







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterWhat an ADU Really Costs in Hialeah, FL – and the One Line Most Quotes Leave Out
Building an ADU in Hialeah typically runs $45,000 to $130,000 for the full-scope number most homeowners actually sign, with detached new-construction ADUs landing in the $90,000-$220,000 range. That spread isn’t random bidding – it comes down to what’s already on your lot. Call (888) 418-7102 and a live person answers, day or night, to walk you through a real estimate instead of a ballpark someone guessed at.
Here’s the harder question. Most Hialeah homeowners asking “how much does an ADU cost” should ask first: do I know what’s legally on my property right now? Because a large share of local lots carry unpermitted rear rooms, enclosed carports, or converted garages – and those existing conditions have to be sorted out before a legal ADU permit can even be issued.

Why Hialeah ADU Quotes Come In Low – and Then Climb
The generic ADU calculator you found online doesn’t know about your property. In Hialeah, it almost certainly doesn’t account for the as-built survey phase, which is the step that trips up more ADU budgets here than any other. Before Miami-Dade County will approve a new habitable structure on a lot that’s been informally expanded, the property has to be documented as it actually stands. That survey regularly turns up carport enclosures, rear additions, or garage conversions that were never permitted.
And once the county sees them during site plan review, they’re code compliance issues. They have to be remediated or demolished before your ADU permit moves forward. That’s the number missing from nearly every ADU cost guide: $5,000 to $25,000+ in remediation, tacked on before a single block gets laid for the new unit. This is why Hialeah’s market runs on family-built expansion. Generations of owner-built additions mean the paperwork rarely matches the structure – and any contractor who hasn’t priced that in is quoting you a fantasy.
What to look for in any ADU bid, in order:
- A line item for the as-built survey and existing-structure assessment. If it’s not there, the number is incomplete.
- Remediation allowance spelled out. Not “if needed” – a real range for resolving unpermitted conditions.
- Current Miami-Dade wind-load scope. Impact-rated openings, roof-to-wall connections, and the 140-mph design minimum are permit requirements, not upgrades.
- Setback, lot coverage, and FAR calculations done against your actual lot. A typical Hialeah 50×100 lot often yields a smaller buildable footprint than homeowners expect.
When we quote an ADU, all four of those are inside the number. The quote you sign is the quote you pay – half a decade of doing this in South Florida has taught us that mid-project budget expansion is what breaks trust fastest.
The Code Requirements That Shape Your ADU Budget
Every new habitable structure in Hialeah has to meet current Miami-Dade post-Hurricane Andrew standards: impact-rated openings throughout, roof-to-wall straps and connections, and a minimum 140-mph wind design. On older 1950s-1970s CBS homes, that often means structural strengthening of the existing house where the ADU ties in, too. These aren’t areas where a homeowner should be handling the work themselves; structural connections and impact assemblies are where trained, background-checked technicians matter. Our technicians carry up to 12 years of experience on exactly this kind of retrofit work.
For a detached unit, the buildable envelope is the whole ballgame. Setbacks and floor area ratio can shrink a legal footprint well below what the raw lot size suggests, and that changes your per-square-foot cost in a hurry. A unit you can’t permit isn’t a unit – it’s a very expensive shed. This is where an honest contractor earns their keep: doing the math on your lot before anyone draws a floor plan.
Material choices follow the same logic. A properly built Hialeah ADU should hold up to hurricane season the same way the house does, which is why we build with partners like James Hardie for cladding and impact-rated systems throughout.

What an ADU Costs in Hialeah – Line by Line
Here’s how ADU pricing breaks down in this market. These ranges reflect real Hialeah labor and material costs, including permitting, as-built assessment, required structural upgrades, and impact-rated materials.
| Line Item | Typical Range |
|---|---|
| ADU Construction (full-scope) | $90,000-$220,000 |
| Full-scope additions / ADU combined projects | $45,000-$130,000 |
| Garage Conversion | $30,000-$80,000 |
| As-built survey & unpermitted remediation | $5,000-$25,000+ |
| Impact Window Installation | $8,000-$25,000 |
| Home Addition (attached, comparable scope) | $45,000-$130,000 |
A garage conversion is usually the lowest-cost path to a legal second dwelling in Hialeah, because the shell already exists. A detached new build is the most expensive, because everything – foundation to finish – is new. If you’re weighing which route fits your property, our Home Additions & ADU in Hialeah page lays out the design options, and our main Home Additions & ADU service overview covers how we structure a full-scope build.
Making the Budget Work – Financing and Every Quote Inclusive
Multigenerational housing is the reason most Hialeah families build an ADU in the first place, and it’s a decision worth getting the numbers right on. We deliver pricing as a full-scope number that includes permitting fees, the as-built assessment, structural upgrades to the existing structure if required, and all impact-rated materials. No surprise line items later.
Two standing offers help close the gap on timing: 0% financing for 18 months and $1,000 off projects over $10,000. On a $90,000 build, the difference between waiting another year and starting this quarter is usually a monthly payment conversation, not a total-cost one. Your estimate and design consultation are free. Pricing is upfront, the work is backed by our 730-Day Done Right Promise – if it’s not done right, we make it right – and technicians arrive background-checked and in uniform on every job. That’s the standard, not a selling point.
FAQs
An ADU in Hialeah typically costs between $45,000 and $130,000 for a full-scope build, with detached new-construction units running $90,000 to $220,000 and garage conversions landing at $30,000 to $80,000. The biggest variable is what’s already on your lot. If an as-built survey uncovers unpermitted structures, add $5,000 to $25,000+ in remediation before permitting can proceed. Call (888) 418-7102 for an exact number – the estimate is free.
Online calculators don’t know about your property’s unpermitted additions, your lot’s actual buildable footprint, or Miami-Dade’s current 140-mph wind-load requirements. Any quote that ignores the as-built survey phase or the site plan review is incomplete, and the missing remediation and structural costs show up mid-project. Call (888) 418-7102 and we’ll tell you what a realistic number looks like for your specific lot.
A garage conversion is almost always cheaper, because the shell and foundation already exist – $30,000 to $80,000 versus $90,000 to $220,000 for a detached build. The catch is that converting a garage often triggers the same unpermitted-structure review, and the existing garage has to meet current impact and structural standards. Call us at (888) 418-7102 and we’ll assess which route makes sense for your lot.
Yes – resolving unpermitted structures is part of the process, and we price the remediation into your quote upfront instead of surprising you later. Our team documents the existing condition, walks the survey findings with you, and builds the remediation into the full-scope number before you sign. That’s what the 730-Day Done Right Promise is for. Call (888) 418-7102 to schedule your free assessment and design consult.
Start Your ADU With a Real Number
If you’re planning an ADU in Hialeah, don’t sign a bid that skips the survey or waves off the wind-load code. Get a full-scope number that includes permitting, as-built assessment, structural work, and impact materials – then a 730-Day Done Right Promise behind it. Call Groundwork Construction Co. of Hialeah at (888) 418-7102. A live person answers around the clock, and your estimate plus design consult are free.
Written by the team at Groundwork Construction Co. of Hialeah, serving Hialeah, FL.
What Our Customers Say
"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."
- Robert Sullivan"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."
- Marco Castillo"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."
- Angela Wong












