New Detached ADU in Tamiami: What It Costs and How Long It Takes
A new detached ADU in Tamiami typically runs $53,100 to $153,400 for the structure itself, and a full turnkey build with plumbing, electrical, finishes and close-out lands most homeowners between $106,200 and $259,600. Plan on 7 to 11 months from signed contract to certificate of occupancy, with permitting eating 8 to 16 weeks of that in Miami-Dade County. Call (888) 418-7102 and we’ll walk your lot and give you a real number, not a range off a website.
How a Detached ADU Gets Built Here, Stage by Stage

An ADU is a second house on your property, and it gets built like one. Here’s the actual sequence, with what you decide at each stop.
Stage 1: Site walk and feasibility (week 1)
We measure setbacks, locate the septic or sewer lateral, check where the water main and meter sit, and look at how stormwater moves across the lot. You decide the footprint and whether the unit is for a parent, a rental, or a home office. In the low-lying parts of 33184 this is also where we flag whether footings will hit groundwater, which changes the foundation and the budget.
Stage 2: Design and permit (weeks 2 through 16)
Drawings go to Miami-Dade County with product-control (NOA) approvals attached for every window, door and roof fastener. You approve the layout, the exterior finish so it matches the main house, and the rough electrical and plumbing locations. Inspectors here want those NOA numbers on paper, and missing them is the single most common cause of a stalled permit on a Tamiami ADU.
Stage 3: Site prep and foundation (weeks 4 through 8, overlapping permit close-out)
Clearing, grading, and any dewatering happen first. Then footings, stem walls and slab. On Atlantic Coastal Ridge limestone, excavation can turn up rock close to the surface, and a high water table means we may pump before we pour. You don’t decide anything here except the concrete finish if the slab is exposed.
Stage 4: Structure, roof, and rough-in (weeks 8 through 20)
CBS block walls, tie-downs, trusses or a cast roof deck, then the roof covering, then rough plumbing, electrical and HVAC, each with its own inspection. This is the longest stretch and the one most affected by the May-to-November storm season. You sign off on window and door selections before this stage, because lead times on impact units run weeks, not days.
Stage 5: Finishes and close-out (weeks 20 through 40)
Drywall, stucco, paint, flooring, cabinets, fixtures, trim, then final inspections and the certificate of occupancy. You’ll pick finishes early in this stage and then stay out of the way while it comes together. Detached units here need their own address, meter setup and often their own impact-rated entry, so we handle the paperwork side as the build closes.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Shape Your ADU
Most of the money and most of the regret live in these decisions. Here’s what you’re actually picking between.
- Size and layout. A 500-square-foot studio is the cheapest path and suits a rental or a guest suite. A 750- to 900-square-foot one-bedroom costs more but rents for meaningfully more and works for a parent who wants a real kitchen. Two bedrooms push you toward the top of the range.
- Roof. Barrel tile matches the Mediterranean homes common on these blocks and holds up to UV, but it’s heavier and costs more upfront. A shingle roof saves money now and needs attention sooner in this sun. Metal lasts longest and costs the most.
- Windows and doors. Impact-rated units are the default in South Florida and often required for the permit. Cheaper non-impact glass plus shutters saves on the unit price but adds hardware and hassle every storm.
- Wall system. CBS block and stucco is what the neighborhood is built from and what holds up to salt air and humidity. Frame construction is faster and cheaper but needs more weather detailing here.
- Fixtures and finishes. A Moen or Delta faucet package and an American Standard toilet and tub keep the budget sane without looking cheap. Going premium on a Blanco sink or designer tile adds real money for a rental unit that won’t return it.
- Utilities. Tapping the main house’s service is simplest if capacity allows. A separate meter costs more but makes the unit truly independent, which matters if you plan to rent it.
What a New Detached ADU Costs in Tamiami, FL

Expect $53,100 to $153,400 for a detached ADU in Tamiami, with full turnkey projects reaching $106,200 to $259,600 once utilities, finishes and close-out are included. Four things push you toward the high end:
- Square footage and bedroom count. Every added room brings more foundation, more roof, more wire and more fixtures.
- Site conditions. Limestone near the surface, a high water table, or a lot that needs significant grading or fill all add cost before the first block is laid.
- Utility distance. The further the unit sits from the main house’s water, sewer, and panel, the more trenching and the more copper and conduit.
- Finish level and systems. A separate meter, a mini-split versus central HVAC, and tile versus vinyl plank flooring each move the number.
A written estimate from us is line-itemed: excavation, concrete, block, trusses, roofing, windows, rough trades, finishes, permits, and inspections, each with its own number. What typically isn’t included: landscape repair after trenching, furniture, and appliances unless you ask for them. No-hassle upfront pricing means the number you see is the number you pay. Call (888) 418-7102 for a free estimate.
See the difference
Before
After
Before
After
Before
AfterWhat Tamiami Lots and Codes Do to This Build
Tamiami is a Spanish-speaking, largely Cuban-American suburb of west Miami-Dade, and construction here is mostly residential remodeling and new-build infill on lots that were subdivided decades ago. That matters for an ADU: setbacks and lot coverage get tighter than you’d expect, and we coordinate bilingual client communication and county paperwork side by side so nothing gets lost between the two.
The ground is the bigger story. This area sits on the edge of the Everglades’ drained wetlands on Atlantic Coastal Ridge limestone, so a new detached ADU here often hits standing water during the dig and rock close to grade. Dewatering and foundation detailing differ from jobs on higher ground. The housing stock is mostly 1970s-2000s single-story CBS ranch and Mediterranean homes with barrel-tile roofs, plus newer two-story infill, and you’ll see that mix along the blocks off SW 8th Street and the residential streets feeding into the 33184 ZIP. Those older main houses often have limited electrical service, so we check panel capacity early before we plan to feed a second structure. It’s all part of Home Additions & ADU in Tamiami, and if the unit is only one piece of a larger plan, we scope it that way from the start.
Serving Tamiami, FL – Our Local Coverage Area
We serve Tamiami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: New Detached ADU in Tamiami

Seven to eleven months is the honest answer, with 8 to 16 weeks of that being Miami-Dade permitting and the rest construction. Detached units take longer than garage conversions because everything is new: foundation, walls, roof, and separate utilities. Call (888) 418-7102 for a timeline built around your lot.
Yes, every detached ADU needs a full Miami-Dade County building permit and inspections through to a certificate of occupancy. There is no shortcut, and inspectors expect product-control (NOA) approvals on every window and roof fastener. We pull the permits and manage the inspections. Call (888) 418-7102 to talk through your lot.
Sometimes, but not usually without added cost. A fully independent unit with its own meter, water tap, and separate HVAC is possible, and it makes the unit cleaner to rent, but the utility runs and meter setup push the budget higher. Sharing the main service is cheaper if the panel has capacity. We check that first. Call (888) 418-7102 for a straight answer on your property.
Between $53,100 and $153,400 for the structure, or up to $259,600 for a fully equipped turnkey build. The price shouldn’t move once we’ve walked the site and written the estimate unless you change the scope or we hit something underground the walk couldn’t reveal, and we tell you before we spend the money. Call (888) 418-7102 for a free estimate.
Every ADU we build is covered by our 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction, and if it’s not done right, we make it right. Our technicians have up to 12 years of experience, and calls are answered by a live person 24/7. Call (888) 418-7102 to get started.
Ready to Price Your Tamiami ADU?
Call (888) 418-7102 to book a free on-site estimate for your new detached ADU in Tamiami. We walk the lot, check setbacks, utilities and groundwater, and hand you a line-itemed written quote with financing options including 0% for 18 months and $1,000 off projects over $10,000. Considering exterior work while you’re at it? Homeowners often pair this with Paver Driveways in Tamiami or Concrete Driveways & Concrete Work in Tamiami so the new unit and its parking come together. From foundation to finish line, one contractor, backed in writing. See our full Home Additions & ADU service and our Tamiami coverage area.
Written by the team at Groundwork Construction Co.