A Groundwork company - serving Hialeah, FL
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Design & Permitting · Hialeah, FL

ADU Design & Permitting in Hialeah - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Hialeah
A garage converted into a guest room and home office
A finished backyard cottage with a small covered porch
An open kitchen and dining area after a remodel
A freestanding soaking tub in a remodeled primary bathroom
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Design & Permitting in Hialeah, FL: What It Takes and What It Costs

ADU design and permitting in Hialeah usually runs $45,000 – $130,000 for design through permit-ready and built-out scope, and the design-and-permit phase alone typically takes 10 – 16 weeks before a shovel hits the ground. That timeline reflects Miami-Dade review cycles plus as-built surveys on older lots. Call (888) 418-7102 to schedule a free on-site estimate and a clear read on what your property will actually require.

Call (888) 418-7102

How the design-and-permit process actually runs

A remodeled family room with new windows and a window seat

Permitting an accessory unit in Hialeah is not a paperwork errand tacked onto construction. On older CBS lots it is the front half of the job, and skipping steps here is how projects stall for months. Here is the sequence we follow.

Stage 1: Site visit and feasibility (week 1)

We walk the property, measure the lot, and check setbacks against the zoning designation. This is where you decide what the unit is for: a rental, a parent’s residence, or workspace. That answer shapes everything downstream.

Stage 2: As-built survey and existing-conditions review (weeks 1 – 3)

Hialeah has a deep inventory of homeowner-built rear rooms, carports, and enclosed garages. Before we can permit a new unit, an as-built survey establishes what legally exists. If an unpermitted structure sits in the build zone, you decide whether to legalize it or remove it. This is the most common delay point, so we front-load it.

Stage 3: Schematic design and engineering (weeks 3 – 7)

Floor plan, elevations, and structural drawings go out, along with a mechanical, electrical, and plumbing layout. Because Miami-Dade operates under post-Andrew hurricane code, the structural package has to show tie-downs, roof-to-wall connections, and impact-rated openings. You sign off on layout and finishes here.

Stage 4: Permit submittal and plan review (weeks 7 – 14)

We file with the city and respond to reviewer comments. Expect at least one round of corrections; a clean first pass is rare on a unit attached to an existing structure. You decide at this stage whether to hold the design or absorb a revision if the reviewer asks for a change.

Stage 5: Permit issuance and construction kickoff (weeks 14 – 16)

Once the permit is in hand, we schedule inspections in step with the build: foundation, framing, rough-in, insulation, and final. Every inspection is built into the schedule, not squeezed in afterward. Throughout, part of a full Home Additions & ADU in Hialeah scope if you’re expanding the main house at the same time.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The options you’ll choose between

Design and permitting decisions come down to a handful of forks. Each has a real cost and a real trade-off.

  • Attached vs. detached siting: An attached unit shares a wall and utility runs, which keeps cost near the low end. A detached unit needs its own foundation, roof, and service connections and pushes toward the high end of the $45,000 – $130,000 range.
  • Impact-rated openings: Required under Miami-Dade code on new construction. Impact glass costs more upfront than shutters but eliminates storm prep and holds up through hurricane season. We typically spec Andersen or Pella units for the durability and clean finish.
  • Wet-bar vs. full kitchen: A full kitchen with a Delta or Moen fixture package adds plumbing and appliance rough-in. A wet bar with a compact sink keeps the number down and suits a rental or studio.
  • Bathroom spec: A standard shower-and-vanity layout is the budget option. A walk-in shower with American Standard fixtures adds cost but ages better for a family member living in the unit long-term.
  • Roof-to-wall tie-downs: On an existing home, retrofitting connections is often required and is not optional if the unit ties into the main structure. Budget for it in the design phase, not after inspection.

What ADU design and permitting costs in Hialeah, FL

A framer checking new wall framing on a home addition

Plan on $45,000 – $130,000 for the design-through-built-out scope on this page, with design and permitting alone usually landing in the $18,000 – $40,000 band depending on engineering complexity and review cycles. Here is a line-item view.

  • As-built survey and site analysis: $1,500 – $4,000
  • Architectural and structural design: $8,000 – $20,000
  • MEP design and engineering: $3,000 – $7,000
  • Permit filing, plan review, and corrections: $4,000 – $10,000
  • Hurricane-code structural detailing and tie-down design: $2,000 – $5,000

What moves you toward the top of that range: unpermitted existing structures that need legalizing, a detached unit requiring a new foundation and service connections, and any relocation of plumbing or electrical to route utilities to the unit. What keeps you near the bottom: an attached siting that reuses existing walls, straightforward setbacks, and a clean as-built survey. Watch for what a written estimate includes versus excludes: soil testing, utility connection fees, and plan-review correction cycles are the usual gaps. We put the number in writing with no change orders, and our upfront pricing means the number you see is the number you pay.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Hialeah homes specifically do to this job

Hialeah is a majority-Cuban city where construction runs on multigenerational, owner-built expansion rather than tract development. Many homes here were enlarged informally by family members over decades, and nearly every project involves Spanish-language communication and Cuban-American supplier networks, so this isn’t a job for crews who’ve never worked Hialeah stock. The city is dominated by 1950s – 1970s single-story CBS homes with flat or low-slope roofs. Those informal rear rooms, carports, and enclosed garages are exactly what an as-built survey has to sort out before a legitimate unit can be permitted. Post-Andrew Miami-Dade code also means impact-rated openings and tie-down retrofits are part of the design, not an upgrade. We work throughout Hialeah and the surrounding neighborhoods, and we know the review realities here well enough to plan around them. Homeowners often pair a unit with a new Paver Driveways in Hialeah layout to handle the extra parking and a Chain Link Fence in Hialeah to define the yard, all handled under one scope.

Serving Hialeah, FL – Our Local Coverage Area

We serve Hialeah and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – ADU design and permitting in Hialeah

A standing-seam metal roof over a covered porch

Free on-site estimate for ADU design and permitting in Hialeah

Call (888) 418-7102 and a live person answers, day or night. We’ll set a free on-site estimate, map your lot against the zoning requirements, and outline the design and permitting path for your Hialeah property. You leave the call with a real number and a real timeline, and a written quote with no change orders. Our technicians have up to 12 years of experience, and every project is covered by the 730-Day Done Right Promise. Project over $10,000? Take $1,000 off, with 0% financing for 18 months available.

Written by the team at Groundwork Construction Co.

Why Hialeah Chooses Groundwork Construction Co. of Hialeah

We set the standard for ADU design & permitting in Hialeah.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Hialeah

Getting your ADU design & permitting project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU design & permitting project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU design & permitting pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Hialeah Customers Say

Trusted by homeowners across Hialeah and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new wood side gate with black hardwareA new concrete driveway with a paver borderA remodeled hall bathroom with patterned floor tile and painted wallsA remodeled kitchen with a waterfall island and wood cabinetsA wood double vanity with two mirrors after a bathroom remodelA new roof with clean valleys and new flashing

More services in Hialeah

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Hialeah

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Hialeah team

A local vetted partner works across Hialeah and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Design & Permitting in Hialeah?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Hialeah.

(888) 418-7102

Request a Free Estimate in Hialeah

Tell us about your ADU design & permitting needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch