A Groundwork company - serving Hialeah, FL
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Site Prep & Utilities · Sunset, FL

ADU Site Prep & Utilities in Sunset - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Hialeah
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
A new stained cedar privacy fence
A new paver patio with a seat wall and fire pit
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

This page is about the site work and utility connections that make an accessory dwelling unit possible in Sunset, FL, not the design or the build itself. If you’re pricing that scope, expect $45,000 – $130,000 for ADU Site Prep & Utilities in Sunset, depending on lot conditions, run distances and how much of the existing service has to be upgraded. Call (888) 418-7102 for a free on-site estimate before you commit to a number.

Most of the site and utility package runs four to eight weeks of actual work, but it sits inside a longer permit clock. The variables that move it – lot drainage, distance to the meter, soil, and whether the panel has room – are all things we read on a walkthrough, not on a phone call.

What ADU Site Prep & Utilities in Sunset actually covers

Site prep and utilities is the unglamorous half of an ADU: clearing and grading the build pad, getting power, water and sewer to the unit, and passing the inspections that prove it was done to code. In Sunset, that work runs into Miami-Dade’s post-Andrew building standards, which is why the utility trench and the slab details get scrutinized harder here than in most of the country.

Call (888) 418-7102

Our technicians have up to 12 years of experience on this kind of work, and every project carries the 730-Day Done Right Promise – if it’s not done right, we make it right.

  • Realistic total timeline: 6 – 14 weeks from permit approval to final utility inspection, weather depending.
  • Typical scope: site clearing, grading and drainage, slab or pier prep, electrical service, water and sewer runs, and inspection sign-off.
  • Price range: $45,000 – $130,000, with the spread driven by lot conditions and run lengths, not by finishes.

How we run ADU Site Prep & Utilities in Sunset, stage by stage

A garage converted into a guest room and home office

Here’s the sequence, and where you make decisions.

Stage 1 – Site walk and utility locate (day 1, 2 – 3 hours). We pull the county’s utility locate and walk the lot with you. You decide where the pad sits and how the unit is oriented. This is the stage where a bad siting decision gets caught cheaply. A 12-inch shift in the pad can avoid relocating an existing line that would otherwise add thousands.

Stage 2 – Clearing, grading and drainage (days 2 – 9). Vegetation comes out, the pad gets cut and compacted, and we set the drainage so water moves away from both the ADU and the main house. In Sunset’s flat lots, getting the fall right is the difference between a dry unit and one that takes on water during the June-to-November rainy season. You approve the drainage plan before we pour anything.

Stage 3 – Trenching and underground runs (days 9 – 20). Electrical conduit, water supply and sewer or drain lines get trenched and set to code depth. If the run has to cross existing concrete, drives or landscaping, that’s the moment you decide whether to bore under or cut and restore. Homeowners often pair this with Concrete Driveways & Concrete Work in Sunset when the trench crosses a driveway anyway, so the restoration and the new pour happen once.

Stage 4 – Electrical service and panel work (days 20 – 35). We set the meter, subpanel and grounding for the ADU, then coordinate the county inspection. If the existing service can’t carry the extra load, that’s a decision point: upgrade the main service or size the ADU to fit what’s there. This decision has the biggest price swing on the whole job.

Stage 5 – Final connections and inspection (days 35 – 50). Water and sewer get tied in, the slab or foundation prep is finished, and we walk the inspections through to sign-off. You get the signed inspection record and a written punch list before we call it done.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The choices you’ll make on ADU Site Prep & Utilities in Sunset

The spec decisions here are about durability and service life, not cosmetic taste.

  • Slab-on-grade vs. raised or pier foundation. Slab is cheaper and faster, but it locks in drainage. A raised foundation costs more and gives you access to plumbing later. On Sunset’s flat lots, slab is the usual choice unless the grade says otherwise.
  • Electrical service size. A 100-amp subpanel fits a small ADU; a 200-amp service upgrade costs more up front and leaves room for future load. Households planning a kitchenette, mini-split cooling and an EV charger should plan for the bigger service.
  • Trench depth and conduit grade. PVC conduit in the trench outlasts direct-buried cable, especially where the soil stays damp. Worth the extra cost.
  • Water supply material. PEX is standard and flexible; copper lasts longer but costs more. Moen and Delta fixtures are what we usually fit on the plumbing connections, and American Standard is common for the rough-in valves.
  • Stormwater handling. A simple French drain handles most Sunset lots. A small retention area or dry well is warranted where the lot drains toward the house.

What ADU Site Prep & Utilities costs in Sunset, FL

A framer checking new wall framing on a home addition

The full package typically runs $45,000 – $130,000 in Sunset. That’s the number you’ll get in a written estimate, and the range is real, not a placeholder.

Line item Typical range
Site clearing, grading and drainage $4,000 – $12,000
Electrical service and panel work $6,000 – $22,000
Water and sewer runs $6,000 – $25,000
Foundation and slab prep $8,000 – $28,000
Inspection coordination and closeout $2,000 – $6,000

The variables that push a job toward the top of the range:

  • Distance from the meter and sewer tap. Every extra foot of run costs money, and a lot where the ADU sits at the back of the property can add $15,000 or more.
  • Existing service condition. A panel that’s already near capacity means an upgrade, which is the single biggest swing.
  • Lot drainage and soil. Poor drainage means engineering, extra fill and more trench time.
  • Concrete cutting and restoration. Crossing a driveway or patio adds cost.
  • Permit scope. Larger ADUs and utility upgrades add inspection steps and review time.

Written estimates from us are line-item and fixed. The number you see is the number you pay, with 0% financing for 18 months and $1,000 off projects over $10,000 available. What’s not included in a base site/utility estimate is the ADU structure itself – the design and permitting, the framing, the finishes. Those are separate scopes; see the wider Home Additions & ADU in Sunset page for how the full project fits together.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Sunset homes specifically do to this job

Sunset is a west-Kendall suburban community in unincorporated Miami-Dade (ZIP 33173), and the housing stock is mostly 1970s and 1980s single-family tracts with flat or low-pitch tile roofs and stucco-over-CBS block walls. That build era matters here for one reason: the county’s post-Andrew building code is the strictest in the country on wind-load, impact glazing and roof-to-wall tie-downs. When you add an ADU, the site and utility work has to meet today’s code, and the existing structure often gets pulled into that conversation because the utility tie-ins touch the main house’s system.

Practically, that means the electrical service at the main house gets reviewed against current standards during the utility inspection, and the tie-in point becomes a place where a 40-year recertification punch list can surface. We see it constantly on the older tracts off Sunset Drive and near the Kendall border – homes that are perfectly sound but where the original panel and the original lateral are at the end of their useful life. The subtropical climate adds to it: heavy summer rain and sun cycle stucco at the block joints, and flat-roof seams become chronic leak points, so drainage details around the new pad matter more than they would in a drier climate.

We cover this work across Sunset and the surrounding area, and we see a lot of properties where the pad and trench work has to respect mature trees, existing driveways and pool decks. That’s not a problem, but it’s a design input we account for from the first walkthrough.

Serving Sunset, FL – Our Local Coverage Area

We serve Sunset and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – ADU Site Prep & Utilities in Sunset

A new wood side gate with black hardware

Get a free estimate on ADU Site Prep & Utilities in Sunset

Call (888) 418-7102 to schedule a free on-site estimate. We’ll walk the lot, check the existing panel and utility taps, and give you a line-item written quote with the permit and inspection steps laid out. If the trench crosses a driveway, we can price Paver Driveways in Sunset alongside it so you’re not restoring concrete twice. Calls are answered by a live person 24/7, and the quote is fixed.

Written by the team at Groundwork Construction Co.

Why Sunset Chooses Groundwork Construction Co. of Hialeah

We set the standard for ADU site prep & utilities in Sunset.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Sunset

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Sunset Customers Say

Trusted by homeowners across Sunset and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new concrete driveway with a paver borderA stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled hall bathroom with subway tile and a floating vanityNew architectural shingles with a clean valleyA new casement window over a kitchen sinkA new white vinyl privacy fence with a double gate

More services in Sunset

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Hialeah

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Hialeah team

A local vetted partner works across Hialeah and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in Sunset?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Sunset.

(888) 418-7102

Request a Free Estimate in Sunset

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch