A Groundwork company - serving Hialeah, FL
A new rear addition with a vaulted beamed ceiling and tall windows

ADU Contractors Near Me in Hialeah - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Hialeah
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A remodeled family room with new windows and a window seat
A garage converted into a guest room and home office
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
A standing-seam metal roof over a covered porch
A new bay window with a cushioned seat
A new wood side gate with black hardware
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Here is the HTML content for the page.

ADU Contractors Near Me in Hialeah, FL: Built for How Families Here Actually Build

Finding an ADU contractor near you in Hialeah means finding a builder who understands a specific local reality: permits through Miami-Dade’s HVHZ process, designs driven by an aging parent or a returning adult child, and family decisions made around a kitchen table where half the conversation happens in Spanish. Groundwork Construction Co. of Hialeah handles all three, with in-house drafting coordination, permit expediting, and bilingual project managers. Most ADU builds here land between $90,000 and $220,000. To talk through your property and your family’s needs, call (888) 418-7102. A live person answers, 24/7, and the estimate is free.

A single-story rear room addition with tall windows and a new patio

Why ADU Decisions in Hialeah Start at the Dining Table, Not the Bank

Most of the ADU work we scope in Hialeah isn’t driven by rental income projections or investor spreadsheets. It’s driven by family. A grandmother who can no longer manage the stairs in a 1960s CBS home off West 49th Street. A son moving back from Orlando with a young family and nowhere affordable to land. A daughter who wants her parents close but not in the same hallway.

That changes everything about how a project gets designed. An investment-grade ADU optimizes for resale and square footage per dollar. A family ADU optimizes for accessibility, privacy from the main house, and a front door that doesn’t require crossing through the kitchen. Those are different floor plans. They’re also different budget conversations, because the money usually comes from home equity or pooled family savings rather than a construction draw schedule.

Here’s how that shows up in our process:

  • Accessibility comes first. Wider doorways, a roll-in shower, no thresholds between rooms. A grandparent who moves in and can’t navigate the bathroom has a problem no amount of nice tile fixes.
  • Privacy gets designed in. We plan entry paths, window placement, and sometimes a shared utility wall so two households can live close without living on top of each other.
  • Payment milestones match household cash flow. Families funding a build from equity or savings don’t want a lender’s rigid draw schedule. We structure milestones around when the money is actually available.
  • Bilingual communication isn’t a courtesy here. It’s the baseline. Plans, permits, inspection notes, and change orders all get explained in the language the family actually uses at home.

This is the part generic ADU content misses entirely. A contractor who shows up with a blueprint and no plan for the conversation behind it is going to lose the job to the one who does.

What Miami-Dade’s HVHZ Permit Process Actually Adds to an ADU Timeline

An ADU in Hialeah is not a shed with plumbing. It’s a permitted dwelling unit under Miami-Dade’s High Velocity Hurricane Zone code, and that code stretches the approval window well beyond what a homeowner expects from a weekend renovation show.

Three things drive the extra 4 to 8 weeks:

  • Structural engineering sign-offs. The structure needs a sealed engineering package, and that means an engineer reviewing foundation, framing, and tie-down details before the plans ever reach a plan reviewer.
  • Impact-opening schedules. Every window and door has to be listed with its product approval number and design pressure rating. We spec systems from manufacturers like CWS and ES Windows precisely because their product approvals are on file and reviewers know them.
  • Roof-to-wall connection details. This is the one that trips up homeowners who pull their own permits. Post-Andrew code requires specific strapping and uplift resistance, and if your existing home has old, informal connections, the ADU’s attachment points need to be engineered around what’s actually there.

We bake that timeline into the schedule from day one. You’ll see the permit window on the calendar before we break ground, not as a surprise delay two months in.

There’s a related wrinkle most contractors don’t mention until it’s a problem: a lot of Hialeah homes have rear additions, converted garages, or carports that were built informally by the family years ago. Before we can legitimately attach a new structure, we often need an as-built survey to understand what’s actually standing. It’s not glamorous work, but skipping it is how a project stalls at inspection.

For the full range of what an addition project covers, see our Home Additions & ADU page.

A framer checking new wall framing on a home addition

How We Sequence an ADU Build Around South Florida’s Wet Season

Hurricane season runs June through November. The daily afternoon storms that arrive most summer days are enough to turn a partially framed structure into a water-damaged one, and exposed stucco in this humidity will crack if it cures wrong or gets rained on mid-application.

That reality drives sequencing. An ADU foundation and framing that starts after July is racing the weather, and a contractor without a plan for it will leave your project open to the elements at exactly the wrong moment. Our approach:

  • Dry-in gets prioritized. Roof and windows go on before any interior work begins, so the structure is closed against rain.
  • Stucco cures are scheduled around forecast windows, not just crew availability.
  • Materials and impact windows are staged and confirmed before framing so nothing waits exposed while a delivery is delayed.

This matters more for an ADU than for an interior remodel because the structure is new. There’s no existing roof overhead to save you when a storm rolls in at 3 p.m.

What Does an ADU Cost in Hialeah?

An ADU build in Hialeah typically runs $90,000 to $220,000, depending on size, foundation conditions, and how much of the existing home needs retrofitting to meet current code. The lower end fits a compact one-bedroom unit on a clean lot. The upper end is a full two-bedroom with accessible design features and significant site work.

Project Typical Range in Hialeah
ADU Construction (new detached unit) $90,000 - $220,000
Garage Conversion to Living Space $30,000 - $80,000
Home Addition $45,000 - $130,000
Impact Window Installation $8,000 - $25,000
Roof Replacement $8,000 - $20,000

A garage conversion often gets families most of the way to their goal for a fraction of new construction cost. It’s worth asking whether what you need is truly a new shell or a properly permitted conversion of space you already have.

Financially, we make this workable for households funding a build from equity rather than a construction loan. There’s $1,000 off projects over $10,000, 0% financing for 18 months, and a free project estimate and design consult. The number you see on the bid is the number you pay. No change-order surprises three weeks in.

Why the 730-Day Done Right Promise Matters More on an ADU

Most warranties cover a calendar year. An ADU in South Florida has to survive two full hurricane seasons and two summer wet cycles before anyone truly knows whether the workmanship holds.

Our home construction work is covered by the 730-Day Done Right Promise. If something isn’t right, we make it right, for two full calendar years after completion. On an ADU, that’s the difference between hoping the structure was built properly and knowing you have recourse if it wasn’t. The windows from ES Windows or CWS, the roof underlayment, the stucco, the roof-to-wall connections: all of it sits under a guarantee longer than most contractors’ entire customer relationship.

We also use background-checked, uniformed technicians on every project. Our technicians have up to 12 years of experience. Groundwork Construction Co. of Hialeah is state-licensed and insured, and every project goes through inspection with documentation you can hand to a future buyer.

Common ADU Scenarios We See in Hialeah

Every family’s situation is different, but a few patterns come up again and again in this city.

  • The multi-generational move-in. An aging parent needs to move in with adult children, and the family wants a separate entrance and bathroom so everyone keeps their dignity. Accessibility and privacy drive the plan.
  • The returning adult child. A son or daughter moves back with a young family. The ADU becomes a starter home on the family property, and the timeline is often tied to a lease ending.
  • The equity-funded build. No construction loan. Payments get structured around savings and home equity draws, so the milestone schedule has to match real cash flow.
  • The informal-addition cleanup. A rear room or converted garage was built without permits years ago. An as-built survey comes first, then we bring it to code before anything new gets attached.

If any of those sound familiar, that’s a conversation worth having. Estimates are free, and a live person answers the phone any hour of any day.

FAQs

Let’s Talk About Your ADU

If you’re planning an ADU in Hialeah, whether it’s for a parent moving in or a child moving back, the conversation starts with a phone call. We’ll look at your property, explain the permit path, and give you a real number upfront. Free estimate. Live person, 24/7. Call (888) 418-7102 today.

Written by the team at Groundwork Construction Co. of Hialeah, serving Hialeah, FL.

What Our Customers Say

★★★★★ 5.0 from 3+ reviews

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

- Robert Sullivan

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

- Marco Castillo

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

- Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelightsA new black aluminum pool fence with a gateA stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled hall bathroom with subway tile and a floating vanityNew architectural shingles with a clean valley

Explore more projects

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Hialeah

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Hialeah team

A local vetted partner works across Hialeah and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Hialeah? Licensed & insured · free written estimates
Call (888) 418-7102

Request a Free Estimate

Tell us what's going on in Hialeah. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch