A Groundwork company - serving Hialeah, FL
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Sunset, FL

Garage Conversion ADU in Sunset - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Hialeah
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
An open kitchen and dining area after a remodel
A freestanding soaking tub in a remodeled primary bathroom
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Sunset, FL

A garage conversion ADU in Sunset runs $45,000 – $130,000 and usually takes 6 to 10 months from first permit submittal to final inspection, because Miami-Dade’s post-Andrew code review and the county’s recertification culture slow every stage. The build itself is typically 14 to 20 weeks of construction. Call (888) 418-7102 for a free on-site estimate and a written, line-item scope.

Most garages in Sunset’s 1970s and 1980s tracts are attached, block-walled, and already under a low-pitch or flat roof, which makes them genuinely good conversion candidates. They also come with a thicket of code questions that need answering before a single wall goes up.

Key Takeaways

  • A garage conversion ADU is smaller in scope than a Home Additions & ADU in Sunset project and far cheaper than a new detached unit.
  • Budget $45,000 at the low end for a straightforward studio with existing plumbing nearby; $130,000 at the top for a two-bedroom with a new bathroom, kitchenette, and impact glazing throughout.
  • Miami-Dade post-Andrew wind-load, impact-glazing, and tie-down rules drive cost here more than finishes do.
  • Plan on 6 to 10 months door-to-door, with construction itself running 14 to 20 weeks.

How we do this job – the process

Stage 1 – Measure, verify, and pre-check (2 to 3 weeks). We pull your garage’s measurements, check interior headroom against the ceiling joists, and look at the slab. That last one matters: many Sunset garages have a slab that sits 6 to 12 inches below the main house floor, which changes flooring and door decisions upfront. You decide the unit’s use (rental, family, home office) here, because that choice sets the bathroom and kitchenette layout for everything after. Our technicians bring up to 12 years of experience on jobs like this, and we tell you honestly which issues can be handled in the design and which ones you need to know about before you commit.

Stage 2 – Design and permit set (4 to 8 weeks). Drawings move to a licensed designer or engineer, and the set goes to Miami-Dade County for plan review. Because Sunset sits in unincorporated Miami-Dade, the county – not a city building department – reviews your plans. You approve layout, door and window schedule, and whether impact-rated glazing goes in now or later. Waiting on impact windows mid-project costs more, so we make that call early.

Stage 3 – Permit and pre-construction (2 to 4 weeks). Once the permit issues, we schedule inspections and confirm material lead times. You approve final finishes and fixtures now. This is when you sign the fixed-price contract, and the number you see is the number you pay – no change orders once work starts unless you request a scope change in writing.

Stage 4 – Demolition and rough-in (3 to 5 weeks). Old garage doors, tracks, openers, and any storage come out. Framing goes up for new partitions, plumbing runs to the bathroom and kitchenette, electrical runs to code, and the HVAC – usually a mini-split, sometimes a tied-in system – goes in. Rough framing, electrical, plumbing, and mechanical inspections happen in sequence. This is the phase where surprises live: a slab that needs a moisture barrier, a header that needs engineering, or existing wiring that has to be replaced.

Stage 5 – Finish, final inspection, and walkthrough (5 to 8 weeks). Insulation, drywall, tape and mud, texture, paint, flooring, trim, cabinets, countertops, fixtures, and final mechanical and electrical trim-out. The county runs its final inspection, and we walk the unit with you before handover. Everything carries our 730-Day Done Right Promise.

The options you’ll choose between

  • Flooring: Luxury vinyl plank ($3 – $6/sq ft installed) is the practical choice on a garage slab because it handles minor moisture swings; porcelain tile ($6 – $12/sq ft) is cooler underfoot and better if the space will see heavy traffic or rentals; engineered hardwood ($7 – $14/sq ft) feels premium but demands a moisture-tested slab.
  • HVAC: A ductless mini-split ($4,000 – $8,000 installed) avoids tying into the main house system and is easy to zone; running ductwork from the existing system costs less upfront but can strain the main unit and complicate metering if you’re renting.
  • Kitchenette: A simple wet bar with a small sink and under-counter fridge keeps plumbing near existing lines; a full kitchenette with a cooktop, oven, and sink costs $8,000 – $20,000 more and usually means a dedicated 240V circuit.
  • Windows and doors: Impact-rated glazing is not optional in this county. Reusing the existing garage door opening for a frameless glass or slider adds light and looks modern, but a solid or half-glass door with a small window costs considerably less.
  • Exterior finish: Matching stucco over the existing CBS block is the clear choice in Sunset. Sticking with the same stucco texture and paint color keeps the conversion looking like it belongs on the street and avoids HOA friction.
  • Bathroom layout: Staying on the garage’s rear wall close to the main house plumbing wall saves thousands in re-piping; moving the bathroom to the opposite corner is the biggest single cost swing in the job.
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

What Garage Conversion ADU costs in Sunset, FL

The working range for a garage conversion ADU in Sunset is $45,000 to $130,000, drawn from the wider garage conversion band of $30,000 – $80,000 for basic work up through full ADU build scope when the unit gets its own kitchen, bathroom, and separate entrance.

What moves your number:

  • Size and unit count: A studio at 300 – 400 sq ft sits near the low end. A one-bedroom at 450 – 550 sq ft with a full bathroom lands in the $65,000 – $95,000 band. A two-bedroom at 550 – 700 sq ft with a kitchenette pushes toward $110,000 – $130,000.
  • Plumbing distance: A bathroom within a few feet of existing drains is the cheapest path. Relocating drains across a slab adds $5,000 – $15,000.
  • Existing condition: A dry, level slab and sound framing keeps costs down. Slab moisture, termite damage, or an undersized header will add scope.
  • Impact glazing and wind-load detailing: Impact windows and doors in this county add $8,000 – $25,000 over standard glazing, and tie-down upgrades on older framing add more.
  • Kitchenette scope: A wet bar adds maybe $3,000 – $8,000; a full kitchenette with appliances adds $8,000 – $20,000.

A written estimate from us lists line items by trade – demo, framing, electrical, plumbing, mechanical, drywall, flooring, cabinetry, glazing, permits, and inspections – so you can see exactly what’s in and what isn’t. Not included: furniture, appliances beyond the specified package, landscaping around the new entrance, and any change to the main house wiring panel unless noted. Ask us to price impact windows alongside the rest so nothing gets added mid-project.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Sunset homes specifically do to this job

A garage converted into a guest room and home office

Sunset is unincorporated Miami-Dade in ZIP 33173, west of the Palmetto Expressway and south of the Snapper Creek Canal. That means the county, not a city, is your building department – and the county’s post-Andrew building code is the strictest wind-load regime in the country. Every window, every door, and every roof-to-wall connection in your garage conversion has to pass. The 40-year recertification regime also shapes how we approach older properties: many garages we convert here are already on a recertification punch list, and fixing those issues during conversion costs less than fixing them after.

The housing stock drives specifics. These are predominantly 1970s and 1980s single-family tracts and Mediterranean-style villas with stucco over CBS block, flat or low-pitch tile roofs, and original aluminum or jalousie windows. Garages from this era are typically single-car or 1.5-car, 12 to 14 feet wide, with a lower slab than the main house and framing that was never intended to carry a living load. Impact-glazing swaps and tie-down detailing are standard, not optional. Summer humidity also means a proper vapor barrier and mold-resistant assemblies inside the unit, or you’ll be fighting musty air within a year.

If the conversion is part of a full Home Additions & ADU project – a new entrance, a covered walkway, or a separate parking pad – we scope it that way from day one. Homeowners often pair this with Asphalt Driveways & Resurfacing in Sunset when the garage gets converted and a carport no longer fits; others add a new pad with Concrete Driveways & Concrete Work in Sunset for two cars and a golf cart. We cover all of Sunset including the areas near Sunset Drive, Miller Drive, and the neighborhoods off SW 72nd Street.

Serving Sunset, FL – Our Local Coverage Area

We serve Sunset and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – Garage Conversion ADU in Sunset

Get your free garage conversion ADU estimate

A framer checking new wall framing on a home addition

A garage conversion ADU in Sunset is a big commitment, and you deserve a number you can plan around before we start. Call (888) 418-7102 for a free on-site estimate – a live person answers any hour, and we’ll walk the garage, answer questions about permits and impact glazing, and send a written, line-item scope with a fixed price. No cost, no obligation, no surprises.

Written by the team at Groundwork Construction Co.

Why Sunset Chooses Groundwork Construction Co. of Hialeah

We set the standard for garage conversion ADU in Sunset.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Sunset

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Sunset Customers Say

Trusted by homeowners across Sunset and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new casement window over a kitchen sinkA new white vinyl privacy fence with a double gateNew painted shaker cabinets with an organized deep drawerA remodeled hall bathroom with patterned floor tile and painted wallsA remodeled kitchen with a waterfall island and wood cabinetsA wood double vanity with two mirrors after a bathroom remodel

More services in Sunset

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Hialeah

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Hialeah team

A local vetted partner works across Hialeah and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Sunset?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Sunset.

(888) 418-7102

Request a Free Estimate in Sunset

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch