A Groundwork company - serving Hialeah, FL
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Design & Permitting · Tamiami, FL

ADU Design & Permitting in Tamiami - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Hialeah
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
A standing-seam metal roof over a covered porch
A new bay window with a cushioned seat
A new wood side gate with black hardware
A new concrete driveway with a paver border
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Design & Permitting in Tamiami, FL: What It Takes and What It Costs

ADU design & permitting in Tamiami runs $53,100 to $153,400 for the design and approval phase of a detached or attached unit, and most projects take 4 to 7 months to move from first sketch to an issued building permit. The design work itself is a few weeks; the Miami-Dade County review, product approvals, and inspection scheduling are what stretch the calendar. Call (888) 418-7102 and we’ll walk you through what your lot can actually hold before you spend a dollar on drawings.

Call (888) 418-7102

How ADU Design & Permitting Moves From First Sketch to Issued Permit

A finished backyard cottage with a small covered porch

Here’s the honest sequence. Five stages, each with a decision that’s yours to make.

Stage 1 – Site survey and feasibility, week 1. We walk the lot at 33184 and check setbacks, easements, the location of the septic or sewer lateral, and how the water table sits on your parcel. On the low side of Tamiami this matters more than most homeowners expect. You decide at the end of this stage whether the unit goes detached in the backyard or attaches to the existing house. That choice drives everything downstream.

Stage 2 – Schematic design, weeks 2 through 4. We produce floor plans, elevations, and a site plan showing the unit’s footprint and utility runs. You pick the square footage and the bedroom count here. A 600-square-foot one-bedroom is a different permitting animal than an 800-square-foot two-bedroom, and the price gap between them is real. Most Tamiami lots in the 33184 ZIP comfortably fit a detached unit in the 600 to 750 square foot range.

Stage 3 – Construction documents and engineering, weeks 4 through 7. Stamped drawings, a wind-load analysis, tie-down details, and the product approval documentation. This is the stage outside contractors underestimate. Miami-Dade County requires a product control (NOA) approval number on every window, door, and roof fastener, and inspectors will reject a submittal that’s missing them. We compile that paperwork before the package goes in, not after a correction notice comes back.

Stage 4 – Permit submission and county review, weeks 7 through 16. The package goes to Miami-Dade County for building, zoning, and fire review. Review times move around depending on the county’s queue, and a correction cycle adds two to four weeks. We handle the resubmittals. You don’t chase the plans examiner.

Stage 5 – Permit issuance and inspection scheduling, weeks 16 through 20. Once the permit is issued, we set the inspection sequence: foundation, slab, framing, tie-down, rough-in, and final. You’ll know the first three dates before the crew breaks ground. If you’re coordinating this as part of a full Home Additions & ADU in Tamiami scope, the permit timeline dovetails with the site prep and utility work.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Design and Spec Choices That Shape Your ADU Permit

Not every decision is cosmetic. Several of these directly change what the county reviews and how long it takes.

  • Detached vs. attached. A detached unit needs its own utility trench and its own foundation package. Attached conversions share the existing service panel, which is usually faster to permit but caps your square footage.
  • Foundation type. On the drained wetland edge where the water table runs high, a slab-on-grade with a moisture barrier is common, but some lots need a raised stem wall or a deeper footing. That’s a site-specific call, not a design preference.
  • Impact glazing vs. shutters. Impact-rated windows carry their own NOA product approval and simplify inspection. Shutters are cheaper up front but add a compliance layer to the permit. Tamiami homeowners tend toward impact glazing because it also helps on insurance.
  • Roof system. A barrel-tile match to your existing CBS home looks right from the street; a standing-seam metal roof on the ADU holds up better against UV and salt air. Both permit fine. The tile costs less to match, the metal lasts longer.
  • Plumbing fixtures. Moen and Delta both publish product approval documentation that makes the rough-in inspection straightforward, so you’re not waiting on a spec sheet. Pick the finish you want, not the one that clears review faster.
  • Electrical service. A detached ADU usually needs its own panel and meter. Confirm your existing service has the capacity before design locks in.

What ADU Design & Permitting Costs in Tamiami, FL

A framer checking new wall framing on a home addition

Budget $53,100 to $153,400 for the design and permitting phase, sized to the unit you’re building. Here’s how a written estimate breaks down.

Line item Typical range
Site survey and feasibility study $1,500 – $3,500
Architectural design and construction documents $6,000 – $18,000
Structural and wind-load engineering $2,500 – $6,500
Miami-Dade permit and plan review fees $4,000 – $12,000
Product approval (NOA) documentation $1,000 – $3,500
Utility coordination and site planning $2,000 – $8,000
Full design-build coordination through issuance Balance of the $53,100 – $153,400 range

What pushes a job toward the high end: a lot with tough drainage that needs dewatering engineering, a detached unit with a full second bath, an attached design that forces a service panel upgrade, or a correction cycle that adds resubmittal costs. What keeps it low: a compact one-bedroom attached unit on a lot with clean setbacks. What’s included in our written estimate is the design, the engineering, the permit fees, and our coordination through issuance – no change orders once work starts. What isn’t included is the actual construction draw, separate from these figures, and any county impact fees that vary by parcel.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Tamiami Homes Specifically Do to This Job

This is where a Tamiami ADU stops looking like a Broward ADU. The 33184 area sits on Atlantic Coastal Ridge limestone at the edge of the drained Everglades wetlands, and the water table is high. For a detached unit, that means footing and slab work regularly hits standing water, and some lots need a dewatering plan before a single form goes in. We plan for it in the design, not after the excavator sinks. The other local layer is paperwork: Miami-Dade County expects a NOA approval number on every window and roof fastener, and contractors who learned the trade in Broward or Palm Beach routinely miss it, which triggers a correction cycle that adds a month. We work in the county’s product-control system by default.

The housing stock shapes the work too. Most Tamiami homes are 1970s through 2000s single-story concrete-block ranch and Mediterranean-style houses with CBS walls and barrel-tile roofs, and the lots have real backyard depth. When we design a detached unit behind a home on a street off SW 8th, we’re usually matching stucco to the main house and keeping the roof line low enough that the neighbor’s second-story infill next door doesn’t look over it. The salt-laden air also means we spec corrosion-resistant fasteners and a metal or tile roof that carries its approvals without fail. If you’re updating the front of the property at the same time, homeowners often pair this with Paver Driveways in Tamiami so the new unit has a proper approach.

Serving Tamiami, FL – Our Local Coverage Area

We serve Tamiami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – ADU Design & Permitting in Tamiami

New double-hung windows in a dining room

Get a Free On-Site Estimate for Your Tamiami ADU

We’ll come out to your lot in Tamiami, walk the setbacks, check how the water table sits on your parcel, and tell you what the county will and won’t approve before you commit to drawings. Call (888) 418-7102 to schedule the visit. The estimate is written, line-item, and free, and we handle the full scope through our Home Additions & ADU service. If the front yard comes up in the plan, homeowners often pair this with Chain Link Fence in Tamiami to close off the work zone.

Written by the team at Groundwork Construction Co.

Why Tamiami Chooses Groundwork Construction Co. of Hialeah

We set the standard for ADU design & permitting in Tamiami.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Tamiami

Getting your ADU design & permitting project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU design & permitting project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU design & permitting pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Tamiami Customers Say

Trusted by homeowners across Tamiami and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A remodeled primary bathroom with a soaking tub and walk-in showerA new clay tile roofA new front yard fence with a matching gateA new paver pool deckAn open kitchen and dining area after a remodelA freestanding soaking tub in a remodeled primary bathroom

More services in Tamiami

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Hialeah

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Hialeah team

A local vetted partner works across Hialeah and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Design & Permitting in Tamiami?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Tamiami.

(888) 418-7102

Request a Free Estimate in Tamiami

Tell us about your ADU design & permitting needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch