Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Garage Conversion ADU in Country Club, FL: What It Takes and What It Costs
A garage conversion ADU in Country Club, FL typically runs $45,000 – $130,000 and takes 10 to 16 weeks from permit to final inspection. The job turns your existing attached garage into a permitted living space: new flooring over the slab, framed partition walls, a full bathroom, a kitchenette, dedicated electrical, and impact-rated glazing to satisfy Miami-Dade product approval. Call (888) 418-7102 for a free on-site estimate and a written line-item quote.
How a garage conversion actually unfolds in Country Club, step by step

Converting a garage is a sequence, not a single build. Each stage has a decision attached to it, and knowing what you’ll be asked to choose and when keeps the project moving.
Stage 1: Site review and measurements (day 1 to 3). We walk the garage with you, note the slab condition, ceiling height, and where the electrical panel sits, and confirm whether the existing door opening stays as a wall or becomes a window wall. You decide the footprint and whether the conversion is a studio layout or a one-bedroom. This usually takes one visit and a follow-up call.
Stage 2: Design and permit submission (weeks 1 to 4). We draft the plan set and submit to Miami-Dade County for building, electrical, plumbing, and mechanical permits. Because Country Club sits inside the county’s high-velocity wind zone, the plan set must show wind-load connections and product-approval documentation for windows and doors. You choose finishes early here, because selections affect the drawings. This is the longest quiet stretch, and it’s where impatient projects get into trouble.
Stage 3: Demo and rough-in (weeks 5 to 8). The garage door comes out or gets framed in, the slab is prepped for a moisture barrier and flooring, partition walls go up, and plumbing and electrical are roughed in. You’ll walk the rough layout with us before walls close. A typical bathroom rough-in takes three to four days; the electrical rough-in adds another three to five.
Stage 4: Insulation, drywall, and inspections (weeks 8 to 12). Framing, electrical, plumbing, and mechanical inspections happen in sequence before drywall. Then insulation, drywall, tape, and texture. If you’re converting an older garage with an original 1970s or ’80s slab, this is where we often discover a moisture issue and add a vapor barrier before closing.
Stage 5: Finishes and final sign-off (weeks 12 to 16). Flooring, cabinetry, fixtures, paint, and the final inspection. You’ll choose your fixtures at the start of this stage if you haven’t already. Most projects finish in this window; a heavy plumbing relocation can push the high end.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices you’ll actually make on a Country Club garage conversion ADU
Every conversion is a stack of small decisions. Here’s where the real trade-offs live, and what each one does to your budget and long-term upkeep.
- Flooring over the slab: Luxury vinyl plank is the common choice, running roughly $3 – $6 per square foot installed and handling the humidity well. Porcelain tile costs more up front ($6 – $12/sq ft installed) but survives water events better. Carpet is cheapest and the first thing to fail in a damp garage.
- Bathroom fixtures: A Delta or Moen shower valve and trim runs mid-range and holds up; American Standard toilets are the reliable workhorse. This is a place to spend modestly rather than cheap out, because a failed valve behind a tiled wall is an expensive fix.
- Kitchenette versus full kitchen: A sink, compact fridge, and two-burner cooktop fits most conversions. A Blanco sink and a simple cabinet run is a reasonable middle path. A full range and dishwasher require more electrical and sometimes a vent, which pushes the budget.
- Window and door assembly: An impact-rated fixed window in the old garage opening costs more than a standard one but satisfies Miami-Dade product approval in a single step. Cheaper assemblies often require additional shutters or reinforcement, and county reviewers will flag it.
- Electrical service: If your panel has spare capacity, the conversion can tie in without a service upgrade. A full panel replacement or subpanel addition typically adds $2,000 – $5,000 and adds a week to the schedule.
- HVAC: Extending the existing system works if the house system has headroom. A dedicated mini-split costs more but gives the ADU its own thermostat, which many homeowners prefer for a rental or family suite.
None of these decisions are irreversible after framing, so the goal is to lock them in early and then let the crew work.
What a garage conversion ADU costs in Country Club, FL

Plan on $45,000 – $130,000 for a permitted garage conversion ADU in Country Club. The low end reflects a one-room studio with modest finishes and no plumbing relocation. The high end reflects a one-bedroom unit with a kitchenette, a full bathroom, a panel upgrade, and impact glazing throughout.
Five variables push the number:
- Square footage and layout. A single-car garage conversion is a different project than a two-car conversion into a one-bedroom. Each additional plumbing fixture and wall adds labor and inspection time.
- Existing slab and framing condition. A 1970s or ’80s garage with a cracked or damp slab needs a moisture barrier and possibly a topping pour, which can add $2,000 – $6,000.
- Plumbing and electrical relocation. Moving a drain line or upgrading the panel is where budgets climb fastest. We’ll tell you up front whether the existing service can carry the load.
- Impact glazing and wind-load compliance. Country Club sits in a high-velocity wind zone, so windows and doors must carry Miami-Dade product approval. This adds cost but is not optional.
- Permit scope. A conversion with a new bathroom, kitchenette, and dedicated HVAC needs more permits and more inspections than a simple studio. The county fee and review timeline are folded into the quote.
A written estimate from us breaks out demolition, framing, electrical, plumbing, HVAC, flooring, fixtures, permit fees, and inspections line by line, so you can see what you’re paying for. Items that typically fall outside a standard quote: landscaping repair after the work, furniture, appliances you buy separately, and any structural repair discovered behind wallboard. We flag those before they happen, not after.
See the difference
Before
After
Before
After
Before
AfterHow Country Club homes shape the work
Country Club is a built-out Miami-Dade planned community, and almost every project here is a rebuild, remodel, or addition on a 1970s – 1990s CBS block and stucco home with a tile roof. That matters for a garage conversion in specific ways. The original garages are narrow, often 20 by 20 feet, and the slabs were poured to a lower standard than today’s residential code requires. When we open up a garage floor, we routinely find a thin, cracked slab with no vapor barrier, which means a moisture remediation before flooring goes down. The homes were also wired in an era when a garage needed one circuit; a modern ADU needs dedicated circuits for the bathroom, kitchenette, and HVAC, so a panel review is the first call we make. Roof-to-wall tie-downs and impact-rated glazing are not optional in this county, and product approval is stricter here than in Broward or Palm Beach. If your conversion is part of a full Home Additions & ADU in Country Club project, the garage work often pairs naturally with the broader scope. Call (888) 418-7102 and we’ll walk your specific property before we quote.
Serving Country Club, FL – Our Local Coverage Area
We serve Country Club and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked about a garage conversion ADU in Country Club

Ten to 16 weeks from permit to final inspection, with four to six of those weeks spent on design and county review. Call (888) 418-7102 for a schedule estimate specific to your garage.
Yes. Miami-Dade County requires building, electrical, plumbing, and mechanical permits for any garage conversion, and the final inspection must pass before the space is legally habitable. We pull the permits and manage the inspections; you don’t handle the paperwork.
Often yes, especially if the garage sits adjacent to an existing bathroom wall where a drain can be tied in with a short run. If the layout requires moving a drain or adding a load-bearing header, the project grows in cost and timeline. We assess this on the first visit.
Between $45,000 and $130,000 depending on size, finishes, and how much plumbing, electrical, and structural work is needed. Call (888) 418-7102 for an exact quote; estimates are free.
Every garage conversion we build carries the 730-Day Done Right Promise. If something we installed fails within that window, we come back and make it right, at no cost to you. That applies to workmanship and the systems we install.
Get a free estimate for your Country Club garage conversion ADU
Call (888) 418-7102 and we’ll schedule a free on-site estimate at your Country Club property. A live person answers, day or night, and you’ll get a written line-item quote with the permit scope and timeline spelled out. No pressure to sign anything on the first visit. If the same project touches your driveway access, homeowners often pair this with Concrete Driveways & Concrete Work in Country Club or Asphalt Driveways & Resurfacing in Country Club. You can also see the full range of what we do through our Home Additions & ADU service and across Country Club.
Written by the team at Groundwork Construction Co.