A Groundwork company - serving Hialeah, FL
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Sweetwater, FL

New Detached ADU in Sweetwater - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Hialeah
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A new front yard fence with a matching gate
A new paver pool deck
An open kitchen and dining area after a remodel
A freestanding soaking tub in a remodeled primary bathroom
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Sweetwater, FL: What It Takes and What It Costs

A detached ADU in Sweetwater is a separate, self-contained living structure built behind or beside your main house, and it typically runs $90,000 to $220,000 depending on size, finish level and how much utility work the lot demands. The build itself takes about 6 to 10 months from permit approval to final inspection. On Sweetwater’s tight infill lots, plan review through the City of Sweetwater building department can add another 8 to 14 weeks before a shovel touches dirt. Call (888) 418-7102 to schedule a free on-site estimate and get a written scope for your lot.

Call (888) 418-7102

How a New Detached ADU Comes Together, Stage by Stage

A remodeled family room with new windows and a window seat

This isn’t a job where “we handle everything” is a useful answer. You’ll be making real decisions at five defined points, and knowing what they are keeps the project moving instead of stalling while a crew waits on you.

Stage 1: Feasibility and survey (weeks 1 – 3)

Before anyone draws anything, we pull the property survey and check setbacks, lot coverage and the rear-yard buildable envelope. On Sweetwater’s dense lots, the survey is where the project lives or dies. You decide the rough footprint and where the structure sits relative to the main house, the pool if there is one, and the property line.

Stage 2: Design, engineering and permit submission (weeks 3 – 14)

Plans get drawn, structural engineering is stamped for high-wind requirements, and the package goes to the City of Sweetwater building department. This is the longest stretch with the least visible progress. You decide the floor plan, roofline and exterior finish here, because changing them after submission restarts the review clock.

Stage 3: Site prep and foundation (weeks 1 – 4 of construction)

Once the permit is in hand, crews clear the footprint, handle any fence or block wall sitting on the property line, pour footings and lay the slab. You decide utility routing now: water, sewer, and the electrical sub-panel location. This is your last easy chance to move a bathroom wall.

Stage 4: Shell, roof and rough-ins (weeks 4 – 14)

Concrete block walls go up, the tie-beam and roof structure follow, and crews rough in plumbing, electrical and mechanical before the walls close. Inspections happen at framing and again at rough-in. You decide window and door selections here, and this is where impact-rated products get locked in.

Stage 5: Finishes and final inspection (weeks 14 – 30)

Drywall, flooring, cabinetry, fixtures and paint. You pick finishes at the start of this stage and crews install on a fixed schedule. The final walkthrough and certificate of occupancy close the job. From there, everything is covered under our 730-Day Done Right Promise.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Weigh Before We Frame

Most of the cost spread on an ADU comes from choices you make once, so it pays to think them through up front.

  • Studio versus one-bedroom: A studio keeps you toward the low end and suits a rental or guest use. A one-bedroom with a real kitchen and full bath pushes toward the upper half of the range and rents for more.
  • Concrete block versus wood frame: Block matches Sweetwater’s existing housing stock, handles humidity well and costs more upfront. Wood frame is faster and cheaper but needs careful moisture detailing in this climate.
  • Impact-rated doors and windows: In a hurricane zone, this isn’t optional for comfort, it’s a code and insurance question. Impact products cost more than standard units but keep you compliant and can reduce wind coverage premiums.
  • Kitchen and bath fixtures: Moen and Delta faucets and an American Standard toilet are the workhorses most owners choose; a Blanco sink is worth the upgrade if the ADU will be rented long-term. Cheap fixtures are the first thing to fail.
  • Roof assembly: A low-slope or flat roof is common on Sweetwater’s block homes and needs proper membrane and drainage detail. A pitched roof costs more but sheds water faster in a downpour.

What a New Detached ADU Costs in Sweetwater, FL

A framer checking new wall framing on a home addition

Expect $90,000 to $220,000 for a detached ADU built to code in Sweetwater. The number you land on depends on five things more than anything else.

  • Size and layout: Every extra bedroom and bathroom adds plumbing and wall length. A 400 sq ft studio and a 900 sq ft two-bedroom sit at opposite ends of the range.
  • Site conditions: A tight rear lot that needs a survey correction, fence removal or a longer utility run adds cost before framing starts.
  • Utility work: Running a new sewer line or upgrading the main panel is where budgets move most. Distance from the main house matters.
  • Finish level: Builder-grade versus mid-grade finishes can swing the total by $20,000 or more on the same footprint.
  • Permit and inspection scope: Some lots require more review than others through the City of Sweetwater building department.

A written estimate from us lists each of these as a line item. What it includes is design coordination, engineering, permits pulled in your name, and inspections passed. What it typically excludes is landscaping beyond the footprint and any pool or driveway work, which homeowners often pair with Concrete Driveways & Concrete Work in Sweetwater or Paver Driveways in Sweetwater once the ADU is standing.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Sweetwater Lots and Homes Specifically Do to This Job

Sweetwater is a small, densely built city in western Miami-Dade, and almost all of that density is single-family homes on tight infill lots, not new subdivisions. That means rear and side yard additions routinely push against lot-coverage and setback limits, and crews often find existing block walls or fences built right on the property line. We check the survey and zoning review before framing, every time. The city’s building department, not Miami-Dade alone, drives the permit sequence here. Sweetwater’s largely Hispanic, Spanish-first homeowner base also matters: we walk clients through plans and inspections in Spanish when that’s what they want, and that keeps a long project moving instead of stalling on a misunderstanding. Much of the housing stock is concrete block from the mid-century through the 1970s and ’80s, and on lots like those a detached ADU has to tie into the same high-wind approvals (HVHZ product approvals, Miami-Dade NOA) as the main house. Moisture management and roof tie-downs are part of every build. If your project grows into a main-house expansion too, that’s part of a full Home Additions & ADU in Sweetwater scope we can price together. You can see the wider service on our Home Additions & ADU page, and the full Sweetwater service area we cover.

Serving Sweetwater, FL – Our Local Coverage Area

We serve Sweetwater and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – New Detached ADU in Sweetwater

A remodeled kitchen with a waterfall island and wood cabinets

Get Your Free Sweetwater ADU Estimate

We’ll come to your property, walk the lot, check setbacks and utility runs, and give you a written, line-item estimate for a new detached ADU. No vague ballpark, no pressure on the call. Estimates are free, and you get a real number on paper. Call (888) 418-7102 to schedule yours.

Written by the team at Groundwork Construction Co.

Why Sweetwater Chooses Groundwork Construction Co. of Hialeah

We set the standard for new detached ADU in Sweetwater.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Sweetwater

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Sweetwater Customers Say

Trusted by homeowners across Sweetwater and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A galley kitchen opened up to the dining room with a new peninsulaA walk-in shower with large-format tile and a built-in nicheA standing-seam metal roof over a covered porchA new bay window with a cushioned seatA new wood side gate with black hardwareA new concrete driveway with a paver border

More services in Sweetwater

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Hialeah

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Hialeah team

A local vetted partner works across Hialeah and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Sweetwater?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Sweetwater.

(888) 418-7102

Request a Free Estimate in Sweetwater

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch