Garage Conversion ADU in Hialeah Gardens, FL: What It Takes and What It Costs
A garage conversion ADU in Hialeah Gardens typically runs $45,000 – $130,000 and takes about 4 to 7 months from permit to final inspection, depending on whether you add a bathroom, kitchenette, or move any plumbing. The bulk of that timeline is permits and the wind-hardening work that comes with living in a hurricane zone, not the framing. Call (888) 418-7102 to schedule a free on-site estimate and we’ll tell you what your specific garage will actually need.
How a Garage Conversion ADU Comes Together, Stage by Stage

We’ve learned that a garage conversion in Hialeah Gardens fails or succeeds on the front end, before a single wall goes up. Here’s the real sequence.
Stage 1: Feasibility and survey (week 1 – 2)
We walk the garage with you, measure the slab, check for cracks and moisture, and confirm the ceiling height and door opening. You decide then whether you’re keeping the roll-up door as a facade (common on these infill lots where the front elevation matters) or replacing it with a wall and a window. This is also where we flag if your existing footing or slab drainage is going to need attention before we build on it.
Stage 2: Drawings and permitting (week 3 – 10)
A garage conversion is a change of use, which means it gets reviewed like an addition in Miami-Dade. Plans go to the city for building, and depending on the scope, a separate flood and zoning check. This is the longest stretch, and you’re mostly waiting. You’ll sign off on layouts and material specs during this window so nothing stalls once the permit lands.
Stage 3: Demo and shell work (week 10 – 14)
Out comes the old door hardware, any grease or oil staining, and the interior partition if there is one. We pour or level the slab if needed, frame the new bathroom or kitchenette walls, and rough in plumbing and electrical. All of this gets inspected before insulation goes in.
Stage 4: Rough-in inspections and close-up (week 14 – 17)
Plumbing, electrical, and any mechanical work get inspected together. Once they pass, insulation and drywall go up. You decide on finishes here: flooring, wall texture, trim.
Stage 5: Finishes, final inspection, and punch list (week 17 – 26)
Cabinets, counters, fixtures, paint, flooring, and the exterior door and window install. Final inspection follows. We hand over the punch list and the 730-Day Done Right Promise paperwork. If it’s not done right, we make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Make on a Garage Conversion ADU
These are the decisions that actually change the number, and each has an honest trade-off:
- The garage door: keep, skin, or replace. Keeping the roll-up door and building behind it saves money and reads as a garage from the street, which helps on Hialeah Gardens’ tight infill lots. The trade-off: you lose usable width to the frame and you’ll want a wind-rated, impact-rated door there anyway if the garage faces the street.
- Impact-rated exterior doors and windows. This is not optional in our climate. Impact glass and reinforced frames cost more up front but eliminate the need for shutters and stop the pre-storm scramble. Non-impact with shutters is cheaper to buy and a hassle to live with.
- Bathroom and kitchenette scope. A half bath is the cheapest path. A full bath with a walk-in shower adds real resale value and a real line item. A wet bar versus a full kitchenette is a big swing – you’ll want to know which your lender or the city will allow before you commit. We spec Moen and Delta fixtures on most of these; they hold up and parts are everywhere.
- Flooring. Luxury vinyl plank over the sealed slab is the practical pick for a converted garage because it shrugs off moisture and temperature swings. Tile in the bath. Carpet is the wrong call on a slab that stays cool.
- Wall and ceiling insulation. Foam or batt, but the ceiling matters most. A garage’s low-slope roof turns it into an oven without proper insulation and venting.
What a Garage Conversion ADU Costs in Hialeah Gardens, FL

The working range for this job in Hialeah Gardens is $45,000 – $130,000. Where you land inside that depends on five things:
- Bathroom and kitchenette count. No wet wall lands near the low end. A full bath plus kitchenette pushes toward the middle and up.
- Slab and structural condition. A cracked, settling, or moisture-laden slab has to be addressed before anything goes on top. Older block garages along the residential side streets often need it.
- Moving plumbing, electrical, or structure. Keeping the new plumbing close to the existing stack saves real money. Relocating the panel or cutting new openings adds cost and inspection time.
- Wind rating and impact specs. An impact-rated door, impact windows, and roof-to-wall tie-downs are part of the number, not an add-on.
- Finish grade. Stock cabinets and LVP versus semi-custom and tile is a several-thousand-dollar swing on its own.
A written line-item estimate covers demo, framing, rough-in plumbing and electrical, insulation, drywall, finishes, fixtures, doors and windows, and permit fees. It typically does not cover landscaping, new driveway work if the garage door becomes a wall, or furniture and appliances beyond the fixtures we install. Upfront pricing means the number you see is the number you pay.
See the difference
Before
After
Before
After
Before
AfterWhat Hialeah Gardens Homes Specifically Do to This Job
Hialeah Gardens is a small, densely built city, and nearly all the work here is infill and redevelopment squeezed onto tiny lots, especially along the Okeechobee Road corridor and around NW 103rd Street. That tight quarters affects a garage conversion directly: staging space is limited, and setback and variance questions come up more often than they do on bigger suburban lots. The housing stock is mostly 1970s-1990s concrete block with flat or low-slope roofs, and many of those older block garages sit on shallow footings with minimal lot drainage. Before we build inside one, we check the slab and the grading, because a high water table and intense summer rains will find any weak point. Wind is the other driver – reinforced, impact-rated doors and roof-to-wall tie-downs are how a converted garage holds up through hurricane season. We cover Hialeah Gardens and the surrounding area, so if you’ve been told an out-of-town builder can handle it, get a second look. Homeowners often pair this with Asphalt Driveways & Resurfacing in Hialeah Gardens when the old garage apron is torn up, or with Concrete Driveways & Concrete Work in Hialeah Gardens if they’re replacing the front approach. If your project grows beyond one garage, see our Home Additions & ADU in Hialeah Gardens page for the wider scope, or browse our Home Additions & ADU service for everything we handle. You can also visit our Hialeah Gardens service-area page.
Serving Hialeah Gardens, FL – Our Local Coverage Area
We serve Hialeah Gardens and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Garage Conversion ADU in Hialeah Gardens

Plan on 4 to 7 months door to door, with the permit review in Miami-Dade eating 6 to 8 weeks of that alone. Construction itself is often 12 to 16 weeks once the permit is in hand. Call (888) 418-7102 and we’ll give you a real schedule for your garage.
Yes. Converting a garage to living space is a change of use and requires building permits plus the coastal wind and flood review that comes with it. We pull the permits and handle inspections – you don’t chase the paperwork.
Often yes, and that’s the cheapest path. If you keep the new bath close to the existing stack and leave the structure alone, you land near the low end of the $45,000 – $130,000 range. Moving the panel or cutting new openings adds cost and time.
Most conversions here run $45,000 – $130,000, with a half bath and impact door near the bottom and a full bath, kitchenette, and premium finishes near the top. Call (888) 418-7102 for an exact written quote – estimates are free.
Every garage conversion we build is backed by the 730-Day Done Right Promise: if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in residential construction. Our technicians have up to 12 years of experience.
Get a Free Garage Conversion ADU Estimate in Hialeah Gardens
Call (888) 418-7102 to schedule a free on-site estimate for your garage conversion ADU in Hialeah Gardens. We’ll walk the garage, check the slab and the door, and give you a written line-item quote with the wind and impact work included – no surprises. Calls are answered by a live person 24/7, and estimates are free.