A Groundwork company - serving Hialeah, FL
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Coral Terrace, FL

New Detached ADU in Coral Terrace - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Hialeah
A remodeled family room with new windows and a window seat
A garage converted into a guest room and home office
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
A standing-seam metal roof over a covered porch
A new bay window with a cushioned seat
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Coral Terrace, FL: What It Costs and How Long It Takes

A new detached ADU in Coral Terrace runs $45,000 – $130,000 for the construction scope, with most freestanding units on a 7,500-square-foot lot landing in the $110,000 – $220,000 range once foundation, utilities, and wind-rated everything are counted. Plan on 6 – 10 months from permit submittal to final inspection, because Miami-Dade County reviews and HVHZ inspections set the pace here. Call (888) 418-7102 for a free on-site estimate before you commit to a footprint.

Call (888) 418-7102

How We Build a Detached ADU Here, Stage by Stage

A single-story rear room addition with tall windows and a new patio

Detached means detection: a separate structure on your lot has its own foundation, its own utility runs, and its own inspection sequence. That’s the source of both the cost and the timeline. Here’s the order we actually work in.

1. Site walk and footprint decision (week 1)

We measure setbacks, check where the septic or sewer lateral runs, and confirm what your lot can legally hold under Miami-Dade’s zoning for an unincorporated parcel. You decide the footprint and the height: a single-story 500-square-foot studio, a two-bedroom 750-square-foot unit, or a garage-with-ADU-over layout. Every later cost hangs off this decision, so it’s worth the second visit.

2. Permit drawings and county submittal (weeks 2 – 6)

Architectural and structural drawings, wind-load calculations, and product approvals for the High Velocity Hurricane Zone all go in one submittal to the Miami-Dade County Building Department. Coral Terrace sits outside any city hall, so everything runs through the county. Review typically takes 4 – 8 weeks, longer if the plan reviewer kicks back the roof tie-downs or flood-zone elevation.

3. Site prep and foundation (weeks 6 – 10)

We strip sod, set the building pad to grade, and pour footings and slab. On these narrow lots, material staging and the concrete truck’s reach are the schedule driver, not the labor. You confirm drainage direction and the utility trench path before the concrete goes down.

4. Framing, envelope, and rough-in (weeks 10 – 22)

Block walls or wood frame, then the roof system with the tie-downs the FBC requires, then window and door openings with impact-rated units. Electrical, plumbing, and HVAC rough-in get inspected before anything closes up. You pick fixtures, finishes, and the mini-split or central system during this stretch.

5. Finishes, final inspection, and walkthrough (weeks 22 – 34)

Drywall, tile, trim, cabinets, and paint, then the final county inspection and a walkthrough with you. We hand over a punch list and stay on it until it’s closed. Every ADU we build is covered by our 730-Day Done Right Promise.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices That Shape Your Detached ADU

  • Footprint and unit size: a 400-square-foot studio keeps you near the $45,000 – $90,000 floor; a 700 – 900-square-foot one-bedroom pushes toward $130,000 and up. Bigger means more foundation, more roof, more HVAC.
  • Structure type: concrete-block and CBS matches the coral-block homes around you and handles humidity well; wood frame is faster and cheaper but needs careful moisture detailing. Both must meet HVHZ wind requirements.
  • Roof: barrel tile matches the neighborhood vernacular and lasts decades at a higher material cost; standing-seam metal or architectural shingle costs less to install. All of it needs the wind uplift rating the county requires.
  • Openings: impact-rated windows and doors are the practical choice in this zone; ordinary glass with shutters adds a step for whoever lives there. Budget this line early.
  • Mechanical: a ductless mini-split for a studio, a small central system for a full unit. Confirm the electrical service has room before you commit.
  • Exterior finish: stucco reads as native here; fiber-cement siding (James Hardie) holds paint well but looks more contemporary than the surrounding CBS stock.

What a New Detached ADU Costs in Coral Terrace, FL

A framer checking new wall framing on a home addition

The construction line for a detached ADU in Coral Terrace lands between $45,000 and $130,000 for the build itself. Add design and county permitting, and most completed units climb into the Home Additions & ADU in Coral Terrace range. Five things move the number:

  • Size and complexity: every extra 100 square feet brings foundation, roof, and mechanicals with it.
  • Utility distance: the further the ADU sits from your main panel and sewer lateral, the more trenching and the more cost.
  • Lot conditions: flood-zone elevation, poor drainage, or an old ficus root mass under the pad all add earthwork.
  • Material grade: tile roof, impact glazing, and custom cabinetry sit at the high end; shingle and stock finishes sit at the low end.
  • Permit scope: an ADU with its own electrical meter and address requires a bigger county submittal than one tied to the main house.

A written estimate from us is line-item: site prep, foundation, framing, roof, openings, rough-in, finishes, and permit fees, each with a number. What it doesn’t include unless you ask: landscaping repair, a separate utility meter, and furniture. No change orders without your signature, and the number you see is the number you pay. If you’re also fixing the approach, homeowners often pair this with Concrete Driveways & Concrete Work in Coral Terrace or Paver Driveways in Coral Terrace so the new unit has a real path to it.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Coral Terrace Lots Specifically Do to This Job

Coral Terrace is a built-out, unincorporated pocket of greater Miami, and nearly every project here is a rebuild or an addition on a mid-century lot. Because the neighborhood sits outside any city hall, all permitting runs through Miami-Dade County’s Building Department, which shapes scheduling and inspection sequencing on every detached ADU. The homes we work around are mostly 1950s – 1970s concrete-block and CBS single-story houses with barrel-tile or shingle roofs and original terrazzo, many with carports and mature ficus and oak canopies. Fixed 7,500-square-foot lots mean setbacks are tight and crane placement for roof trusses is a real planning decision, not an afterthought. The subtropical climate and June – November hurricane season mean the High Velocity Hurricane Zone drives product approvals and inspections, while flood-zone and wind-mitigation rules govern the foundation and roof tie-downs. If you’re tackling a wider rebuild, this is usually part of a Home Additions & ADU plan rather than a standalone project.

Serving Coral Terrace, FL – Our Local Coverage Area

We serve Coral Terrace and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – New Detached ADU in Coral Terrace

New architectural shingles with a clean valley

Get a Free On-Site Estimate for Your Detached ADU

When you call (888) 418-7102, a live person answers, day or night. We’ll schedule a free on-site visit for your Coral Terrace property, walk the lot with you, talk footprint and setbacks, and hand you a written line-item estimate with no surprises. We cover Coral Terrace and the surrounding neighborhoods. Ask about our $1,000 off projects over $10,000 and 0% financing for 18 months. Estimates are free.

Written by the team at Groundwork Construction Co.

Why Coral Terrace Chooses Groundwork Construction Co. of Hialeah

We set the standard for new detached ADU in Coral Terrace.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Coral Terrace

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Coral Terrace Customers Say

Trusted by homeowners across Coral Terrace and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A freestanding soaking tub in a remodeled primary bathroomA newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelightsA new wood side gate with black hardwareA new concrete driveway with a paver borderA stone counter, tile backsplash and open shelf after a kitchen remodel

More services in Coral Terrace

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Hialeah

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Hialeah team

A local vetted partner works across Hialeah and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Coral Terrace?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Coral Terrace.

(888) 418-7102

Request a Free Estimate in Coral Terrace

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch