A Groundwork company - serving Hialeah, FL
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Country Club, FL

New Detached ADU in Country Club - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Hialeah
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
A standing-seam metal roof over a covered porch
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Country Club, FL: What It Takes and What It Costs

A new detached ADU in Country Club, FL is a standalone second home on your lot – usually 600 to 1,200 square feet with its own entrance, kitchen, bath and utility meter – and it typically takes 6 to 10 months from permit submittal to final inspection. Budget $90,000 to $220,000 for the build. If you’re folding the ADU into a larger property upgrade, the all-in range lands between $45,000 and $130,000 on the addition side and up to $220,000 once you add full ADU scope. Call (888) 418-7102 to set a free on-site estimate.

Call (888) 418-7102

Country Club is a built-out Miami-Dade planned community, which changes the whole job. Almost nothing here is ground-up greenfield work – it’s fitting a new structure onto a lot that already has a house, a driveway, mature trees and a 1970s-to-1990s CBS block home sitting on it. That constraint drives the design, the permitting path and the price more than anything else.

How We Build a New Detached ADU in Country Club, Stage by Stage

A garage converted into a guest room and home office

Here’s the real sequence, with the decisions that land on your plate at each step.

Stage 1: Site walk and feasibility (week 1)

We measure the lot, check setbacks against your zoning designation, locate the existing utility laterals and confirm where the ADU footprint can legally sit. You decide the rough size and how you want to use the space – rental, family, home office – because that drives everything downstream. This is where we catch the deal-breakers before money gets spent: a lot too narrow for the side-yard setback, a sewer line that runs exactly where the slab needs to go, a tree that eats the buildable envelope.

Stage 2: Design, engineering and permit submittal (weeks 2 – 6)

Working drawings, structural calculations for Miami-Dade wind loads, and a product-approval package for every window, door and roofing component go to the county. You sign off on the floor plan and exterior finish schedule. Expect 4 to 8 weeks for plan review in Miami-Dade – longer if the submittal comes back with comments. You decide finish grade here, because it’s baked into the permit drawings.

Stage 3: Site prep, foundation and utilities (weeks 7 – 12)

We clear the footprint, dig and pour the slab or stem-wall foundation, then run water, sewer or septic, electrical and any gas to the structure. Inspections happen in sequence: underground plumbing, then slab, then rough framing. You don’t make many decisions in this stretch, but this is where schedule surprises live – an undersized existing electrical service or a lateral that needs rerouting adds days, not months, if it’s caught early.

Stage 4: Framing, roof, windows and exterior (weeks 13 – 22)

Walls go up, the roof gets framed and dried in, impact glazing goes in, and the exterior gets stucco and paint to match the main house. Roof-to-wall tie-downs and the impact product approvals get inspected here – this is the part of the job Miami-Dade is strictest about. You’ll pick paint color and stucco finish by roughly week 15.

Stage 5: Interior rough-in, finishes and final inspection (weeks 23 – 34)

Electrical, plumbing and HVAC rough-ins get inspected, then insulation, drywall, cabinets, tile, fixtures and trim. Final inspection and certificate of occupancy close it out. This is the slowest stretch and the one where material lead times bite hardest – order cabinetry and fixtures at stage 2, not stage 4.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Make on a New Detached ADU

Most of the cost swing in a Country Club ADU comes from five decisions. Here’s the honest trade-off on each.

  • Size and layout. A 600 sq ft studio is the cheapest to build and easiest to permit. A 1,000+ sq ft two-bedroom costs meaningfully more but rents for far more and works better for family. The middle ground – a one-bedroom at roughly 750 sq ft – is the most common choice we see.
  • Roofing. Tile matches the west Miami-Dade look and holds up to sun and rain, but it’s heavier and pricier. Standing-seam metal costs more up front and lasts longer. Either way the assembly must carry Miami-Dade product approval.
  • Windows and doors. Impact-rated glazing is effectively mandatory here given wind-load and product-control rules. You choose between impact glass and impact-rated units with added security laminates; both pass, one adds cost.
  • Kitchen and bath fixtures. Moen and Delta faucets and an American Standard toilet or tub are reliable mid-grade picks that hold up to rental use. Going premium on a Blanco sink or specialty fixtures is fine if the ADU is for family, less so for a rental you’ll turn over.
  • Utilities. A separate meter makes the ADU a true standalone unit and simplifies renting, but adds cost. Sharing the main house’s service is cheaper up front and messier down the line.

What a New Detached ADU Costs in Country Club, FL

A framer checking new wall framing on a home addition

Plan on $90,000 to $220,000 for a new detached ADU in Country Club. That range is wide because five variables push it hard in one direction or the other.

  • Square footage. Roughly $130 to $200 per square foot is a fair working number, so a 600 sq ft unit sits near the bottom of the range and a 1,200 sq ft unit near the top.
  • Existing site conditions. A clean, flat lot with room for the footprint is the low end. A tight lot, a sewer lateral to reroute, or an electrical service upgrade pushes toward the high end.
  • Finish grade. Builder-grade materials throughout versus tile, upgraded cabinetry and premium fixtures can swing $25,000 or more.
  • Utility strategy. Separate meters and a full second HVAC system add cost; a shared-service approach trims it.
  • Permit and inspection scope. Miami-Dade’s product-approval requirements are stricter than neighboring counties, and any design changes mid-review add time and fees.

A written estimate from us is line-itemed: foundation, framing, roofing, glazing, mechanical, electrical, plumbing, finishes, permits and inspections each get their own number. What’s typically outside the estimate: landscaping and sod repair after the build, furniture and appliances beyond the spec, and any change orders you request after framing starts.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Why Country Club Lots Make This Job Different

Country Club is built out. There’s no open land here – every new detached ADU is squeezed onto a lot that already holds a 1970s-to-1990s CBS block home with a tile roof now well past its service life. That fact alone reshapes the project: the footprint has to respect setbacks on a lot that wasn’t designed for a second structure, and we’re frequently running new utilities past aging original plumbing and electrical that may need upgrading to current code before the ADU can tie in.

The climate does the rest. South Florida’s sun and rainy-season downpours mean the ADU needs proper moisture management, and hurricane risk means wind-load engineering and impact glazing aren’t optional. Miami-Dade’s product-control approval for roofing and glazing is tougher than in Broward or Palm Beach, so every component gets vetted before it goes on the truck. If the ADU work is part of a full Home Additions & ADU in Country Club plan for the main house, we sequence both under one permit set. Homeowners often pair this with a Concrete Driveways & Concrete Work in Country Club job to give the ADU its own parking pad, or a Paver Driveways in Country Club project to tie the new unit visually into the existing yard. You can see our wider Home Additions & ADU work, and the full range of what we cover across Country Club, on those pages.

Serving Country Club, FL – Our Local Coverage Area

We serve Country Club and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – New Detached ADU in Country Club

A new wood side gate with black hardware

Get a Free On-Site Estimate for Your Country Club ADU

Call (888) 418-7102 to schedule a free on-site estimate for a new detached ADU in Country Club. On the call we’ll ask about your lot, your intended use and rough size, then set a time to walk the property. At the walk you get setback and utility reality, a realistic timeline, and a written line-item quote before any work starts. No-hassle upfront pricing – the number you see is the number you pay.

Written by the team at Groundwork Construction Co.

Why Country Club Chooses Groundwork Construction Co. of Hialeah

We set the standard for new detached ADU in Country Club.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Country Club

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Country Club Customers Say

Trusted by homeowners across Country Club and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A remodeled primary bathroom with a soaking tub and walk-in showerA new clay tile roofNew double-hung windows in a dining roomA new front yard fence with a matching gateA new paver pool deckAn open kitchen and dining area after a remodel

More services in Country Club

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Hialeah

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Hialeah team

A local vetted partner works across Hialeah and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Country Club?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Country Club.

(888) 418-7102

Request a Free Estimate in Country Club

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch