A Groundwork company - serving Hialeah, FL
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Site Prep & Utilities · Hialeah, FL

ADU Site Prep & Utilities in Hialeah - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Hialeah
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in Hialeah, FL: What the Job Actually Involves

Site prep and utility work for a detached or attached ADU in Hialeah usually runs $45,000 – $130,000, and the utility-and-foundation phase alone typically takes 4 – 8 weeks before any framing starts. That means excavation, a survey of what’s already buried, new water and sewer laterals, an electrical service upgrade, and a foundation that meets Miami-Dade wind and flood requirements. If you’re pricing the whole build, call (888) 418-7102 for a free on-site estimate and we’ll walk the lot with you.

Call (888) 418-7102

The Real Sequence, Stage by Stage

A single-story rear room addition with tall windows and a new patio

Utility-first ADU work isn’t one crew doing everything at once. It’s a handoff chain, and each link has a decision with your name on it. Here’s how a typical Hialeah job actually unfolds.

Stage 1: As-built survey and site walk (days 1 – 3)

Before anyone digs, we map what’s already there. Hialeah has a lot of homeowner-built rear additions, carports, and converted garages, and utilities often run in places no drawing shows. We locate buried water, sewer, and electrical, shoot grades, and confirm setbacks. You decide the ADU footprint and orientation at this stage, because moving it two feet after the survey can cost more than the survey itself.

Stage 2: Permit submission and utility locate (week 1 – 2)

We assemble the site plan, utility plan, and structural drawings and submit to Miami-Dade. Separately, we call in the 811 locate. You choose whether the service upgrade is overhead or underground; overhead is cheaper, underground survives storms better. This is also when we confirm flood zone and any HOA or deed restrictions.

Stage 3: Clearing, excavation, and trenching (weeks 2 – 4)

Trees, old slabs, and fence lines come out, then trenches go in for water, sewer, and conduit. South Florida’s water table sits high, so trenches often need dewatering and gravel bedding. You decide the depth of the sewer line tie-in point and whether to run gas at the same time (cheaper now than later).

Stage 4: Foundation and slab (weeks 3 – 6)

We pour footings and a reinforced slab or stem-wall foundation built to Miami-Dade wind and flood specs. Anchor bolts and hold-downs get set in wet concrete. You sign off on slab elevation relative to the main house, which matters when summer rain sheets across the yard.

Stage 5: Utility rough-in and inspection (weeks 5 – 8)

Plumbing, electrical conduit, and any gas lines go in and get inspected before backfill. You meet the inspector if you want. Once it passes, we backfill, compact, and you’re ready for framing.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Choose Between

Utility and foundation choices are where budgets drift. Here’s the honest trade-off on each.

  • Foundation type: monolithic slab is fastest and cheapest; stem-wall with raised floor handles flood zones better. Slab suits most Hialeah lots; raised floor is worth the premium near low-lying areas.
  • Sewer vs. septic: city sewer tie-in is standard on most Hialeah lots; a grinder pump or septic system adds cost and maintenance. Confirm capacity before you commit.
  • Electrical service: 200-amp panel upgrade is the common call for an ADU with its own meter; a subpanel off the main house is cheaper but limits load.
  • Water lateral material: PEX inside, copper or PEX on the lateral. Copper lasts longer, PEX is faster to install and resists the aggressive water chemistry some South Florida lines carry.
  • Conduit and trenching: direct-burial cable is cheaper; PVC conduit costs more now but saves you when a line fails and you’re not digging up a finished yard.

Fixtures matter less at this stage, but if you’re planning a wet bath, we spec Moen or Delta valves because the rough-in dimension affects framing. Get those locked before the plumbing inspection, not after.

What ADU Site Prep & Utilities Costs in Hialeah, FL

A framer checking new wall framing on a home addition

Plan on $45,000 – $130,000 for the full site prep and utility phase, with the range driven by lot conditions and service distances. Here’s what moves the number:

  • Distance to utilities: a 40-foot sewer run to the main is cheap; 150 feet with a pump is not.
  • Panel and service capacity: an existing 200-amp service is fine; a 100-amp plus FPL upgrade runs higher.
  • Soil and water table: high water means dewatering, gravel bedding, and sometimes a raised foundation.
  • Demo and clearing: removing an old slab, shed, or unpermitted rear structure adds cost before you build.
  • Permit scope: a straightforward site plan vs. one requiring an as-built survey of unpermitted work changes the fee and timeline.

Your written estimate lists excavation, trenching, materials, labor, permit fees, and inspection coordination line by line. What it doesn’t include: landscaping restoration, HOA fees, and any utility impact charges from the city, which we’ll flag if they apply. No-hassle upfront pricing means the number you see is the number you pay.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Hialeah Homes Specifically Do to This Job

Hialeah’s housing stock shapes ADU prep in ways a new-build lot doesn’t. Most homes here are 1950s – 1970s CBS block with flat or low-slope roofs, and a good share have an unpermitted rear room, carport, or converted garage attached. Before an ADU can proceed, we often need an as-built survey and a corrective permit for that existing work. Miami-Dade’s post-Andrew code requires tie-downs on older structures and impact-rated openings, so the ADU has to meet the same storm standards as any beachfront build. The utility situation mirrors this: rear additions have buried lines in unpredictable places, and 811 locate alone doesn’t always find them. Add South Florida’s June – November hurricane season and summer rain, and the concrete pour schedule has to flex around weather. Call (888) 418-7102 and we’ll review what’s already on your lot before anything is dug.

Serving Hialeah, FL – Our Local Coverage Area

We serve Hialeah and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked Questions

A new paver pool deck

Get Your ADU Site Prep & Utilities Estimate in Hialeah

If you’re planning an ADU in Hialeah, the site prep and utility phase is where cost overruns happen or don’t. Call (888) 418-7102 for a free on-site estimate. We’ll review your lot, confirm what’s already buried, walk your options, and hand you a line-item written quote. A live person answers 24/7 – no voicemail. Financing at 0% for 18 months and $1,000 off projects over $10,000 are available.

Written by the team at Groundwork Construction Co. of Hialeah.

Why Hialeah Chooses Groundwork Construction Co. of Hialeah

We set the standard for ADU site prep & utilities in Hialeah.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Hialeah

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Hialeah Customers Say

Trusted by homeowners across Hialeah and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new wood side gate with black hardwareA new concrete driveway with a paver borderA stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled hall bathroom with subway tile and a floating vanityNew architectural shingles with a clean valleyA new roof with clean valleys and new flashing

More services in Hialeah

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Hialeah

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Hialeah team

A local vetted partner works across Hialeah and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in Hialeah?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Hialeah.

(888) 418-7102

Request a Free Estimate in Hialeah

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch