Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
New Detached ADU in Sunset, FL: What It Takes and What It Costs
A new detached ADU in Sunset, FL typically runs $45,000 – $130,000 and takes 5 – 8 months from signed plan to move-in, depending on size, site work, and how fast Miami-Dade County moves your permits. That range covers a small studio unit at the low end and a two-bedroom, impact-rated build at the top. Call (888) 418-7102 to schedule a free on-site estimate and walk your lot with us.
How We Build a Detached ADU in Sunset, Stage by Stage

The honest version, because a detached unit is the most permit-heavy project a homeowner can take on.
1. Site walk and feasibility (week 1)
We measure the yard, check setbacks against Miami-Dade zoning for your Sunset lot, and test what’s underground: sewer lateral or septic, water line, and where the panel sits. You decide the footprint and where the structure goes. Nothing gets drawn until we know the site works.
2. Permits and engineering (weeks 2 – 10)
Miami-Dade County’s post-Andrew wind-load rules mean your ADU needs engineered tie-downs, impact glazing, and roof-to-wall connections signed off before a shovel hits dirt. This is where the schedule lives or dies. We handle the submittal and the inspection scheduling so you’re not chasing the portal.
3. Foundation and slab (weeks 11 – 13)
Form, rebar, and pour for the slab or stem wall, with the plumbing stubbed under it before concrete goes down. You make one decision here: floor slab versus raised stem wall. Slab is cheaper; stem wall handles drainage better on lots that flood.
4. Framing, roof, and envelope (weeks 14 – 20)
CBS block or wood frame, your call, then sheathing, impact windows, and a low-slope or tile roof that matches the main house. Rough-in electrical, plumbing, and HVAC go in before drywall. You approve window and door selections at this stage, and lead time on impact glazing can add two to three weeks.
5. Finish, final inspection, and punch (weeks 21 – 30)
Drywall, flooring, cabinets, fixtures, paint. Then the county’s final inspections: building, electrical, plumbing, and mechanical, each separate. We walk the punch list with you before we call it done. A complete detached unit usually lands right around week 30, plus whatever review delays the county throws at us.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between
- Size and layout. A studio around 400 sq ft keeps you near the $45,000 – $60,000 floor. A two-bedroom near 800 sq ft pushes toward $110,000 – $130,000. Bigger means more foundation, more roof, more HVAC.
- Build method: CBS block vs. wood frame. Block is the Sunset standard and handles humidity and termites better; it costs more in labor. Frame is faster and cheaper, but you’ll want it detailed hard for moisture.
- Impact glazing. Andersen and Pella impact-rated windows and doors are the durable choice for a South Florida ADU and satisfy the wind-borne-debris code. Standard windows need shutters or panels, which is cheaper upfront and a hassle every June.
- Roof type. Flat or low-slope tile to match the 1980s Sunset villas, or a shingle roof that’s easier on budget but has to be rated for the wind zone. This is the detail that drives long-term leak risk here.
- Kitchenette and bath level. A full kitchen with KraftMaid cabinets and a full bath versus a kitchenette and half bath. This single choice moves the number by $15,000 – $25,000.
- Utilities. Separate meter and panel for the ADU (cleaner for rental) versus tapping the main house service (cheaper).
What New Detached ADU Costs in Sunset, FL

Plan on $45,000 – $130,000 for a new detached ADU in Sunset. Here’s what pushes a job to the low versus the high end:
- Size. Every additional square foot adds framing, roofing, and finish. A 400 sq ft studio and an 800 sq ft two-bedroom are two different budgets.
- Site work. Long utility runs to the back of the lot, drainage, or a slab that needs extra prep all add thousands before the first wall goes up.
- Material grade. Builder-grade fixtures and flooring versus premium cabinets, tile, and impact windows.
- Permit scope. A straightforward detached unit versus one that needs a variance for setbacks or extra engineering for a tricky lot.
- Utilities. Separate electrical service and meter adds cost but pays back in rental flexibility.
A written estimate from us is line-item: foundation, framing, roof, windows, mechanical rough-in, finish, permits, and inspections, each with a number. What it doesn’t include unless we spell it out: landscaping restoration, a new driveway to the unit, and any county fees that change after submittal. No-hassle upfront pricing means the number you see is the number you pay, backed by our 730-Day Done Right Promise.
See the difference
Before
After
Before
After
Before
AfterWhat Sunset Homes Specifically Do to This Job
Sunset is a west-Kendall suburban community in unincorporated Miami-Dade (ZIP 33173), and building an ADU here means building to the strictest wind-load, impact-window, and roof-to-wall tie-down code in the country. Most of the housing stock is 1970s and 1980s single-family tracts with stucco-over-CBS walls and flat or low-pitch tile roofs, and many of those main houses are hitting 40 to 50 years old. That matters for an ADU because the county’s 40-year recertification regime means your existing home’s condition gets looked at during the process, and we’ve seen more than one Sunset project paused because the main roof or tie-downs weren’t up to snuff.
The #1 leak and re-roof driver in these subdivisions is the flat and low-slope tile roof, and stucco cracks along the CBS joints after enough summer sun-and-storm cycling. So when we tie a new detached unit into the main house, the detailing has to be right: secondary water barriers, mold-resistant assemblies, and impact glazing throughout. This is code-driven retrofit territory, not basement waterproofing. It’s a big part of why homeowners who add an ADU often pair this with Concrete Driveways & Concrete Work in Sunset to give the new unit real access, or Paver Driveways in Sunset for a cleaner finish. We cover the whole of Sunset and the surrounding blocks toward Olympia Heights and Westchester.
Serving Sunset, FL – Our Local Coverage Area
We serve Sunset and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – New Detached ADU in Sunset

Most new detached ADU projects in Sunset take 5 to 8 months from signed plan to final inspection, with permits typically eating 6 to 10 weeks of that. Call (888) 418-7102 and we’ll give you a realistic schedule for your lot.
Yes. A detached ADU always needs a building permit through Miami-Dade County, plus separate electrical, plumbing, and mechanical permits. We pull and manage them and get every inspection passed. It’s part of the job, not an add-on.
Usually, yes. Running new service to the unit from the panel or from a separate meter keeps trenching short and avoids opening up your main house. We check the panel capacity and water line on the first site walk so you know before you commit.
The range is $45,000 – $130,000, driven by size, site work, material grade, and permit scope. Call (888) 418-7102 for an exact quote; estimates are free and line-item.
Every ADU we build is covered by our 730-Day Done Right Promise: if it’s not done right, we make it right. That’s on top of manufacturer warranties on windows, roofing, and fixtures.
Get a Free On-Site Estimate for Your Sunset ADU
Adding a new detached ADU in Sunset is a five-figure decision, so start with a free on-site estimate and design consult: (888) 418-7102. On the call we’ll set a time to walk your lot, talk through size and layout, and confirm what the county will require. Calls are answered by a live person, 24/7, and projects over $10,000 qualify for $1,000 off and 0% financing for 18 months. When the scope runs wider, see our Home Additions & ADU in Sunset page or the broader Home Additions & ADU service.
Written by the team at Groundwork Construction Co.