







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Fountainebleau, FL: What the Job Really Takes
Cabinets & countertops in Fountainebleau usually run $14,000 – $45,000 for a full tear-out and replacement, and most of the in-unit work takes two to three weeks once the order is released. The countertop template alone adds a week, because nothing can be cut until the cabinets are set and level. Call (888) 418-7102 for a free on-site estimate before you commit to a door style or slab.
How Groundwork Handles Cabinets & Countertops, Stage by Stage

Here’s the honest sequence. No two Fountainebleau jobs run identical, but this is the arc most of them follow, and it’s the part other contractors tend to gloss over.
1. Measure, scope, and HOA review (days 1 – 5)
We measure every wall and check for out-of-square corners – common in the 1970s – 80s mid-rise units around Fountainebleau. If your community has an architectural review board, we pull the approved door style and finish list before you order anything, so you’re not stuck with cabinets the HOA rejects. You decide the layout, door profile, and material grade here.
2. Cabinet order and lead time (weeks 2 – 5)
Most semi-custom and stock lines land in three to five weeks. You confirm door style, finish, and hardware now – changes after this point cost money and reset the clock. We coordinate the countertop shop’s template window against the delivery date so nothing sits.
3. Demo and prep (days 1 – 3 on site)
Old cabinets come out, walls get patched and squared, and we check for moisture damage hiding behind the old boxes – something we see often in Fountainebleau’s condo stock after years of humidity. Plumbing and electrical stubs get relocated only if the layout demands it. You approve any structural or plumbing move before we cut.
4. Cabinet set and template (days 3 – 7)
Bases and uppers go in, level and shimmed. The countertop fabricator templates here – this is the step most homeowners don’t plan for, and it’s why a fast-looking job can still take a week longer than expected. Nothing gets fabricated until the template is signed.
5. Countertop install and finish (days 10 – 18)
Slabs are cut, delivered, and set. Sink, faucet, and any backsplash run get finished, and we walk the job with you before final sign-off. Total schedule for a mid-size kitchen: three to four weeks of active work, longer if the cabinets are custom or the countertop is a specialty stone.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Actually Decide Your Cabinets & Countertops
Every kitchen we do in Fountainebleau comes down to the same handful of decisions. Here’s what you’re picking between, and the honest trade-off on each.
- Cabinet box construction: particleboard is cheaper and fine in a dry, well-vented unit; plywood holds up better in South Florida humidity and costs more. For a condo where windows stay shut and AC runs hard, plywood is the safer call.
- Door style and finish: thermofoil is budget-friendly but can peel in heat; painted MDF and solid wood doors last longer. If your HOA restricts door profiles, this is where the fight usually happens – check first.
- Countertop material: quartz and granite dominate because they resist stains and heat, and both fit most budgets in the $2,000 – $6,500 countertop range. Butcher block and laminate are cheaper but need more care in a humid climate.
- Hardware: soft-close hinges and drawer slides are a modest upcharge and worth it. Standard slides are the first thing to fail.
- Sink and faucet: an undermount sink needs its countertop cut to fit, so this decision happens before fabrication, not after.
What Cabinets & Countertops Costs in Fountainebleau, FL

For a full cabinet and countertop replacement in a Fountainebleau kitchen, expect $14,000 – $45,000. A smaller galley or condo kitchen using stock cabinets and quartz more often lands in the $9,000 – $20,000 range. Countertop installation alone runs $2,000 – $6,500, cabinet installation $4,000 – $13,000, and a kitchen island adds $3,000 – $10,000 if you want one.
What pushes a job toward the top of that range: kitchen size, custom versus stock cabinets, plumbing or electrical relocation, structural changes, and material grade. Moving a sink or range hood means new supply lines and venting, and that alone can add thousands. A condo with strict HOA rules and a slow approval process can also stretch the timeline and the budget.
A written estimate from us lists cabinet line and grade, countertop material and square footage, hardware, installation labor, and permit costs if any apply. What it typically won’t cover: appliance costs, backsplash tile (that’s a separate scope), or unforeseen moisture or structural repair found during demo. We confirm any surprise in writing before touching it.
See the difference
Before
After
Before
After
Before
AfterWhat Fountainebleau Homes Specifically Do to This Job
Fountainebleau isn’t a subdivision of identical single-family homes – it’s a dense cluster of 1970s – 80s mid-rise condos and townhomes in ZIP 33172, and that changes the job. Miami-Dade’s 40-year recertification on aging buildings drives a steady stream of concrete restoration and life-safety work, and in-unit renovations have to respect both the building’s structural rules and the community’s architectural review board. That review board is the single biggest delay we see: door profiles, finish colors, and even hardware can fall under HOA approval, and skipping that step can mean reordering cabinets.
Inside the unit, the humidity and intense sun mean we favor moisture-resistant box construction and UV-stable finishes. Scheduling is also a factor – afternoon thunderstorms and permit deadlines tied to storm readiness can shift install days. Most of the kitchens we do here sit in condo towers or townhome communities, and a fair share are paired with Garage Conversion ADU in Fountainebleau projects where a second kitchen is added. If the cabinetry is part of a larger scope, see Kitchen Remodeling in Fountainebleau for how the full project fits together, or Fountainebleau for our coverage across the area.
Serving Fountainebleau, FL – Our Local Coverage Area
We serve Fountainebleau and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in Fountainebleau

Plan on three to four weeks of active work for a standard kitchen, plus a three-to-five-week cabinet lead time and a one-week countertop template-and-cut window. HOA approval in a Fountainebleau condo community can add one to three weeks before anything is ordered. Call (888) 418-7102 to get a timeline for your specific unit.
Straight replacement in the same footprint usually doesn’t require a permit, but any plumbing, electrical, or structural change does, and Miami-Dade County enforces that. We confirm the scope in writing and pull permits where they’re required. If you’re not sure, call (888) 418-7102 and we’ll tell you before you order.
Yes – a like-for-like replacement keeps the sink, range, and outlets where they are and is the cheapest path. Moving a sink, adding an island, or relocating a range hood is a different job with a different price tag. We’ll show you both options in the estimate.
A full replacement runs $14,000 – $45,000, while countertop installation alone is $2,000 – $6,500 and cabinet installation alone is $4,000 – $13,000. The range depends on size, cabinet grade, countertop material, and whether you move plumbing or structure. Call (888) 418-7102 – estimates are free and itemized.
Every cabinets & countertops project is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in residential construction. We also stand behind the material warranties from our cabinet and countertop partners.
Ready to Price Cabinets & Countertops in Fountainebleau?
The fastest way to get a real number is a free on-site estimate. A live person answers (888) 418-7102 around the clock, and we’ll walk your kitchen, check the HOA rules, and leave you with an itemized price – no pressure, no surprise line items. If this is part of a larger plan, our kitchen remodeling service covers the whole scope, and New Detached ADU in Fountainebleau projects often include a second set of cabinets. Call today.
Written by the team at Groundwork Construction Co.












