A Groundwork company - serving Hialeah, FL
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Hialeah Gardens, FL

New Detached ADU in Hialeah Gardens - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Hialeah
A remodeled family room with new windows and a window seat
A garage converted into a guest room and home office
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
A standing-seam metal roof over a covered porch
A new bay window with a cushioned seat
A new wood side gate with black hardware
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Hialeah Gardens: What It Takes and What It Costs

A new detached ADU in Hialeah Gardens is a freestanding, self-contained second home on your lot, and most projects here land between $45,000 and $130,000 depending on whether you’re building a simple one-bedroom unit or a full two-bedroom home with its own kitchen and laundry. Figure 4 to 8 months from the first footing to the certificate of occupancy. The tighter figure applies to a compact unit on a clean lot; the longer one covers a two-bedroom build squeezed onto an infill parcel where every inspection and delivery has to be staged. Call (888) 418-7102 and we’ll walk you through realistic numbers for your specific lot before you commit to anything.

Call (888) 418-7102

How we build a New Detached ADU in Hialeah Gardens, stage by stage

A finished backyard cottage with a small covered porch

Detached means we’re building a separate structure, so the sequence matters more than it does for a garage conversion or an interior job. Here’s what actually happens, and where you make decisions.

1. Site check and layout (weeks 1-2)

We measure the lot, mark setbacks, and confirm what your parcel can legally hold. In Hialeah Gardens the buildable envelope is usually the hard limit, not your budget. You decide the footprint and whether the unit sits in the backyard or along a side yard. This is also when we look at drainage and grade, because a detached structure changes how water moves across your property.

2. Design and permitting (weeks 3-10)

Drawings go to Miami-Dade County and the city for review, with zoning, setback, and floodplain checks running alongside. Permit timelines move at the speed of the review desk, so we file early and answer comments fast. You approve the plan set and finish schedule before we break ground. This is the longest waiting stretch, and it’s where most delays are won or lost.

3. Site prep, footing, and slab (weeks 11-14)

We clear, grade, and set forms for a reinforced slab on grade, tied to the soil and drainage conditions on your lot. Inspections happen at footing and slab stages. You’ll want to know what’s being poured and why, so we keep you posted. Concrete flatwork for the new walkway or driveway apron often gets done here, and many Hialeah Gardens homeowners pair this with Concrete Driveways & Concrete Work in Hialeah Gardens to keep one crew on site.

4. Framing and shell (weeks 15-22)

Concrete block walls, roof framing, and tie-downs go in with the hurricane straps and roof-to-wall connections that this climate demands. Windows and doors get installed early enough to dry in the structure before the afternoon rains arrive. You pick the impact ratings and the exterior finish here. If you want pavers around the new unit, we can fold it into the same schedule, which is why many owners also look at Paver Driveways in Hialeah Gardens at this stage.

5. Rough-in, finishes, and final inspection (weeks 23-34)

Electrical, plumbing, and HVAC rough-ins get inspected before the drywall goes up. Then insulation, drywall, cabinetry, flooring, fixtures, and paint. Final inspection and the certificate of occupancy close the job. If you’re adding a kitchenette or full kitchen in the unit, that’s a big decision here, and we’ll price both so you can see the difference before you commit. You’ll have decisions at every stage, and we’ll tell you when each is due so nothing holds up the next trade.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The options you’ll choose between for your New Detached ADU

Detached ADUs are flexible, and the choices you make early drive both the budget and how the unit feels to live in. Here’s the honest breakdown.

  • Footprint and layout: A one-bedroom, one-bath unit at roughly 500-600 sq ft keeps you near the low end of the range. A two-bedroom at 700-900 sq ft with its own living and kitchen area pushes toward the high end. The trade-off is straightforward: more square footage means more structure and more finish cost, but the unit earns more if you ever rent it.
  • Wall system: Concrete block is standard in Hialeah Gardens and matches the existing 1970s-1990s homes on the block. It handles wind and moisture well. Wood-frame or steel framing can be faster to erect, but block is the foolproof choice for hurricane-code compliance in this market.
  • Windows and doors: Impact-rated glazing is the practical default here. You can spec a lighter window and add shutters, but the labor to install and store them every storm season makes impact glass the more sensible long-term call. Budget accordingly; it’s not a place to cut corners.
  • Kitchen and bath level: A wet bar and a three-piece bath keeps costs down. A full kitchen with cabinets, counter, and a range adds real function. Brands like KraftMaid or a comparable line give you a durable cabinet that holds up to rental use, and we’ll price the grade you want.
  • Flooring: Tile is the norm here because of humidity and cleanup. Luxury vinyl plank is an affordable middle option. Hardwood is beautiful but less forgiving in this climate.
  • Roof: A flat or low-slope roof matches the neighborhood and often costs less than a pitched roof, but drainage and membrane quality matter more on flat profiles. We spec a system that handles the summer rain loads and ties into the hurricane strapping.

What a New Detached ADU costs in Hialeah Gardens, FL

A framer checking new wall framing on a home addition

Plan for $45,000 to $130,000. The low end is a compact one-bedroom unit on a clean, level lot. The high end is a two-bedroom with its own full kitchen, upgraded finishes, and more site work. Here’s what moves the number:

  • Size: Every additional 100 sq ft of conditioned space adds cost for framing, finishes, and systems. This is the single biggest lever.
  • Lot conditions: Tight infill lots along the Okeechobee Road corridor and near NW 103rd Street can need extra staging, shoring, or a re-grade. Shallow footings on older block lots sometimes need attention before we pour.
  • Utilities: A unit placed near existing water, sewer, and electrical runs saves money. Extending a sewer line or adding a panel upgrade moves you up the range.
  • Finish grade: Standard builder cabinets, tile, and fixtures sit at the low-to-mid range. Custom cabinetry, stone counters, and premium fixtures climb toward the top.
  • Permit scope: A straightforward build passes through review smoothly. A variance, floodplain review, or a lot that needs drainage work adds time and cost.

Our written estimates are line-item and upfront, so the number you see is the number you pay. We don’t hand you a one-line total and surprise you with change orders later. Financing is available at 0% for 18 months, and projects over $10,000 get $1,000 off. Most jobs also fall under the 730-Day Done Right Promise, which means if something isn’t done right, we make it right.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Hialeah Gardens lots specifically do to this job

Hialeah Gardens is a small, densely built city. Most construction here is infill on tiny lots squeezed between existing homes and businesses, not greenfield development. That reality shapes every detached ADU we build. Setbacks and lot coverage get tight fast, staging space is limited, and delivery trucks and material piles have to be scheduled around neighbors’ driveways. That’s before a single block is laid. The housing stock is dominated by 1970s-1990s concrete block single-family homes and small multifamily buildings, many with flat or low-slope roofs. Older block homes with shallow footings and minimal lot drainage often mean a detached build triggers a re-grade and a fresh look at the city’s floodplain rules, a step that catches out-of-town builders off guard. This is also a high-water-table, low-lying pocket of Miami-Dade, so drainage, flood elevation, and roof-to-wall tie-downs are all designed into the plan from day one. Hurricane-season wind loads drive the impact glazing and reinforced connections, and afternoon thunderstorms mean we dry in the shell before the rains hit. We cover the full Hialeah Gardens area, including the residential side streets off Okeechobee Road and around NW 103rd Street. And since this is part of a full Home Additions & ADU in Hialeah Gardens scope, we can bring the same crew through for the wider property improvements if you need them. If you’d like the broader picture of what we build, our Home Additions & ADU page covers the full range of work.

Serving Hialeah Gardens, FL – Our Local Coverage Area

We serve Hialeah Gardens and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked: New Detached ADU in Hialeah Gardens

A new concrete driveway with a paver border

Get a free on-site estimate for your New Detached ADU in Hialeah Gardens

Call (888) 418-7102 and we’ll schedule a free estimate at your property. We’ll look at the lot, confirm the setbacks and drainage reality, and put together a line-item number you can actually plan around. No pressure, no vague totals. Live person answers the phone 24/7, and every technician who shows up is background-checked and in uniform. When you’re ready to talk about a new detached ADU in Hialeah Gardens, we’re ready to price it.

Written by the team at Groundwork Construction Co.

Why Hialeah Gardens Chooses Groundwork Construction Co. of Hialeah

We set the standard for new detached ADU in Hialeah Gardens.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Hialeah Gardens

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Hialeah Gardens Customers Say

Trusted by homeowners across Hialeah Gardens and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled hall bathroom with subway tile and a floating vanityNew architectural shingles with a clean valleyA new casement window over a kitchen sinkA new white vinyl privacy fence with a double gateNew painted shaker cabinets with an organized deep drawer

More services in Hialeah Gardens

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Hialeah

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Hialeah team

A local vetted partner works across Hialeah and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Hialeah Gardens?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Hialeah Gardens.

(888) 418-7102

Request a Free Estimate in Hialeah Gardens

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch