A Groundwork company - serving Hialeah, FL
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Hialeah, FL

New Detached ADU in Hialeah - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Hialeah
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A wood double vanity with two mirrors after a bathroom remodel
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
A new stained cedar privacy fence
A new paver patio with a seat wall and fire pit
A remodeled primary bathroom with a soaking tub and walk-in shower
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Hialeah, FL: What It Takes and What It Costs

A new detached ADU in Hialeah typically runs $45,000 – $130,000 and takes six to nine months from signed plans to final inspection, longer if the lot still carries an unpermitted carport or rear room that has to be resolved first. That price covers a permitted, wind-rated, hurricane-code-compliant unit built behind the main house. Call (888) 418-7102 to schedule a free on-site estimate, and we’ll walk the lot with you and put real numbers on paper.

Call (888) 418-7102

Key takeaways:

  • Most Hialeah detached ADU projects land between $45,000 and $130,000, driven mostly by unit size and whether site utilities have to be re-routed.
  • Miami-Dade’s post-Andrew building code governs everything here: impact-rated openings, roof-to-wall tie-downs, and a product approval number on every assembly we install.
  • Plan on six to nine months total, with roughly 6 – 10 weeks of that in permitting before the first footing is dug.

How a Detached ADU Gets Built in Hialeah, Stage by Stage

A remodeled family room with new windows and a window seat

This is the honest sequence, with what you’ll be deciding and when.

Stage 1: Lot walk and as-built survey (week 1 – 2)

Before plans go anywhere, we walk the property and check what’s actually on the ground against what’s in the public record. In Hialeah that matters more than it does in most cities. Rear rooms, carports, and converted garages get built informally here all the time, and if an unpermitted structure sits in the footprint you have in mind, the ADU can’t be permitted around it. You’ll decide the unit’s approximate size and position here, and whether it’s a one-bedroom or a two-bedroom layout. We’ll coordinate the survey with a licensed surveyor; that’s your first real cost outside the estimate.

Stage 2: Permit submission and review (week 3 – 12)

We submit the drawings, the product approval documentation, and the wind-load calculations to Miami-Dade County. This is the slow part and we won’t pretend otherwise. Reviews come back with corrections, we respond, and eventually the permit gets issued. You’re largely hands-off here, but you’ll sign the application and any revision pages. Expect the 6 – 10 week window, and expect one round of comments almost every time.

Stage 3: Site prep, utilities, and foundation (week 12 – 18)

Once the permit’s in hand, we strip the area, set the elevations, and run the underground: water, sewer or septic tie, and electrical conduit. Then forms, rebar, and the slab or stem wall pour. You’ll decide the utility routing (it’s often the single biggest cost swing on the job) and pick any exterior finishes you want the foundation details to accommodate. This is the stage where flexibility ends.

Stage 4: Shell, roof, and hurricane tie-downs (week 18 – 28)

Concrete block goes up, the roof framing and flat or low-slope roof get installed, and every connection gets strapped and tied per the approved drawings. Windows and doors go in as impact-rated units with the product approval sticker left intact for the inspector. That’s not paperwork theater: an inspector will look for the NOA number and can fail the rough-in without it. You’ll finalize door and window selections from the approved list, and this is where choices like Andersen or Pella impact glazing get locked in.

Stage 5: Systems, finishes, and final inspection (week 28 – 40)

Electrical rough-in, insulation, drywall, then plumbing trim, cabinets, flooring, paint, and HVAC start-up. Rough-in and final inspections bracket these phases. You’ll walk the unit at two points: after rough-in, before walls close, and again at final. Then we hand over the certificate of occupancy and your closeout package with all product approvals and warranty documents inside. Our technicians have up to 12 years of experience, and every stage above is backed by the 730-Day Done Right Promise.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices That Actually Define Your ADU

  • Unit size and layout. A one-bedroom detached ADU in the 500 – 650 sq ft range sits at the low end of the budget; a two-bedroom 800 – 1,000 sq ft unit pushes toward the top. Bigger units mean more foundation, more roof, more of everything.
  • Slab-on-grade vs. raised stem wall. Slab is cheaper and faster. A raised stem wall runs several thousand more but handles drainage better on lots with grading issues, which is common on older Hialeah lots.
  • Impact-rated openings. Required, not optional, under Miami-Dade code. Choose impact glass or shutters with rated panels; impact glass costs more up front and holds value better. The trade-off is real: glass costs more, shutters need to be deployed.
  • Roof type. Low-slope built-up roofs are common and budget-friendly; standing-seam metal runs $15,000 – $40,000 on a main house and scales proportionally on an ADU, but it’s the best long-term answer on a flat-roofed unit under South Florida sun and rain.
  • Exterior finish. Stucco over CBS matches the look of most Hialeah homes. James Hardie fiber cement siding offers a different look and finishes clean, but stucco usually reads better next to a 1950s – 1970s block house.
  • Utility tie-in method. Direct tie to the existing service or a separate meter. Separate metering costs more but simplifies renting the unit later.
  • Interior finishes. KraftMaid cabinetry and Kohler fixtures sit at the quality end. Budget lines work fine in an ADU that will be rented.

What New Detached ADU Costs in Hialeah, FL

A framer checking new wall framing on a home addition

For Hialeah, a permitted detached ADU typically lands between $90,000 and $130,000 for a full two-bedroom shell-and-finish build, and $45,000 and $90,000 for smaller or phased units. Here’s what moves the number:

  • Unit size. Each additional 100 sq ft runs roughly $9,000 – $14,000 when you factor in the extra foundation, roof, and finishes.
  • Existing site condition. Unpermitted structures, poor drainage, or a lot that needs fill push the number up. An as-built survey finding informal construction can add several thousand in site preparation.
  • Utility routing. If the ADU is more than 60 – 80 feet from the main service panel, or if the sewer line needs re-routing, expect $5,000 – $15,000 extra.
  • Material grade. KraftMaid and Kohler-tier finishes push you toward the high end; builder-grade finishes keep you low.
  • Permit scope. A standalone permit is straightforward. If the ADU is part of a broader Home Additions & ADU in Hialeah project, the permitting costs are shared.

A written estimate from us breaks out foundation, framing, roof, windows and doors, electrical, plumbing, HVAC, finishes, and permit fees as separate line items. What it typically excludes: survey costs, impact fee assessments from the county, and any work required to correct unpermitted existing structures found during the as-built.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Hialeah Homes Specifically Do to This New Detached ADU

Hialeah’s housing stock is 1950s – 1970s single-story CBS block with flat or low-slope roofs, and many of these homes were expanded over the decades with informal rear additions, carports, or converted garages. That means almost every ADU project here starts with a survey and permitting reality check, because you can’t permit a detached unit on a lot with unrecorded structures without resolving them first. This is the part that catches homeowners off guard, and it’s the reason a Hialeah ADU is rarely just an ADU: it’s an as-built review, a code-correction scope on the main house, then the new unit. The post-Andrew Miami-Dade code also means tie-down retrofits on the existing structure often come up, since your new detached unit will trigger wind-load and egress reviews that expose older weak points. Working around Cuban-American supplier networks and Spanish-language subs is normal here, and we factor it into scheduling. We cover Hialeah and the neighborhoods around it; homeowners often pair this with Concrete Driveways & Concrete Work in Hialeah because a new unit needs its own parking apron, and Paver Driveways in Hialeah where the ADU entry gets its own walkway. If you’re expanding scope beyond the ADU, our Home Additions & ADU work covers the full build.

Serving Hialeah, FL – Our Local Coverage Area

We serve Hialeah and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – New Detached ADU in Hialeah

A new concrete driveway with a paver border

Free On-Site Estimate for a New Detached ADU in Hialeah

Call (888) 418-7102 and we’ll set a time to walk your lot, look at the existing structures, and give you a written line-item estimate before any work gets discussed. Calls are answered by a live person 24/7, and the estimate is free. Expect real numbers for your specific lot, not a brochure range.

Written by the team at Groundwork Construction Co. of Hialeah.

Why Hialeah Chooses Groundwork Construction Co. of Hialeah

We set the standard for new detached ADU in Hialeah.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Hialeah

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Hialeah Customers Say

Trusted by homeowners across Hialeah and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new curved paver walkway to the front porchA galley kitchen opened up to the dining room with a new peninsulaA walk-in shower with large-format tile and a built-in nicheA standing-seam metal roof over a covered porchA new bay window with a cushioned seatA new wood side gate with black hardware

More services in Hialeah

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Hialeah

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Hialeah team

A local vetted partner works across Hialeah and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Hialeah?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Hialeah.

(888) 418-7102

Request a Free Estimate in Hialeah

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch