







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Sweetwater, FL: What the Job Really Costs and How Long It Takes
Replacing cabinets and countertops in Sweetwater, FL usually runs $4,000 – $13,000 for the cabinet package and $2,000 – $6,500 for the counters, with a full tear-out-and-replace landing between $14,000 and $45,000 when you add the island, backsplash and the small electrical and plumbing moves that come with them. Most single-room jobs take two to four weeks from demo to final walkthrough. Call (888) 418-7102 and we’ll walk your kitchen and give you a written, line-item number before anything gets ordered.
One thing to know up front: on Sweetwater’s older block homes, the cabinets rarely come out clean. What’s behind them is the real variable, and that’s where we start the conversation.
How we run a cabinet and countertop job, stage by stage

This is a five-stage sequence, not a one-week drop-in. Here’s the honest version so you know what each week looks like and what you’ll be deciding.
Stage 1: Measure, layout and product selection (days 1 – 5)
We template the kitchen as it sits today and confirm the layout: cabinet run lengths, sink and range positions, dishwasher clearance, and whether the island fits without pinching the walkway. You make three decisions here: door style and finish, box construction, and countertop material. Nothing gets ordered until we’ve confirmed the measurements on site and checked sight lines against the window and doorway.
Stage 2: Demo and substrate repair (1 – 2 days)
Old cabinets, countertops and backsplash come out. On the 1970s-80s Sweetwater homes we work in, this stage is where we find out what’s under there: drywall softened by an old sink leak, furring strips anchored into block, or a soffit that has to come down. We photograph everything and tell you the same day if the number needs to move, before we keep going.
Stage 3: Rough electrical and plumbing (1 – 2 days, if needed)
Moving a sink, adding an outlet for a microwave drawer, or switching from a recirculating to a vented hood means rough work before the boxes go in. This is the stage that most often catches homeowners off guard, so we flag it at estimate time, not demo day. If the City of Sweetwater requires an inspection for the electrical or plumbing scope, this is when it happens.
Stage 4: Cabinet install and countertop template (2 – 3 days, then 5 – 10 days wait)
Boxes go in level and shimmed, uppers get hung, and doors and drawers get aligned. Then the countertop fabricator comes to template. Stone gets cut off-site, so plan on a one- to two-week gap in the middle of the job where your kitchen is closed. We tell you the exact gap in writing so you can plan meals and dishwashing.
Stage 5: Countertop set, plumbing trim and punch list (2 – 3 days)
Counters get set and seamed, the sink and faucet get connected, the disposal goes back in, and we run a leak check plus a door-and-drawer alignment pass. You walk it with us and we sign off the punch list. Everything here is covered by our 730-Day Done Right Promise, so if a drawer glides wrong or a seam reads off six months in, we come back.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices you’ll actually weigh, and what each one costs you
Material selection is where a Sweetwater cabinet and countertop job is won or lost. The trade-offs are real, and they’re not all about price.
- Stock vs. semi-custom cabinets: Stock boxes are fastest and cheapest but limit you to fixed sizes, which means filler strips in an oddly shaped Sweetwater kitchen. Semi-custom lets you size the run to the room and usually pays for itself in a cleaner look, at roughly 15 – 25% more on the cabinet line. Full custom is a real step up and rarely necessary in these homes.
- Box construction and drawer hardware: Particleboard boxes are fine in a dry room but don’t love moisture; plywood boxes hold up better over time. Soft-close undermount glides are worth the small upgrade; you’ll feel the difference every day.
- Quartz vs. granite vs. laminate: Quartz is non-porous and needs no sealing, which suits a humid South Florida kitchen. Granite is durable and unique but needs periodic sealing. Laminate is the budget option and has improved a lot, though it can chip at edges.
- Sink and faucet: An undermount single-basin sink with a quality pull-down faucet from Delta or Moen is the standard we recommend; combine it with a Blanco sink if you want a specific composite finish. Skip the bargain faucet if the cabinet run is a long-term hold.
- Island configuration: A fixed island adds prep space and storage but locks in your walking lanes; a movable cart is flexible but reads temporary. If your Sweetwater kitchen is narrow, a peninsula often beats an island.
What Cabinets & Countertops cost in Sweetwater, FL

The range for this work is $14,000 – $45,000 when it’s part of a wider remodel, and a stand-alone cabinet-plus-counter swap typically lands well below that top end. Here’s how the line items break out:
| Line item | Typical range |
|---|---|
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash installation | $800 – $2,500 |
| Kitchen island installation | $3,000 – $10,000 |
Four things push a job toward the low or high end. Kitchen size and cabinet linear footage drives most of it. Existing condition matters more in Sweetwater than most people expect, because a 1970s kitchen often hides water damage or old wiring that has to be corrected before new boxes go in. Relocating plumbing, gas or electrical adds rough-in cost and possibly a permit and inspection. Material grade – laminate versus quartz, stock versus semi-custom – can swing the total by several thousand dollars on its own. A written estimate from us lists the cabinet line, the countertop slab and fabrication, the install labor, haul-away, and the permit line separately, and we don’t change that number because of a surprise we should have caught. What’s typically not included: appliance purchases, structural wall removal, and the finish plumbing and electrical fixtures, though we can price them for you.
See the difference
Before
After
Before
After
Before
AfterWhat Sweetwater homes specifically do to this job
Sweetwater is a small, densely built city in western Miami-Dade (ZIP 33112) where just about every cabinet and countertop job happens on a tight infill lot in a mid-century or 1970s-80s concrete block home, often one that’s being expanded or rebuilt rather than replaced. That build era shapes the work. Original aluminum wiring in these homes needs evaluation before we add a microwave circuit or a dedicated outlet, and cast-iron drain lines under old sinks are worth a look before the new cabinet goes over them. City of Sweetwater permits, setbacks and lot-coverage rules – not Miami-Dade alone – govern the scope here, so if your project is part of a bigger footprint change, plan the zoning review before framing. The city’s largely Spanish-first homeowner base means we walk the plan and the inspection schedule in Spanish when that’s easier for the family. And South Florida’s heat and humidity make moisture management the quiet priority: we use mold-resistant assemblies and check every sink base for leaks, because a Sweetwater kitchen that stays damp will cost you the cabinets again in ten years. When the cabinetry work is the front end of a larger scope, homeowners often pair it with a Kitchen Remodeling in Sweetwater plan, or with a Garage Conversion ADU in Sweetwater when the old kitchen footprint is about to become a rental or guest suite.
If the cabinet job is part of a wider rebuild, it’s worth seeing how our Kitchen Remodeling service ties the trades together, and you can see the Sweetwater area we cover. Homeowners here also pair this with a New Detached ADU in Sweetwater when the family is growing.
Serving Sweetwater, FL – Our Local Coverage Area
We serve Sweetwater and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked: Cabinets & Countertops in Sweetwater

Plan on two to four weeks total, with a one- to two-week gap built in for stone fabrication between cabinet install and counter set. The gap is the part most people don’t expect. If you choose laminate or a stocked counter, the gap shrinks or disappears. Call (888) 418-7102 and we’ll give you a dated schedule for your Sweetwater kitchen.
Straight cabinet and counter replacement usually doesn’t require a permit, but moving plumbing, gas or electrical does, and that’s when a City of Sweetwater inspection enters the picture. We tell you at estimate time which parts of your job need one. Call (888) 418-7102 for a free on-site read on your scope.
Yes, and most of the Sweetwater jobs we do keep the sink and range where they are. Same-location swaps skip the rough-in, permit and inspection, which is the single biggest way to keep the number down. If you want the sink under the window instead of in the corner, that’s doable, just budget for the rough work. Call (888) 418-7102 to talk through which layout you want.
Cabinet installation runs $4,000 – $13,000 and countertop installation runs $2,000 – $6,500, with a full package typically landing between $14,000 and $45,000. The swing comes from kitchen size, condition behind the old cabinets, and material grade. Call (888) 418-7102 for an exact written quote, free of charge.
Every cabinet and countertop job we finish is backed by our 730-Day Done Right Promise: if it’s not done right, we make it right, for two full years. That covers the install labor and workmanship, and it’s in writing. Call (888) 418-7102 to schedule your free estimate and design consult.
Get a written estimate on your Sweetwater cabinet and countertop job
Call (888) 418-7102 for a free on-site estimate. We’ll measure the kitchen, look behind the old cabinets, and hand you a line-item number with no surprises plus a real schedule. A live person answers around the clock, technicians come background-checked and in uniform, and projects over $10,000 get $1,000 off with 0% financing for 18 months available. Call today to get your Sweetwater kitchen priced.
Written by the team at Groundwork Construction Co.












