Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Hialeah, FL: What the Job Really Costs and How Long It Takes
Cabinets and countertops in Hialeah usually run $14,000 – $45,000 for a full tear-out and replacement, with the typical single-family kitchen landing around $18,000 – $26,000. Cabinet installation alone runs $4,000 – $13,000; countertops run $2,000 – $6,500 depending on material and edge profile. Most jobs are measured in weeks, not days: three to five weeks from demo to final caulk, assuming stock or semi-custom boxes and no structural surprises behind the old wall. Call (888) 418-7102 to schedule a free on-site estimate.
How We Run a Cabinet and Countertop Job, Stage by Stage

Cabinet work punishes anyone who rushes the front end. The measure has to be right, the wall has to be flat, and the order has to be locked before a single box gets unloaded. Here’s the sequence we actually follow.
Stage 1: Measure, template, and lock the order (week one)
We measure every wall, check for out-of-square corners, and note where the old cabinets were shimmed or scribed to hide a bad wall. You decide box style, door style, finish, and whether you’re going stock, semi-custom, or fully custom. This is also when you pick your countertop material, because the slab selection drives the lead time. Stock boxes arrive in roughly one to two weeks; semi-custom typically runs three to five weeks. Nothing gets demoed until the order is confirmed.
Stage 2: Demo and prep (one to two days)
Old cabinets, countertops, and backsplash come out. We shut off and cap the water lines, pull the old electrical, and expose the wall so we can see what’s actually there. In Hialeah’s older CBS homes, this is the moment we find the surprises: a wall that was furred out with scrap, a former carport opening that got closed in without proper framing, or a gas line run in a spot no inspector would approve today. We photograph everything and document it before we touch the wall.
Stage 3: Rough-in and wall correction (two to four days)
If you’re moving the sink, adding a dishwasher, or relocating the range, the plumbing and electrical rough-in happens here, and it gets inspected before anything closes back up. We also flatten and shim the walls, because cabinets installed over a wavy wall telegraph every dip through the doors. This is the stage where a “simple swap” turns into a real job, and where an honest contractor tells you so before the drywall goes back.
Stage 4: Cabinet set and countertop template (two to three days, then a wait)
Base cabinets go in first, leveled and shimmed to the floor, then uppers on cleats. Once the boxes are set and secured, the countertop fabricator comes out to template the actual installed cabinets. That template is not the same as the original measure, and skipping it is how counters end up with gaps at the wall. Fabrication takes roughly one to two weeks for quartz or granite, longer for some edge profiles.
Stage 5: Countertop install, plumbing trim, and punch (two to three days)
The slab goes down, the sink and faucet get set, the dishwasher gets tied in, and we run a final level and alignment check on every door and drawer. You walk the job with us, we fix the punch list on the spot, and the work is covered by the 730-Day Done Right Promise. If this is part of a full Kitchen Remodeling in Hialeah, the same stages fold into the larger schedule instead of running stand-alone.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Make Between, and What Each One Costs You Later
Two homeowners with the same square footage can be $20,000 apart on this job, and it almost always comes down to the specs below.
- Stock vs. semi-custom boxes. Stock is the cheap path and it’s fine for a rental or a flip, but you’re limited to standard widths and you’ll fill the gaps with filler strips. Semi-custom lets you dial widths to the inch and pick the door style, at roughly 25 – 40% more. In a 1950s Hialeah kitchen with a weird 11-foot wall, semi-custom often costs less than forcing stock and paying a carpenter to make it look right.
- Quartz vs. granite vs. laminate. Quartz is the default now, non-porous, no sealing, and it holds up to South Florida humidity without staining. Granite is natural stone, needs periodic sealing, and is more forgiving on heat. Laminate is the budget option and the honest trade-off is that it’s thinner, seams show, and hot pans will mark it. For a family kitchen, quartz usually pays for itself in maintenance you don’t do.
- Door material and finish. Painted MDF doors are the value pick and look clean, but they chip at the edges over time. Solid wood and thermofoil each have their place; thermofoil is moisture-resistant but can peel in a hot kitchen, which matters in a Florida summer. Ask before you order.
- Drawer and door hardware. Soft-close, full-extension undermount slides are worth the upcharge. Cheap side-mount slides are the first thing to fail and the most annoying thing to replace later.
- Sink and layout. A single-basin undermount sink paired with a pull-down faucet is what most buyers pick now, and it’s easier to clean. Moving the sink to a new wall is the single biggest cost driver in this category, because it means new plumbing.
What Cabinets & Countertops Costs in Hialeah, FL

Expect $14,000 – $45,000 for a full kitchen cabinet and countertop replacement in Hialeah. Cabinet installation runs $4,000 – $13,000, countertops $2,000 – $6,500, and a matching backsplash $800 – $2,500. Here’s how each variable moves that number.
- Linear footage and layout. A 10-foot galley is a different job than a 25-foot L with an island. More boxes, more doors, more slab.
- Existing condition. Flat, plumb walls cost nothing extra. A wall that was furred out over block, or a former carport opening closed in without proper framing, adds carpentry before cabinets go in.
- Moving plumbing, electrical, or structure. Relocating the sink, adding a dishwasher circuit, or opening a wall to the dining room adds real money and, in most cases, a permit and inspection.
- Material grade. Laminate counters sit at the bottom of the $2,000 – $6,500 range; quartz with a premium edge profile sits at the top. Semi-custom boxes push the cabinet line toward the high end of its range.
- Permit scope. A like-for-like swap often needs no permit. Anything that touches plumbing, electrical, or a load-bearing wall does, and the inspection has to pass before we close the wall.
A written estimate from us lists the cabinet line, the countertop line, the backsplash, the demolition, the plumbing and electrical rough-in, the permit if one is needed, and the punch. What it does not include, unless we call it out, is appliance cost, any structural repair found behind the wall, and any design change made after the order is locked. Those get priced separately and in writing before we proceed. No-hassle upfront pricing means the number you see is the number you pay for the scope in the estimate.
See the difference
Before
After
Before
After
Before
AfterWhat Hialeah Homes Do to This Job
Hialeah’s housing stock is mostly 1950s – 1970s single-story CBS homes, concrete block with stucco, flat or low-slope roofs, and that fact alone changes how cabinet and countertop work goes here. A lot of these kitchens sit next to a garage that was converted, a rear room that was added, or a carport that got closed in, and not all of it was permitted. When we demo the old cabinets and find a wall that doesn’t line up with the original drawings, we stop and confirm what’s actually there before we frame or hang anything. That’s the same reason a permitted job in Hialeah so often starts with an as-built check rather than a straight install.
The climate does its part too. Year-round humidity and the summer wet season push moisture into any wall that isn’t properly sealed, and we’ve opened cabinets in Hialeah to find mold behind a sink that was backed onto an unventilated addition. We spec moisture-resistant backing and make sure the wall is dry before new boxes go on. If you’re pairing this with a larger build, homeowners often pair this with Garage Conversion ADU in Hialeah work that brings old informal space up to current Miami-Dade code, and the same as-built review applies. We cover all of Hialeah, from Hialeah Gardens to the edge of Miami Lakes, and Spanish-language communication is a normal part of running a job here, not an add-on. If you’re thinking bigger than the kitchen, take a look at New Detached ADU in Hialeah as well.
Serving Hialeah, FL – Our Local Coverage Area
We serve Hialeah and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Cabinets & Countertops in Hialeah

Three to five weeks for a full replacement, with the timeline driven by cabinet and slab lead times, not by installation speed. The install itself is seven to twelve working days; the rest is waiting on stock or custom boxes and on slab fabrication. Call (888) 418-7102 for a realistic date once we’ve measured.
Only when the work touches plumbing, electrical, or structure. A like-for-like swap of cabinets and counters generally does not require one; moving a sink, adding a dishwasher circuit, or opening a wall does, and it has to be inspected before the wall closes. We tell you in writing which side of that line your job falls on.
Yes, and this is the most common way we do it. Keeping the sink and range where they are avoids the plumbing and electrical rough-in, keeps the permit simple, and usually saves several thousand dollars. If you want a new layout, we price the move separately so you can decide with real numbers.
$14,000 – $45,000 for the full job, with cabinets at $4,000 – $13,000 and countertops at $2,000 – $6,500 on their own. The spread comes from linear footage, material grade, existing wall condition, and whether plumbing or electrical moves. Call (888) 418-7102 for an exact quote; estimates are free.
Every cabinet and countertop job we run is covered by the 730-Day Done Right Promise: if it isn’t done right, we make it right for two years. That covers our workmanship, not the manufacturer’s product warranty, and we walk you through both before we start.
Get a Free On-Site Cabinet and Countertop Estimate in Hialeah
We’ll come out, measure your actual kitchen, and tell you what the job costs before you commit to anything. The estimate is free, the pricing is upfront, and there’s $1,000 off projects over $10,000 plus 0% financing for 18 months if you need it. Call Groundwork Construction Co. at (888) 418-7102. A live person answers, 24/7. You can also review our Kitchen Remodeling service and pick your brands from there.
Written by the team at Groundwork Construction Co.