Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
New Detached ADU in Westchester: What It Costs and How Long It Takes
A new detached ADU in Westchester typically runs $45,000 to $130,000 and takes 4 to 7 months from the first survey to the final inspection, depending on size, utility runs, and how much of the lot needs clearing. Detached means exactly that: a separate structure with its own foundation, roof, meter, and address, built behind or beside the main house. Call (888) 418-7102 for a free on-site estimate and a written line-item scope before you commit to anything.
How a Detached ADU Gets Built, Stage by Stage

Five stages, in this order, with the real durations we see on Westchester lots.
1. Site survey and feasibility (1 to 2 weeks)
We walk the lot with you and measure setbacks, easements, and the existing septic or sewer lateral. This is where we find out whether the back corner you had in mind actually clears the required yard distance after the county reviews it. You decide the footprint and the rough orientation here; everything downstream depends on those two choices.
2. Design and permitting through Miami-Dade County (6 to 12 weeks)
Westchester sits in unincorporated Miami-Dade, so drawings go through the county’s process rather than a city hall. Plan review is the long pole on every detached ADU we build in Westchester – budget 8 to 10 weeks once a complete set is submitted. You approve the floor plan, exterior finish, and impact glazing schedule during this stretch, and we handle the submittal and the back-and-forth with reviewers.
3. Site prep, foundation, and utilities (3 to 5 weeks)
Clearing, grading, and forming the slab-on-grade foundation. If the ADU needs a new sewer tap or a panel upgrade, the trenching and electrical work happen now, before the walls go up. You decide utility routing and whether a separate meter is worth the added cost – a decision that affects future rental flexibility.
4. Rough framing, systems, and inspections (6 to 9 weeks)
Walls, roof structure, plumbing rough-in, electrical rough-in, and mechanical. The county inspects at the frame stage and again after rough systems are in. You pick fixtures, flooring, and cabinet layout before this phase closes, because changes after the drywall goes up cost real money.
5. Finishes, final inspection, and walkthrough (4 to 6 weeks)
Stucco, drywall, paint, trim, countertops, and the final inspection sign-off. We do a full walkthrough with you before we call it done, and everything is covered by our 730-Day Done Right Promise once it is.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Make on a Westchester Detached ADU
Most of the budget swings come from these decisions, so it pays to think them through early.
- Footprint and ceiling height: A 450 to 700 square foot one-bedroom is the Westchester sweet spot. Going bigger adds foundation and roof cost fast, and taller ceilings in a South Florida climate mean more to cool.
- Impact-rated glazing: Florida Building Code high-velocity hurricane zone rules apply here, so impact windows and doors are effectively mandatory. It is a real line item – typically $8,000 to $25,000 depending on opening count – but it also lowers insurance and stands up to hurricane-season wind and rain.
- Roof assembly: A low-slope flat roof keeps the profile clean and matches the post-war Westchester look. A small pitched roof adds curb appeal but more cost and volume. Continuous roof-to-wall tie-downs are required either way.
- Kitchen and bath fixtures: We spec Moen or Delta faucets and American Standard or Blanco sinks on most ADUs – proven fixtures that hold up to year-round humidity and daily use. Cheap fixtures are the first thing tenants complain about.
- Separate meter vs. tied to the house: A dedicated meter adds cost up front but separates utility bills if you plan to rent. Tying into the main panel is cheaper and faster but muddles the accounting.
- Exterior finish: Stucco over concrete block matches the surrounding CBS homes and takes the sun without the maintenance of wood or vinyl siding. Paint systems here need to stand up to salt-laden air and heavy seasonal downpours.
What a New Detached ADU Costs in Westchester, FL

Expect $45,000 to $130,000 for a detached ADU in Westchester. Here’s what moves the number within that range:
- Size: A compact 450 sq ft studio sits near the low end; a 700-plus sq ft two-bedroom pushes toward the high end.
- Utility scope: A new sewer tap, water line, and dedicated electrical panel add cost. Reaching an existing service point saves thousands.
- Site condition: Mature trees, old slab remnants, or a tight lot that limits equipment access raise the site work.
- Finish grade: Standard spec (Moen or Delta fixtures, basic cabinetry, vinyl plank flooring) sits lower; upgraded kitchens and custom tile climb.
- Permit and engineering scope: A straightforward slab-on-grade ADU is cleaner to permit than one needing structural work at an odd grade.
A written estimate from us itemizes foundation, framing, systems, finishes, and permits line by line, so you see what you’re paying for and nothing changes once work starts. What’s typically not included: landscaping beyond grading, furniture, and appliance packages unless we spec them in. Estimates are free – call (888) 418-7102.
See the difference
Before
After
Before
After
Before
AfterWhat Westchester Lots Do to a Detached ADU
Westchester (ZIP 33165) is a built-out, post-war unincorporated Miami-Dade suburb. Nearly every job here is renovation, addition, or rebuild on 1950s to 1970s single-family lots, and that shapes this build more than anything. Lots are often dense with mature trees and older slab-on-grade CBS homes, which means we survey carefully to fit the ADU without damaging root systems or crowding the setbacks. Because Westchester is unincorporated, all permitting and inspection runs through Miami-Dade County, not a city hall – a different rhythm than a neighboring municipality like Doral. On these blocks we regularly deal with aged utility lines and undersized panels at the main house, which frequently push scope toward an upgrade before the ADU can be tied in. Impact-rated glazing and hurricane-zone tie-downs are non-negotiable in this climate. If your ADU is part of a full Home Additions & ADU in Westchester plan for the property, we can sequence both at once, and we cover every part of Westchester and nearby blocks. Homeowners often pair an ADU with new hardscape right after – Concrete Driveways & Concrete Work in Westchester handles the new access apron, and Paver Driveways in Westchester dresses up the approach.
Serving Westchester, FL – Our Local Coverage Area
We serve Westchester and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: New Detached ADU in Westchester

4 to 7 months total, with permitting through Miami-Dade County accounting for 6 to 12 weeks of that. Buildable stages run roughly 13 to 20 weeks once the permit is in hand. Call (888) 418-7102 for a timeline based on your specific lot.
Yes. A detached ADU in unincorporated Miami-Dade requires a building permit, plan review, and staged inspections. We pull the permits and manage the inspection schedule as part of the job, so you’re never chasing sign-offs.
Yes – a detached ADU is fully separate, so the main house stays untouched except for tying in utilities. If the existing panel or sewer lateral is undersized, that connection point is where scope grows. We flag it during the survey, not after walls go up.
The full range is $45,000 to $130,000, driven by size, utility scope, site condition, and finish grade. Call (888) 418-7102 for an exact written quote – estimates are free.
Every ADU we build is covered by our 730-Day Done Right Promise – one of the longest workmanship guarantees in residential construction. If something isn’t right, we make it right. Our technicians have up to 12 years of experience, and all arrive background-checked and in uniform.
Get a Free Estimate for Your Detached ADU in Westchester
Call (888) 418-7102 to schedule a free on-site estimate for your New Detached ADU in Westchester. We’ll walk the lot, talk through footprint and utility options, and hand you a written line-item quote with no surprises – plus $1,000 off projects over $10,000 and 0% financing for 18 months. Our Home Additions & ADU team answers the phone live, 24/7. From foundation to finish line, built to last and backed in writing.
Written by the team at Groundwork Construction Co.