







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterTub to Shower Conversion Cost in Hialeah, FL: What You’ll Actually Pay
A tub-to-shower conversion in Hialeah typically costs $3,500-$10,000 when the drain line is sound, and $9,000-$28,000 as part of a fuller bathroom remodel where plumbing rough-in gets corrected. Here’s the part that surprises homeowners: demo a tub in a 1965 Hialeah home and there’s a better-than-even chance the drain line behind it is galvanized steel. That changes your number before the tile truck arrives. Call Groundwork Construction Co. of Hialeah at (888) 418-7102 for a free estimate with the plumbing assessed up front, not after demo.

Why Hialeah Conversions Cost More Than the Online Calculators Say
Most tub-to-shower calculators quote you a surface conversion: tear out the tub, set a pan, tile the walls, hang a glass door. That’s real work, and it’s most of the cost. It just isn’t the whole story in Hialeah’s housing stock.
The city is dominated by 1950s-1970s single-story CBS (concrete block and stucco) homes, and a lot of those bathrooms still have their original drain assemblies. Galvanized steel drain lines corrode from the inside out. Cast iron cracks and roots find the joints. When we open a wall to set a new shower pan, we’re connecting new plumbing to a 60-year-old line, and sometimes that line won’t hold. If we don’t check before demo, you find out mid-project, and the price moves. We’d rather tell you on the estimate. Our technicians have up to 12 years of experience reading exactly this kind of warning sign.
There’s a second Hialeah-specific wrinkle: rear additions, converted garages and carports built informally over the decades. A bathroom tucked into one of those spaces sometimes has plumbing that was routed to meet the original house, not the addition. A re-pipe that would be routine in a newer home can turn into a real investigation. That’s why our pricing model puts the plumbing assessment before the number, and why we don’t quote a fixed price we haven’t earned yet.
What each cost tier actually covers
Here’s where the money goes, line by line. Ranges are what we see across Hialeah bathrooms.
| Line item | Price range |
|---|---|
| Tub-to-shower conversion (drain sound) | $3,500-$10,000 |
| Walk-in shower installation | $4,500-$12,000 |
| Shower replacement only | $3,000-$8,500 |
| Full bathroom remodel (conversion included) | $9,000-$28,000 |
| Small bathroom remodel | $5,000-$12,000 |
| Bathroom vanity installation | $800-$3,000 |
The low end of the conversion range is a straightforward swap: pan, tile, waterproofing, fixtures, drain that holds. The high end shows up when the drain line needs replacing, the rough-in has to move to fit a barrier-free entry, or the job grows into a full remodel because the vanity and floor are coming out anyway. That last scenario is common in Hialeah, and it’s often worth doing in one pass instead of two.
The Permit Question Nobody Warns You About
Plumbing alterations in a bathroom remodel require a permit under Miami-Dade County code, and Hialeah follows the same standard. Moving a drain, replacing a drain line, relocating the rough-in for a new shower: each of those is a permitted plumbing change. Many conversions in the city get done without one, and that’s where homeowners get hurt.
- Insurance: if a shower pan or drain fails and causes water damage, an unpermitted plumbing alteration can give your insurer grounds to reduce or deny the claim. You paid for coverage you can’t collect.
- Inspection trail: permitted work is inspected at the rough-in and again at completion. Waterproofing and drain connection get verified by someone with no stake in the job.
- Resale: unpermitted bathroom work surfaces during a buyer’s inspection and can stall a closing.
- Code scope: Miami-Dade’s post-Hurricane Andrew code and the current Florida Building Code apply. Older homes sometimes pick up tie-down or opening requirements during a permitted renovation that an unpermitted job quietly skips.
Pulling the permit protects you, and it’s part of how we work every project. Our Bathroom Remodeling page walks through the full scope beyond a single conversion if you’re weighing how much to take on at once.

How Our Upfront Pricing Handles the Plumbing Surprise
Groundwork gives you a fixed price that accounts for the plumbing assessment before demo begins. Here’s the process:
- Free estimate and design consult. We look at the existing drain, check the wall cavity where the tub meets the floor, and note the home’s age and construction.
- Plumbing scoped in writing. If the drain line is at risk, it’s on the proposal as a line item. If it’s sound, we say so and the price reflects it. You see the number you’ll pay before anyone swings a hammer.
- Financing and promotions applied. 0% financing for 18 months, and $1,000 off projects over $10,000, so a larger conversion with corrected plumbing is manageable instead of a cash hit.
- One price, no mid-project surprises. The number we quote is the number you pay. If something unexpected shows up after demo, we come to you first. We don’t just keep building and send a bigger invoice.
We back the work with our 730-Day Done Right Promise: if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in residential construction, and it covers the two failure points that matter most in a South Florida bathroom, the waterproofing liner and the drain pan.
Designing for a Body That Needs the Shower to Work
Hialeah’s multigenerational households are the norm, not the exception. A single bathroom often has to serve an aging parent who needs a low, no-step entry and a bench to sit on, plus young children who need the same flat floor and a handheld shower they can reach. Those are compatible goals, and they’re a big reason conversions happen here, not just aesthetic upgrades.
When we design the entry and bench, we’re thinking about grab bar blocking inside the walls, a curbless or low-curb pan, niche placement, and a Schluter waterproofing system that handles the year-round humidity. Miami’s wet season tests every seal in a bathroom. A liner installed correctly and a drain pan tied in properly are the difference between a shower that lasts and one that grows mold from behind the tile in three years. We specify components we trust: a Toto or Grohe shower valve, a bench and door that reflect how the household actually moves through the room. That’s the same open book we use across every category in our full-scope construction work.
Questions Homeowners Ask Us Before Booking
How much does a tub-to-shower conversion cost in Hialeah?
A tub-to-shower conversion in Hialeah runs $3,500-$10,000 when the existing drain is sound, and $9,000-$28,000 when the conversion is part of a fuller bathroom remodel that includes plumbing rough-in corrections. The variable that moves the number most is the condition of the drain line behind the tub, which we assess before quoting. Call (888) 418-7102 for a free estimate.
Does my contractor need a permit for a tub-to-shower conversion in Hialeah?
Yes, if the plumbing rough-in is altered or the drain line is replaced, Miami-Dade County requires a plumbing permit for the work. A same-footprint cosmetic swap that leaves the drain untouched sometimes qualifies as a simpler scope, but any change to drain location or line replacement is permitted and inspected. Unpermitted plumbing work can jeopardize your homeowner’s insurance coverage on a water-damage claim, which is the main reason to insist on it.
Is it cheaper to convert a tub to a shower or remodel the whole bathroom?
Converting just the tub is cheaper up front, at $3,500-$10,000 versus $9,000-$28,000 for a full bathroom remodel. But if the vanity, floor and plumbing are already coming out for the conversion, doing the whole bathroom in one pass usually costs less than two separate projects, because demo, permit and finish work happen once. We’ll tell you which one makes sense after we see the room. Call (888) 418-7102 and we’ll walk through both options at no cost.
How long does a tub-to-shower conversion take in Hialeah?
Most tub-to-shower conversions take several days to two weeks of on-site work, depending on whether the drain line is replaced and whether a permit inspection needs to be scheduled. Plumbing rough-in and waterproofing inspection add time if the line has to be corrected. A full bathroom remodel typically runs longer. Because we start with a fixed price and a real schedule, you know the timeline before we break ground.
Tie It to Your Humid-Climate Reality, Then Get the Number
Groundwork Construction Co. of Hialeah is a licensed, insured construction partner. Calls are answered by a live person 24/7, and our background-checked technicians arrive in uniform. We’re not a social-media setup working out of a van.
Get a free project estimate and design consult. Call (888) 418-7102 today, and bring the questions you’ve been holding since demo day.
Written by the team at Groundwork Construction Co. of Hialeah, serving Hialeah, FL.
What Our Customers Say
"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."
- Robert Sullivan"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."
- Marco Castillo"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."
- Angela Wong












