A Groundwork company - serving Hialeah, FL
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Miami Lakes, FL

New Detached ADU in Miami Lakes - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Hialeah
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
New architectural shingles with a clean valley
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Miami Lakes, FL: What It Costs and How Long It Takes

A new detached ADU in Miami Lakes typically runs $106,200 to $259,600, and the full arc from design sign-off to final inspection usually takes 7 to 12 months. Most of that isn’t hammering nails: it’s town and county review, lakefront and HOA design approval, and utility tie-ins. If you’re thinking about one of these on your lot, call Groundwork Construction Co. at (888) 418-7102 for a free estimate and design consult, and we’ll walk your property and tell you what your lot can actually carry before you spend a dollar on plans.

Call (888) 418-7102

Behind every Miami Lakes New Detached ADU is a process most homeowners underestimate

A garage converted into a guest room and home office

Here’s the honest sequence. Most contractors gloss over it; we don’t, because the approvals are where detached ADU projects in Miami Lakes stall.

  1. 1
    Stage 1 – Feasibility and design (4 – 8 weeks). We measure your lot, confirm setbacks and impervious-surface limits under the town’s PUD guidelines, and check whether the site can carry the footprint and connect to water, sewer and power. You decide the size, the roof plan (one story vs. two-story with the same footprint), and whether the unit will ever be used for rental. Structural drawings get stamped here, in this stage, not later.
  2. 2
    Stage 2 – Permitting and design review (8 – 16 weeks). This is where detached ADUs differ most from interior work. Plans go through Miami-Dade County building review for structure, wind load and life safety, and separately through the town’s review and any HOA/lakefront architectural approval. You’ll sign off on the final plan set and any color, roof or fence elevations the town requires. We don’t start digging until every approval is in hand.
  3. 3
    Stage 3 – Site prep and foundation (3 – 5 weeks). Utility locates first, then grading, footings, and slab or stem-wall foundation. High groundwater in Miami Lakes means we plan for drainage and elevation before the first pour. You decide where your future patio or walkway goes now, so it’s coordinated with this phase.
  4. 4
    Stage 4 – Shell, systems and rough-in (10 – 14 weeks). Walls, roof framing, windows and doors (impact-rated openings), then plumbing and electrical rough-in, HVAC and insulation. County rough-in inspections happen at defined points, and we schedule them in advance so the crew isn’t sitting idle waiting for a sign-off.
  5. 5
    Stage 5 – Finishes and final inspection (5 – 8 weeks). Drywall, flooring, cabinets, fixtures and paint, then the county’s final inspection and certificate of occupancy. You make the last long-lead selections (vanity, lighting, appliances) back in Stage 1 so they’re on site when the crew needs them.

Our technicians have up to 12 years of experience on this kind of work, our team is background-checked and uniformed, and every job is backed by our 730-Day Done Right Promise. If it’s not done right, we make it right.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The choices that actually make a detached ADU fit in Miami Lakes

Most of your decisions cluster into five areas. Each has a real trade-off, so here’s the honest version:

  • Footprint and stories. A single-story build is simpler and often cheaper to build, but eats more yard. A two-story with a compact footprint keeps your usable lot but costs more per square foot in structure. In Miami Lakes, where PUD setback rules are strict, a two-story can be the only way to get the square footage you want.
  • Roof and structure. Truss-and-shingle runs lower; concrete tile or a standing-seam metal roof on a two-story holds up better to hurricane-season wind load and matches the neighboring homes in Miami Lakes. Impact-rated windows and doors are a given here, not an upgrade, so the real decision is the brand and the look. We work with Andersen and Pella, among others.
  • Kitchen and bath finishes. A modest ADU kitchen works fine with grade-appropriate cabinetry and quartz counters. If this unit will rent, durability beats fashion: hard finishes, easy-clean surfaces. If it will house a parent, comfort and accessibility details (a curbless shower, grab-bar-ready walls) matter more. Moen and Delta fixtures hold up well long-term, and American Standard is a solid, serviceable choice.
  • Utilities and systems. You decide whether the ADU gets its own meter or taps into the main house, whether the HVAC is a mini-split or a full system, and whether the unit gets a solar-ready panel. Each choice affects both cost and future upkeep.
  • Exterior and integration. Walkways, landscaping, fences and whether the ADU gets its own parking pad all come up here. Homeowners often pair this with Concrete Driveways & Concrete Work in Miami Lakes to give the unit a clean, separate approach. Some of our Miami Lakes clients also roll in Paver Driveways in Miami Lakes at the same time so the new ADU approach matches the main house, which saves mobilizing a crew twice.

Our home additions side of the house (Home Additions & ADU) has a curated set of material partners, so you’re choosing between real quality options, not whatever happens to be on a shelf.

What New Detached ADU costs in Miami Lakes, FL

A framer checking new wall framing on a home addition

Detached ADU construction in Miami Lakes runs $106,200 to $259,600, including design, permitting, site work and finishes. Where you land in that range is driven by a handful of variables:

  • Size and configuration: a small one-bedroom unit sits at the low end; a two-bedroom, two-story build pushes the high end.
  • Existing site condition: a flat, clean lot is straightforward. A lot that needs drainage corrections, fill, or utility re-routes adds cost and time.
  • Utility distance: the further your ADU sits from the main water, sewer and electrical connection, the more trenching and materials.
  • Permit scope: town design review and lakefront or HOA approval can add review cycles and fees we build into the estimate.
  • Finish grade: entry-level cabinets and quartz versus custom millwork and stone can swing the interior budget meaningfully.

We give you a written, line-item estimate with upfront pricing so the number you see is the number you pay. All projects over $10,000 get $1,000 off, and we offer 0% financing for 18 months, which makes the build more manageable. Call (888) 418-7102 for an exact quote on your lot.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Miami Lakes specifically puts in front of a detached ADU

Miami Lakes is a master-planned, 1960s-era town built around a chain of man-made lakes, which changes the permitting math. A detached ADU near the water isn’t just a county building submittal: the town’s own engineering review kicks in for anything touching lakefront setback lines, drainage or impervious-surface limits, and lake-side work can require DERM or water-management sign-off too. On top of that, most Miami Lakes detached ADUs need HOA and PUD design approval for exterior color, roof type, fence style and square footage. A contractor who treats this like Hialeah or Doral and files only a county permit will get plans sent back before a shovel hits the ground. The older sections of The Preserve and elsewhere sit on original CBS construction and low-lying terrain with high groundwater, so foundation, drainage and elevation planning aren’t optional. Call (888) 418-7102 and we’ll walk your lot with all of this in mind.

Serving Miami Lakes, FL – Our Local Coverage Area

We serve Miami Lakes and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – New Detached ADU in Miami Lakes

New double-hung windows in a dining room

Let’s put a real number on your detached ADU

A free on-site estimate for a new detached ADU in Miami Lakes starts with a walk of your lot, a look at setbacks and utility access, and a straight conversation about size, timeline and budget. Our team covers all of Miami Lakes, and a full project scope is easy to map as part of a Home Additions & ADU in Miami Lakes plan. Call (888) 418-7102 today, and a live person will pick up.

Written by the team at Groundwork Construction Co.

Why Miami Lakes Chooses Groundwork Construction Co. of Hialeah

We set the standard for new detached ADU in Miami Lakes.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Miami Lakes

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Miami Lakes Customers Say

Trusted by homeowners across Miami Lakes and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new bay window with a cushioned seatA new wood side gate with black hardwareA new concrete driveway with a paver borderA stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled hall bathroom with subway tile and a floating vanityA wood double vanity with two mirrors after a bathroom remodel

More services in Miami Lakes

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Hialeah

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Hialeah team

A local vetted partner works across Hialeah and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Miami Lakes?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Miami Lakes.

(888) 418-7102

Request a Free Estimate in Miami Lakes

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch