A Groundwork company - serving Hialeah, FL
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Site Prep & Utilities · Fountainebleau, FL

ADU Site Prep & Utilities in Fountainebleau - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Hialeah
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
A new multi-panel patio door opening a kitchen to the patio
A new stained cedar privacy fence
A new paver patio with a seat wall and fire pit
A remodeled primary bathroom with a soaking tub and walk-in shower
A new clay tile roof
New double-hung windows in a dining room
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in Fountainebleau: What It Takes Before Anything Gets Built

ADU site prep & utilities in Fountainebleau usually runs $45,000 – $130,000 for the whole addition, and the site and utility work inside that number covers grading, a concrete slab or pier foundation, water, sewer, and electrical runs to the unit, and the inspections that clear them. Plan on 3 to 6 weeks of site and utility work before framing starts. Call (888) 418-7102 and we’ll walk your lot and give you a written, line-item estimate.

Call (888) 418-7102

How the Work Actually Moves, From First Cut to Final Inspection

A remodeled family room with new windows and a window seat

Site prep for an ADU is a short, dense stretch of work with a lot of inspection gates. Here’s the sequence we follow in Fountainebleau, and what you’ll be deciding along the way.

Stage 1: Utility locating and site survey (days 1 – 2)

Before a shovel touches the ground, we call in the utility locates and confirm where your water service, sewer lateral, and electrical feed actually run. On older Fountainebleau lots those lines are rarely where the plat map says. You’ll decide the final ADU footprint at this point, because setback and easement realities get locked in here.

Stage 2: Clearing, grading, and drainage (days 3 – 7)

We strip grass and debris, grade the pad to shed water away from both the ADU and the main house, and tie in drainage. South Florida’s flat lots and heavy summer rain mean this stage gets more attention than it would up north. You’ll sign off on the pad elevation before we form anything.

Stage 3: Foundation (days 8 – 16)

Depending on soil and the unit’s design, that’s either a monolithic slab or a pier-and-beam setup. We form, set rebar, and call for the footing and slab inspections. Miami-Dade inspections are scheduled, not instant, so build a few days of slack into your calendar here.

Stage 4: Underground utilities (days 17 – 26)

Sewer or septic tie-in, water line, and electrical conduit all go in the ground before the slab is closed or alongside the foundation. This is where most of the cost variance lives: a clean gravity sewer run is cheap, but a spot where you need a lift pump or a long lateral gets expensive fast. You’ll decide on the utility routing with us at this stage.

Stage 5: Inspections, backfill, and handoff to framing (days 27 – 35)

We backfill, compact, and get the utility and foundation inspections signed off. Once the county clears it, framing begins, which is where the wider Home Additions & ADU in Fountainebleau scope takes over. You’ll want a copy of every inspection card for your records.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices That Actually Change the Number

  • Slab vs. pier foundation. A standard slab is the cheaper route and suits most Fountainebleau lots. Piers cost more but handle poor or filled soil, which shows up in spots around the older multifamily parcels.
  • Gravity sewer vs. lift pump. If the ADU site sits below the main sewer line, a grinder pump adds cost and a maintenance item. Worth checking before you commit to a footprint.
  • Electrical service upgrade. If your panel can’t carry the extra load, an upgrade belongs in the utility budget. Size it once, correctly.
  • Drainage and swale work. Proper grading and a French drain or dry well cost money up front and prevent a soggy yard all wet season.
  • Conduit for future needs. Running spare conduit for data or a future EV charger is cheap now and painful later.

What ADU Site Prep & Utilities Costs in Fountainebleau, FL

A framer checking new wall framing on a home addition

Site prep and utilities typically land between $45,000 and $130,000 as part of the full ADU build. What moves you to one end or the other:

  • Lot condition and soil – poor drainage or fill soil pushes foundation cost up.
  • Distance to utilities – long sewer, water, or electrical runs add thousands.
  • Service upgrades – a new electrical panel or meter adds cost.
  • Drainage scope – swales, dry wells, and retaining work add cost.
  • Permit and inspection scope – recertification-related upgrades on older parcels factor in.

Your written estimate itemizes excavation, foundation, each utility run, and inspections. It won’t include the ADU structure itself, finishes, or landscaping unless we scope those separately. Upfront pricing, no surprises.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Fountainebleau’s Building Stock Does to a Site Prep Job

ZIP 33172 is defined by 1970s – 80s mid-rise condos and townhome clusters, and that shapes site work here. On multifamily parcels we’re often coordinating utility tie-ins with an HOA and dealing with shared infrastructure, not a clean single-family lot. Many of the 40-plus-year-old buildings have triggered Miami-Dade’s 40-year recertification, so site and utility plans need to respect existing life-safety and structural realities. Hurricane-season scheduling matters too: we front-load underground work to beat the afternoon storms and permit deadlines tied to storm readiness. We know the Fountainebleau streets and the quirks of these older parcels, and we plan around them. Homeowners often pair this with Concrete Driveways & Concrete Work in Fountainebleau to finish the access, or Paver Driveways in Fountainebleau when they want a finished look thatcompliments the new unit.

Serving Fountainebleau, FL – Our Local Coverage Area

We serve Fountainebleau and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – ADU Site Prep & Utilities in Fountainebleau

A stone counter, tile backsplash and open shelf after a kitchen remodel

Get a Free On-Site Estimate in Fountainebleau

Call (888) 418-7102 to schedule a free estimate for ADU site prep and utilities in Fountainebleau. We’ll walk your lot, locate the utilities, and hand you a written, itemized quote covering excavation, foundation, every utility run, and inspections. A live person answers around the clock, and you’ll know the full number before we break ground. Our Home Additions & ADU team covers Fountainebleau and the surrounding area, so reach out today.

Written by the team at Groundwork Construction Co.

Why Fountainebleau Chooses Groundwork Construction Co. of Hialeah

We set the standard for ADU site prep & utilities in Fountainebleau.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Fountainebleau

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Fountainebleau Customers Say

Trusted by homeowners across Fountainebleau and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new paver pool deckAn open kitchen and dining area after a remodelA freestanding soaking tub in a remodeled primary bathroomA newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelightsA new wood side gate with black hardware

More services in Fountainebleau

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Hialeah

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Hialeah team

A local vetted partner works across Hialeah and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in Fountainebleau?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Fountainebleau.

(888) 418-7102

Request a Free Estimate in Fountainebleau

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch