A Groundwork company - serving Hialeah, FL
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Miami Lakes, FL

Garage Conversion ADU in Miami Lakes - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Hialeah
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A standing-seam metal roof over a covered porch
A new bay window with a cushioned seat
A new wood side gate with black hardware
A new concrete driveway with a paver border
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled hall bathroom with subway tile and a floating vanity
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Miami Lakes, FL: What It Takes and What It Costs

A Garage Conversion ADU in Miami Lakes typically runs $35,400 to $94,400 and takes 10 to 16 weeks from permit approval to final inspection. You’re turning an existing attached garage into a self-contained living unit – bedroom or studio, kitchenette, full bath, separate entrance – without adding square footage to the lot. Most Miami Lakes garages are already framed and under roof, which is the whole reason the numbers stay well below a detached build. Call (888) 418-7102 and we’ll walk your garage and give you a written line-item number.

Call (888) 418-7102

How a Garage Conversion ADU Comes Together, Stage by Stage

A garage converted into a guest room and home office

Every conversion follows the same skeleton, but the amount of work inside each stage depends on what your garage is doing right now. Here’s the sequence we run.

Stage 1 – Walkthrough and feasibility (week 1)

We measure the slab, check ceiling height, and find out where the water heater, electrical panel, and any existing plumbing live. You decide the layout: studio or one-bedroom, and where the entry goes. If the garage sits on the property line with no side yard, we flag that early because Miami Lakes PUD setbacks on accessory units are tighter than county code alone.

Stage 2 – Drawings and permit submission (weeks 2 to 5)

We produce the floor plan, electrical and plumbing drawings, and the energy calculations the county wants for a habitable unit. Garage floors are usually sloped for drainage and sit a few inches below the house – we note the finished-floor and ceiling-height strategy on the drawings. Plan review in this part of Miami-Dade typically takes 3 to 5 weeks. You decide finish materials and fixture spec around the same time.

Stage 3 – Demolition and rough-in (weeks 6 to 8)

Out comes the old garage door (often replaced with a framed wall and a code-compliant exterior door so the conversion is reversible), the opener, and any storage built-ins. Then we cut the slab for the bath drain, run supply and waste lines, pull circuits from the main panel for the kitchenette and mini-split, and frame the bathroom walls. Rough electrical, plumbing, and mechanical inspections happen here – usually two to three separate visits.

Stage 4 – Insulation, drywall, and finishes (weeks 9 to 13)

Spray foam or batt insulation goes in, then drywall, tape, and texture. Then the sequence you’d see in any interior remodel: tile in the bath, flooring over the slab, kitchenette cabinets and counter, paint, trim, and the mini-split or ducted unit. You make the finish decisions at this stage if you haven’t already.

Stage 5 – Final inspections and walkthrough (weeks 14 to 16)

Final building, electrical, plumbing, and mechanical inspections, then a certificate of occupancy. We walk the unit with you and hand over the written 730-Day Done Right Promise on the workmanship – one of the longest guarantees in residential construction. Anything off on that walkthrough gets fixed before we call it closed.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices That Shape Your Garage Conversion ADU

The bones are mostly fixed. The variables are the systems and finishes, and they’re where a job lands low or high in the $35,400 to $94,400 range.

  • Exterior door over the old garage opening – A framed wall with a standard insulated door and a small window is the practical choice; a true sectional door left in place means you keep vehicle access but lose wall area for the bath and kitchenette.
  • Bathroom rough-in location – Tucking the bath against the wall nearest the house’s existing drain stack is the cheapest route. Hacking a new trench across the slab to a distant stack adds real money and days.
  • Cooling – A ductless mini-split lets you zone the unit separately from the house, which matters if you’ll rent it. Ducting back to the main system costs less up front but ties the tenant’s comfort to your thermostat.
  • Kitchenette versus shared kitchen – A compact kitchenette with a sink, two-burner cooktop, and under-counter fridge in a Milwaukee-style cabinet line keeps the unit self-contained. Full appliance packages and islands push you toward the high end.
  • Flooring over the slab – Luxury vinyl plank handles the temperature swings and moisture a garage slab sees better than hardwood; tile in the bath is standard.
  • Impact-rated openings – Anything you add glazed has to meet Miami-Dade wind-load requirements. Fixed with impact glass, it’s a line item; skip it and the inspection fails.

What a Garage Conversion ADU Costs in Miami Lakes, FL

A framer checking new wall framing on a home addition

Plan on $35,400 to $94,400 for the conversion, with the typical job landing near the middle once a real bathroom and kitchenette are included. Five things move the number:

  • Unit size and layout – A studio tucked into a single-car garage is one number; a one-bedroom in a two-car garage with a full bath and kitchenette is another.
  • Slab and structure – Post-tension slabs, a low ceiling, or a garage sharing a wall with a lakefront enclosure all add engineering.
  • Distance to plumbing and electrical – Which wall the drain stack and panel sit on drives trench and conduit costs more than finish choices do.
  • Finish grade – Cabinet line, counter material, tile, and fixture tier are yours to pick, and they can swing the same job by tens of thousands.
  • Permit and design-review scope – County review plus Miami Lakes PUD design-review approval means drawings that satisfy two sets of eyes, not one.

A written estimate from us spells out labor, materials, permit fees, and design-review costs line by line, so you can see exactly what’s inside the range. It typically excludes furniture, appliances you’re buying yourself, and any landscape repair around the new entry. Call (888) 418-7102 for an exact quote – estimates are free.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Miami Lakes Homes Specifically Do to This Job

Miami Lakes isn’t a normal county permitting job, and that starts before we draw a line. The town is a master-planned development the Graham Companies built around a chain of man-made lakes in the 1960s, so almost every project here touches the town’s own engineering and design review – not just the county. The older sections and The Preserve carry 1960s-70s single-family and split-level homes, plenty still on original cypress or CBS construction, many already re-roofed or re-piped once. Those 60-year-old slabs and ceiling heights are the specifics we design around: a garage with a low mid-century ceiling needs a plan for headroom before it needs a paint color. Every project also has to clear the town’s strict HOA and Planned Unit Development design guidelines for setbacks, exterior colors, fences, and added square footage – approvals a crew working in neighboring Hialeah never deals with. If your new ADU entry, side yard, or driveway change is part of the plan, the town and lakefront rules come first, and homeowners often pair this with Asphalt Driveways & Resurfacing in Miami Lakes or Concrete Driveways & Concrete Work in Miami Lakes once the design review is in hand.

Serving Miami Lakes, FL – Our Local Coverage Area

We serve Miami Lakes and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Garage Conversion ADU in Miami Lakes

A galley kitchen opened up to the dining room with a new peninsula

Get a Free Estimate on Your Garage Conversion ADU in Miami Lakes

We give you a free on-site estimate and design consult for a Garage Conversion ADU in Miami Lakes – we measure the garage, check the panel and drain stack, talk through layout, and hand you a written line-item quote. If the job is part of a full Home Additions & ADU in Miami Lakes plan, we can scope that together, the same way we handle every Home Additions & ADU project. We cover Miami Lakes and the surrounding area, and calls are answered by a live person 24/7. Call (888) 418-7102.

Written by the team at Groundwork Construction Co.

Why Miami Lakes Chooses Groundwork Construction Co. of Hialeah

We set the standard for garage conversion ADU in Miami Lakes.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Miami Lakes

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Miami Lakes Customers Say

Trusted by homeowners across Miami Lakes and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A walk-in shower with large-format tile and a built-in nicheNew architectural shingles with a clean valleyA new casement window over a kitchen sinkA new white vinyl privacy fence with a double gateNew painted shaker cabinets with an organized deep drawerA remodeled hall bathroom with patterned floor tile and painted walls

More services in Miami Lakes

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Hialeah

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Hialeah team

A local vetted partner works across Hialeah and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Miami Lakes?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Miami Lakes.

(888) 418-7102

Request a Free Estimate in Miami Lakes

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch