A Groundwork company - serving Hialeah, FL
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Westchester, FL

Garage Conversion ADU in Westchester - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Hialeah
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
A new wood side gate with black hardware
A new concrete driveway with a paver border
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled hall bathroom with subway tile and a floating vanity
New architectural shingles with a clean valley
A new casement window over a kitchen sink
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Westchester, FL: What It Costs and How It Works

A garage conversion ADU in Westchester, FL typically runs $45,000 – $130,000, with most single-bay conversions landing in the $45,000 – $80,000 range and two-car conversions with a full kitchen and bath reaching the upper end. Plan on 10 to 16 weeks from permit submission to final inspection. The number that matters most is your garage: 1950s and 1960s concrete-block garages here need different work than a newer build. Call (888) 418-7102 for a free on-site estimate.

Call (888) 418-7102

How a Garage Conversion ADU Comes Together, Stage by Stage

A single-story rear room addition with tall windows and a new patio

Every conversion on our schedule follows the same five stages. The durations below are what we build into a Westchester estimate, and they assume the county permit is already issued.

Stage 1: Site and structure assessment (2 to 4 days)

We open the walls enough to see what the slab, tie-downs, and existing wiring actually look like. On a lot built in 1960, this is where we find whether the garage slab is thick enough for a finished floor and whether the roof-to-wall connections meet the high-velocity hurricane zone requirements in the Florida Building Code. You get a written scope before anything is demolished.

Stage 2: Demolition and slab prep (3 to 5 days)

Out go the garage door, tracks, opener, and any old shelving. We level the slab or pour a self-leveling underlayment, then cap the old plumbing and electrical penetrations. If your garage floods during summer downpours, this is the stage where we grade the exterior and set the finished floor height so water runs away from the door opening instead of toward it.

Stage 3: Framing, rough-in, and inspections (3 to 4 weeks)

We frame the new interior walls, add insulation to Miami-Dade energy code, run plumbing and electrical, and install the mini-split or ducted HVAC. The county does its rough-in inspection before any drywall goes up. You decide at this stage where the kitchenette goes, whether the bathroom gets a walk-in shower or a tub, and where the washer and dryer land.

Stage 4: Insulation, drywall, and finishes (4 to 6 weeks)

Mold-resistant drywall, moisture-rated assemblies, then flooring, paint, cabinets, counters, and fixtures. This is the longest stretch, and it is the one you will want to visit weekly. Fixtures like a Delta shower valve or a Moen kitchen faucet get chosen during the rough-in, not here.

Stage 5: Final inspection and punch list (1 to 2 weeks)

The county signs off on electrical, plumbing, mechanical, and building. We walk the unit with you, fix the punch list, and hand over the certificate of occupancy. If this conversion is part of a full Home Additions & ADU in Westchester project, the two scopes get pulled under one permit where that saves you fees.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Sort Through Before Framing Starts

Most of the decisions happen before demolition, and they drive the budget more than you might expect:

  • Studio versus one-bedroom layout. A studio fits any single-bay garage and costs the least, but a one-bedroom with a closet and a full bath adds $15,000 – $30,000 and rents for considerably more in this market.
  • Kitchenette versus full kitchen. A countertop with a sink, a two-burner cooktop, and a compact fridge runs $4,000 – $9,000. A full kitchen with a 30-inch range, dishwasher, and standard-depth refrigerator runs $12,000 – $22,000. Full kitchens take more electrical capacity and more space.
  • Bathroom fixtures. An American Standard or comparable tub-and-shower combo keeps the budget tight. A walk-in shower with tile runs higher but is what most renters and family members actually want.
  • Flooring. Luxury vinyl plank handles slab moisture and humidity far better than engineered hardwood, and it costs less. Porcelain tile is the most durable and the coldest underfoot.
  • HVAC. A ductless mini-split is the most practical choice for a converted garage because it avoids running ducts through a flat roof. A ducted system only makes sense if you are also conditioning the main house.
  • Exterior. A stucco-matched new wall and impact-rated windows or a new door keep the unit weatherproof and the exterior looking like it was always there. This is also where homeowners often pair the project with Asphalt Driveways & Resurfacing in Westchester to rework the parking they just lost.

What Garage Conversion ADU Costs in Westchester, FL

A framer checking new wall framing on a home addition

Expect $45,000 – $130,000 for a garage conversion ADU in Westchester. Below is how the number breaks down by scope and by the two variables that move it the most.

Scope Typical Westchester Range
Single-bay studio, kitchenette, half or three-quarter bath $45,000 – $65,000
Single-bay one-bedroom, full bath, full kitchen $65,000 – $95,000
Two-car one-bedroom, full kitchen, walk-in shower $95,000 – $130,000

What pushes a job toward the top of that range:

  • Existing condition. A garage with an undersized electrical panel or original galvanized supply lines needs a panel upgrade or a re-pipe before the unit can be legal. Both add real money.
  • Plumbing distance. Running a new drain line from the garage to the nearest main-house stack can add $3,000 – $8,000 depending on slab condition and distance.
  • Roof and tie-downs. If the garage roof needs replacement to satisfy current wind-load rules, that is a separate $8,000 – $20,000 line item.
  • Finish grade. Tile, custom cabinetry, upgraded fixtures, and impact-rated glazing all sit at the top of the schedule.
  • Permit scope. A unit with a kitchen is a different permit and inspection path than one without.

A written estimate from us lists the framing, rough-in, finishes, permit fees, and the inspection allowances separately. It does not include landscaping beyond regrading at the door, furniture, or appliance packages you buy yourself. Our Home Additions & ADU service covers the wider scope if the conversion is part of something larger.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Westchester Homes Specifically Do to This Job

Westchester is a built-out, post-WWII unincorporated Miami-Dade suburb, and that one fact shapes the work. Nearly every conversion we do here is a renovation of a 1950s-to-1970s single-family home on a slab-on-grade lot, not new construction, and every permit runs through Miami-Dade County’s unincorporated-area process rather than a city hall. That means plan review timelines and inspection scheduling that a builder used to a municipal building department will not anticipate. The typical Westchester garage is concrete block and stucco with a flat or low-slope roof, and a 60-year-old slab often needs leveling before you can put a finished floor on it. We routinely find original galvanized supply plumbing and panels that were barely sized for a house, never mind a second dwelling. Dense mature-lot infill on blocks around Bird Road and Coral Way also limits where a contractor can stage materials. We serve the full Westchester area and see the same pattern, project after project: the garage is sound, the systems inside it are not. Homeowners frequently pair the conversion with Concrete Driveways & Concrete Work in Westchester to add parking back.

Serving Westchester, FL – Our Local Coverage Area

We serve Westchester and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: Garage Conversion ADU in Westchester

A new roof with clean valleys and new flashing

Get a Free Estimate for Your Garage Conversion ADU

We will walk your garage, check the slab, panel, and plumbing, and hand you a written line-item estimate for a garage conversion ADU in Westchester with fixed pricing and no change-order surprises. The Home Additions & ADU in Westchester page has the wider project scope if you are considering more than the garage. Calls are answered by a live person, 24/7. Call (888) 418-7102 to schedule your free estimate.

Written by the team at Groundwork Construction Co.

Why Westchester Chooses Groundwork Construction Co. of Hialeah

We set the standard for garage conversion ADU in Westchester.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Westchester

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Westchester Customers Say

Trusted by homeowners across Westchester and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A remodeled primary bathroom with a soaking tub and walk-in showerA new clay tile roofNew double-hung windows in a dining roomA new front yard fence with a matching gateA new paver pool deckAn open kitchen and dining area after a remodel

More services in Westchester

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Hialeah

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Hialeah team

A local vetted partner works across Hialeah and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Westchester?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Westchester.

(888) 418-7102

Request a Free Estimate in Westchester

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch