New Detached ADU in Doral, FL: What You’re Actually Building
A new detached ADU in Doral, FL is a fully separate, permitted dwelling built on your lot – its own foundation, walls, roof, kitchen, bath, and utility connections – and most run $45,000 – $130,000 depending on size and finish. Plan on 6 to 10 months from permit to final inspection, with site work eating more of that than framing. For an exact number on your lot in the 33178 ZIP, call Groundwork Construction Co. at (888) 418-7102 and we’ll schedule a free on-site estimate.
How We Build a New Detached ADU Here, Stage by Stage

A detached ADU is a small house. If a builder treats it like a shed with plumbing, you’ll find out at the first inspection. Here’s the real sequence and what you decide at each point.
Stage 1: Site walk and design (2 – 4 weeks)
We start by checking your setbacks, the exact spot for the structure, and what’s underground. In Doral that means locating existing utilities and understanding how the lot drains before a single stake goes in. You’ll decide the footprint and the layout at this stage – one bedroom or two, a full kitchen or a kitchenette. Septic vs. sewer and your electrical service capacity get sorted here too, because a panel that can’t carry another dwelling is a $5,000 – $15,000 surprise if you discover it later.
Stage 2: Permitting (4 – 10 weeks)
We pull the permits. Miami-Dade County runs Doral’s permitting, and under the HVHZ code your plans need wind-load calculations and impact-rated glazing specified up front. This stage is paperwork and plan review, and it’s where an incomplete submittal can sit for weeks. We don’t start framing until the permit is in hand.
Stage 3: Site work, grading, and foundation (2 – 4 weeks)
This is the stage that surprises people in Doral. Clearing, grading, drainage, and the foundation pour come first, and on a flat lot with a high water table that can be the bottleneck – not the framing. We confirm fill and compaction, set the drainage so summer rain moves away from both structures, and pass the foundation inspection before anything stacks up.
Stage 4: Framing, roof, and rough-ins (6 – 10 weeks)
Walls go up, the roof goes on, then plumbing, electrical, and HVAC run inside the walls. You’ll pick fixture locations and confirm the electrical layout before the drywall closes things up. Each rough-in gets inspected before it’s covered.
Stage 5: Finishes, final inspection, and handover (6 – 10 weeks)
Insulation, drywall, paint, flooring, cabinets, countertops, fixtures, and trim. Then the final inspection, a walkthrough with you, and a punch list we clear before we call it done. From there it’s covered by our 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Actually Change Your New Detached ADU
Most of the decisions you’ll make fall into a handful of buckets, and each one has a real trade-off. Here’s how we walk homeowners through them.
- Footprint and bedroom count – A one-bedroom, 500-square-foot unit keeps you near the low end. A two-bedroom near 1,000 square feet pushes toward the top. More rooms mean more foundation, more roof, more finishes, and more permit scope.
- Exterior wall assembly – Stucco over CMU block is the standard here and matches Doral’s existing homes. It handles wind and moisture well, but it’s slower and heavier to build. Wood-frame is cheaper and faster but needs careful detailing to survive hurricane season.
- Impact glazing vs. shutters – HVHZ rules mean every opening needs protection. Impact-rated windows and doors cost more up front but you never deal with shutters again. Shutters meet code for less money but you’ll install and remove them every storm.
- Kitchen and bath fixtures – You’ll pick between brands like Moen, Delta, and American Standard for faucets and fixtures. A full kitchen with a range and full-size fridge costs more than a kitchenette, and it moves the unit into a higher rental bracket if that’s your plan.
- Matching the main house – Roof pitch, trim, and paint that match your existing home cost a bit more than a plain build, but they help with HOA approval and resale.
What a New Detached ADU Costs in Doral, FL

Plan on $45,000 – $130,000 for a new detached ADU in Doral. That spread comes down to five variables: square footage, foundation and site conditions, how far utility runs have to travel, finish grade, and permit scope. A straightforward one-bedroom on a well-drained lot lands at the low end. A two-bedroom with a full kitchen, upgraded finishes, and long utility runs lands at the top.
Here’s what a written, line-item estimate from us covers, so you can compare bids fairly:
- Design and plan prep, and the permit fees themselves
- Site clearing, grading, drainage, and the foundation
- Framing, roof, exterior cladding, and impact-rated openings
- Plumbing, electrical, and HVAC rough-in plus fixtures
- Interior finishes, cabinets, countertops, and paint
- Final inspection and the punch-list walkthrough
What usually sits outside the base number: landscaping and sod replacement, fencing around the new unit, and any utility upgrade if your service panel or meter needs it. We flag those in writing before you sign anything. Upfront pricing means the number you see is the number you pay. Call (888) 418-7102 for an exact quote – estimates are free.
See the difference
Before
After
Before
After
Before
AfterWhat Doral Homes Specifically Do to This Job
Doral is a fast-built, master-planned city, and most of its housing stock went up in the last 25 to 30 years. The single-family homes are mostly 1990s – 2010s Mediterranean stucco builds inside gated communities like Doral Isles and Islands at Doral, with newer townhomes and mid-rise condos clustered around Downtown Doral. That changes how we approach a detached ADU: we’re usually matching an existing stucco-over-CMU home, working inside an HOA’s design rules, and building on infill lots along the NW 25th Street and Doral Boulevard corridors where the remaining parcels are small and tightly bounded.
The climate sets the rules. Doral sits on former wetlands with a high water table and flat, flood-prone terrain. Every permitted structure has to meet Miami-Dade’s HVHZ wind-load and impact-glazing requirements, and summer rain is heavy enough that grading and drainage are often the real bottleneck on a Doral lot. We plan site work around that reality instead of discovering it mid-build. Because a detached ADU is just one piece of a larger property plan for many Doral homeowners, it often works out cheaper to scope it alongside the whole project – take a look at our Home Additions & ADU in Doral page, and homeowners often pair the ADU build with new hardscape, which is why Concrete Driveways & Concrete Work in Doral comes up so often on the same walkthrough.
Serving Doral, FL – Our Local Coverage Area
We serve Doral and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – New Detached ADU in Doral

Expect 6 to 10 months total, from permit to final inspection. Permitting alone runs 4 to 10 weeks, site work and foundation 2 to 4 weeks, framing and rough-ins 6 to 10 weeks, and finishes another 6 to 10. Call (888) 418-7102 for a timeline built around your specific lot.
Yes. Any detached dwelling in Doral requires a full permit through Miami-Dade County, including wind-load engineering and impact-rated openings under HVHZ code. We pull the permits and pass the inspections for you, and we don’t start work until they’re issued.
No – a new detached ADU always involves new plumbing, new electrical, and new structure, because it’s a separate dwelling with its own connections. What we can control is how far those runs travel, since long utility runs are one of the biggest cost drivers on a Doral lot.
Most projects land between $45,000 and $130,000, driven by square footage, site conditions, utility distances, finish grade, and permit scope. Call (888) 418-7102 for a free, line-item estimate so you can see exactly where your number lands.
Every new detached ADU we build is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in the residential construction space, and it’s in writing.
Get a Free On-Site Estimate for Your New Detached ADU in Doral
We’ll walk your lot, check your setbacks and drainage, and give you a written, line-item estimate for your new detached ADU in Doral – no vague ballpark numbers. You’ll know what’s included, what isn’t, and where the money goes. Our technicians have up to 12 years of experience, arrive background-checked and in uniform, and calls are answered by a live person 24/7. Call (888) 418-7102 to schedule your free estimate. We cover Doral and the surrounding communities, and our Home Additions & ADU team handles the full scope from foundation to finish line. Whether your hardscape needs attention too, our Paver Driveways in Doral service can be quoted on the same visit.