







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
What a New Detached ADU in Fountainebleau, FL Costs and How Long It Takes
A new detached ADU in Fountainebleau runs $45,000 – $130,000 for the structure itself, with most standalone units landing near the middle of that range, and takes roughly 6 to 10 months from first design meeting to final inspection. The range is wide because the real drivers are foundation type, wind-load engineering for South Florida hurricane code, utility runs from the main house, and where your property sits relative to HOA architectural review. Call (888) 418-7102 for a free on-site estimate and we’ll walk the yard, check setbacks, and give you a written line-item number.
How a New Detached ADU Goes From First Walk-Through to Final Inspection

Detached ADU work moves in stages, and each one asks you to make a decision before the next can start. Here’s the real sequence, with the time each stage typically takes.
Stage 1: Site visit and feasibility (day 1)
We walk the yard and measure setbacks against the lot line, check where the main electrical panel sits, and look at whether the sewer lateral or septic can handle an extra fixture load. You’ll decide at this stage roughly where the unit goes and whether you want a slab-on-grade or an elevated foundation. Feasibility takes one visit for most Fountainebleau lots.
Stage 2: Design and engineering (4 – 8 weeks)
Drafting, wind-load calculations, and hurricane-rated glazing specs all happen here. South Florida requires engineered plans stamped for wind-load compliance, and that engineering is what drives the design timeline more than anything else. You’ll choose unit size, roof type, and exterior finish at this point.
Stage 3: Permitting and HOA architectural review (6 – 14 weeks, runs in parallel)
Miami-Dade County plan review and your HOA’s architectural review board (ARB) approval run at the same time. This is the stage that catches most DIY projects, because HOA plans and county plans rarely match on the first pass. You’ll sign off on final plans and the ARB application at the end.
Stage 4: Site prep and foundation (2 – 3 weeks)
Clearing, excavation, formwork, and slab pour. If your property needs utility trenching, the electrical and plumbing rough-in happens right after the slab cures. You decide at this stage whether the utility runs come from the main house or from a secondary panel.
Stage 5: Framing, envelope, and finals (10 – 16 weeks)
Walls, roof, impact windows, stucco, and interior finish, then the county inspection. You’ll pick fixtures, flooring, and paint colors during the framing window so nothing holds up the finish trade.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Actually Matter on a Detached ADU
Every detached ADU is a small house, and the decisions that separate a $45,000 build from a $130,000 build come down to a handful of choices. These are the ones we walk through with every Fountainebleau homeowner.
- Foundation type: Slab-on-grade is cheaper and faster but ties you to a flat, well-drained lot. An elevated stem-wall foundation costs more but handles the poor drainage that some 33172 lots have.
- Roof assembly: Standing-seam metal and impact-rated shingle both meet Miami-Dade wind code. Metal lasts longer and reflects the South Florida sun better; shingle costs less up front and matches the main house more easily.
- Impact glazing: Required for wind-load compliance, and the grade you pick affects insurance and resale. We install rated units from Andersen and Pella as standard options.
- Envelope finish: Stucco is the default for a matching look on most Fountainebleau homes. James Hardie fiber cement is an upgrade if you want a low-maintenance panel finish.
- Interior systems: Moen and Delta fixtures in the bathroom and kitchenette are reliable baseline choices. An American Standard or comparable water heater rounds out the mechanical package.
- Utility routing: Trenching new runs from the main house costs more than tapping an existing nearby connection. Where the panel sits on your lot changes this number by thousands.
What a New Detached ADU Costs in Fountainebleau, FL

Plan on $45,000 – $130,000 for a detached ADU in Fountainebleau, with the actual number set by size, foundation, utility distance, finish grade, and permit scope. Here’s what moves the needle:
- Unit size: A 400 sq ft studio sits near the low end; a 900 sq ft one-bedroom pushes toward the high end.
- Utility runs: Extending electrical and plumbing 60 feet from the main house adds real cost versus a 15-foot pull from an existing panel.
- Foundation and grading: A flat slab is cheaper; elevated or engineered fill on a poorly draining lot is not.
- Finish grade: Standard-grade finishes versus upgraded flooring, cabinets, and fixture lines like Blanco or Kohler products scales the interior budget.
- Permit and engineering scope: A straightforward plan set clears county review faster than one requiring variances or ARB revisions.
A written estimate from us itemizes each of these lines, plus what’s not included: landscape restoration, furniture, and any HOA application fees are typically outside the construction scope. Call (888) 418-7102 for a written quote specific to your lot.
See the difference
Before
After
Before
After
Before
AfterWhat Fountainebleau Homes and Their HOAs Do to This Job
Fountainebleau is dense with 1970s – 80s mid-rise condos, townhome clusters, and late-20th-century single-family homes, which means two things for a detached ADU project. First, many communities here require architectural review board approval for any new structure, so before we ever touch a shovel we help you submit plans that match approved styles and colors. Second, the age of surrounding buildings often means shared infrastructure, so utility tie-ins get scrutinized by your HOA and the county at once.
South Florida’s hurricane season and intense sun also shape the build: wind-load compliance, enhanced waterproofing, and UV-resistant finishes aren’t optional upgrades, and afternoon thunderstorms push framing schedules in summer months. If you’re pairing this with site work, homeowners often pair this with Concrete Driveways & Concrete Work in Fountainebleau to reach the new unit, or Paver Driveways in Fountainebleau if the HOA prefers pavers over concrete. This ADU is part of a full Home Additions & ADU in Fountainebleau scope when it sits alongside other additions, and our Home Additions & ADU service covers the broader picture. We handle this across Fountainebleau and the surrounding area.
Serving Fountainebleau, FL – Our Local Coverage Area
We serve Fountainebleau and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions About a New Detached ADU in Fountainebleau

Most detached ADU projects in Fountainebleau take 6 to 10 months, with design and permitting eating the largest chunk. Construction itself is typically 12 – 19 weeks once the permit is in hand. Call (888) 418-7102 for a timeline specific to your lot.
Yes. Miami-Dade County requires a building permit, engineered plans, and inspections for any detached ADU, and most HOAs add their own architectural review on top. We pull the permits and manage inspections as part of the job.
Rarely, and only if a suitable panel and sewer connection already sit close to the build site. In most Fountainebleau backyards we extend both from the main house. That’s a line item you’ll see clearly in the written estimate.
Expect $45,000 – $130,000 depending on size, foundation, and finish grade, with the lower end on a studio slab unit and the higher end on a larger one-bedroom with upgraded finishes. Call (888) 418-7102 for an exact quote – estimates are free.
Every ADU we build is covered by our 730-Day Done Right Promise: if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in residential construction, and it’s in writing.
Get a Free Estimate for Your New Detached ADU in Fountainebleau
A detached ADU is a real construction project, and the best way to price it is on your actual lot. When you call (888) 418-7102, a live person answers and sets up a free on-site estimate. We walk the yard, check setbacks and utility access, and hand you a written line-item quote with no surprises. Proudly serving Fountainebleau homeowners with upfront pricing and the 730-Day Done Right Promise.
Written by the team at Groundwork Construction Co.












