right where the original plumbing sits. Keeping the sink and range in place saves wall opening, permit scope and money. If moving the sink is what makes the kitchen work, we’ll show you what that costs before you decide.
Budget $14,000 to $45,000 for the full project, with cabinets alone at $4,000 to $13,000 and countertops at $2,000 to $6,500. The high end is semi-custom cabinetry with quartz and a relocated sink; the low end is stock cabinets and laminate in place. Call (888) 418-7102 for an exact quote – estimates are free.
Every cabinets and countertops project is backed by the 730-Day Done Right Promise: if it’s not done right, we make it right. That’s on top of the manufacturer warranties on the cabinets and slabs. If an adjustment is needed after install, one call and we’re back – no fine print.
Get Your Free Estimate
Call (888) 418-7102 to set up a free on-site estimate for cabinets & countertops in Country Club. We’ll walk the kitchen, measure, check what’s behind the old cabinets, and put a written line-item price in front of you – no vague bids, no change orders later. A live person answers, and the number you see is the number you pay. From foundation to finish line, built to last and backed in writing.
Written by the team at Groundwork Construction Co.












